ABEIMA

Approved by: EM039


Steel Structures

Project Name: Shuaibah III Expansion II Desalination Plant Date:

Reference document nº: Quantity:

Revision nº: Element:

Preparation Checklist Type of Inpection Supplier Initials Abeima Initials Date

Check geometrical dimensions of steel columns/beams/perlings Document

Check thickness of weldings Document

Check thickness of painting Document

Check bolts and washer Visual/Test

Check location of installation (beams,colums,etc) Survey

If roof, check sheeting dimensions and installation Document

Comments: The tolerances shall be according drawings and chinese standard

Final Approval by: Supplier Abeima Client

Name:

Signature:

Date:
Fisia-Abeima