Sie sind auf Seite 1von 7

GOVERNMENT OF TELANGANA

ABSTRACT

Panchayat Raj & Rural Development Department – PMGSY - LWE Batch II


Proposals of 2017-18 - Administrative Clearance of 50 Road Works and 4
Bridge works – Permission accorded with an estimated cost of Rs.56.11
Crores including GoI and State share under PMGSY Batch-II apart from an
amount of Rs.3.146 Crores (Rs.2.822 Cr. + Rs.0.324 Cr.) towards routine
maintenance of Roads and Bridges respectively shall be born by the State
Government– Accorded – Orders – Issued.
-------------------------------------------------------------------------------------
PANCHAYAT RAJ AND RURAL DEVELOPMENT (Progs.II ) DEPARTMENT
G.O.Rt.No.16 Dated.10.01.2018
Read following
1.Lr.No.P-17024/29/2017-RC, dated 27.11.2017 of GOI, MoRD.
- Communicating Administrative Clearance Orders.
2.From the CE, PR, PMGSY, Hyderabad, Lr.No.W1/DEE.I/
PMGSY/Proposals/2017, Dt.27.11.2017.
&&&&
ORDER:
In the reference 2nd read above, the Chief Engineer, Panchayat Raj,
PMGSY, Hyderabad has stated that the Ministry of Rural Development, GoI
have accorded administrative clearance for PMGSY Batch II proposals for the
year 2017-18 vide reference 1st read above and the details of cleared
proposals of Roads and Bridges are as follows:
(Rupees in Crores)
New
Items LSBs Total
connectivity
-Roads
Value in Rs Crore 44.52 11.59 56.11*

No. of works 50 4 50 roads


4 Bridges
366.98 97.58 Kms roads
Length/Span 97.58 km 366.98 mtrs
Mtrs
bridges
4 of 250+,
Habitations 38 of 100-249
benefitted & 2 clusters of
100+

*MoRD Share : Rs. 31.40 Crores; State Share : Rs. 24.71 Crores

As per PMGSY New guidelines the funding pattern is as follows:-

i) For Roads in all Areas - 60% Centre share and 40% State
share.
ii) For Bridges up to 100 m length &
5.50 m width in IAP District - 60% Centre share and 40% State
share.
iii) For Bridge length upto 100 Mts length & Width 5.50 m in IAP
Districts the sharing pattern of GOI and State is 60%:40%- Further
Length above 100 Mts and width above 5.50 Mts, the total excess
cost has to be borne by the state 100%. (Cleared Bridges are
proposed with 7.50 m width).

2. After careful examination of the proposal, Government hereby accord


administrative sanction for 50 road works and 4 Bridges, for both
construction and maintenance (maintenance shall from integral part of
Contract Agreement as per PMGSY guidelines). The list of roads and Bridge
works are enclosed in annexures I & II.

(PTO)
-2-

3. The Chief Engineer, Panchayat Raj, PMGSY, Hyderabad shall take


necessary action in the matter accordingly.

4. This order issues with the concurrence of the Finance (EBS.VIII)


Department vide their U.O.No.14830/452/A1/EBS.VIII/2017, dt:23.12.2017.

(BY ORDER AND IN THE NAME OF THE GOVERNOR OF TELANGANA)


VIKAS RAJ
PRINCIPAL SECRETARY TO GOVERNMENT(FAC)

To
The Chief Engineer, Panchayat Raj,
PMGSY, Hyderabad.
copy to:-
The Engineer-in-Chief (i/c), Panchayat Raj, Hyderabad.
The OSD to Hon’ble Minister (PR&RD)
SF/SC.

//FORWARDED::BY ORDER//

SECTION OFFICER
Annexure to Go.Rt.No.16, PR&RD(Progs.II)Dept., Dt.10.01.2018
PMGSY PHASE XII Batch II (Year 2017-18) ADMINISTRATIVE CLEARANCE - ABSTRACT

I) Road Works

MoRD State Maintenan


S. No. of Total Cost
New District Length in Km Share Share ce Cost
No Roads (in Lakhs)
(in Lakhs) (in Lakhs) (in Lakhs)

1 Bhadradri Kothagudem 15 41.780 1143.51 762.34 1905.85 118.52


2 Jayashankar - Bhupalpally 8 12.755 354.69 236.46 591.15 39.26
3 Mahabubabad 27 43.046 1173.10 782.07 1955.17 124.40
Roads Total 50 97.581 2671.30 1780.87 4452.17 282.18

II) Bridge works

MoRD State Maintenan


S. No. of Total Cost
New District Length in mtrs Share Share ce Cost (in
No Bridges (in Lakhs)
(in Lakhs) (in Lakhs) Lakhs)

1 Bhadradri Kothagudem 2 178.600 186.66 330.34 517.00 13.74

2 Jayashankar - Bhupalpally 1 51.160 98.12 124.88 223.00 5.00

3 Mahabubabad 1 137.220 183.65 235.35 419.00 13.69

Bridges Total 4 366.98 468.43 690.57 1159.00 32.43


97.581 Km Roads &
Grand Total 54 3139.73 2471.44 5611.17 314.61
366.98 mtrs Bridges

VIKAS RAJ
PRINCIPAL SECRETARY TO GOVERNMENT(FAC)
//FORWARDED::BY ORDER//
SECTION OFFICER
Annexure - I to Go.Rt.No.16, PR&RD(Progs.II)Dept., Dt.10.01.2018

Road Works Cleared by MoRD Under PMGSY PHASE XII - Batch II (Year 2017-18)

Paveme
MoRD State Maintenan
Sr. Package Road/ nt
District New District Block Year Batch Road Name Share (in Share (in Total Cost ce Cost (in
No Number Bridge Length
Lakhs) Lakhs) Lakhs)
(in Kms.)
Khamma Bhadradri TS3XI10 2017 - L034-ZP road at Chinthaguppa to
1 Cherla Road Batch II 1.50 39.60 26.40 66.00 3.96
m Kothagudem 1 2018 Burugupadu
Khamma Bhadradri TS3XI10 2017 -
2 Cherla Road Batch II L032-ZP road to N.Kothuru 1.10 26.40 17.60 44.00 2.65
m Kothagudem 2 2018
Khamma Bhadradri TS3XI10 2017 - L031-ZP road at Chelamala to
3 Cherla Road Batch II 2.23 60.63 40.42 101.05 6.25
m Kothagudem 3 2018 Uyyalamadugu
Khamma Bhadradri TS3XI10 2017 -
4 Cherla Road Batch II L037-R and B road to Dandupeta 2.25 56.40 37.60 94.00 5.64
m Kothagudem 4 2018
Khamma Bhadradri Dummug TS3XI10 2017 -
5 Road Batch II L061-ZP road to Tailorpeta 0.85 21.90 14.60 36.50 2.19
m Kothagudem udem 5 2018
Khamma Bhadradri Dummug TS3XI10 2017 - L058-R and B road to
6 Road Batch II 0.95 25.20 16.80 42.00 2.76
m Kothagudem udem 6 2018 Venkatarampuram
Khamma Bhadradri Dummug TS3XI10 2017 - L057-ZP road Singhavaram to
7 Road Batch II 3.00 89.76 59.84 149.60 9.66
m Kothagudem udem 7 2018 N.Lakshimipuram
Khamma Bhadradri Dummug TS03XI0 2017 - L056-R and B road to
8 Road Batch II 4.00 109.50 73.00 182.50 11.60
m Kothagudem udem 9 2018 Kommanapally
Khamma Bhadradri TS03XI3 2017 - L038-R and B road Jagguthanda to
9 Gundala Road Batch II 8.20 155.40 103.60 259.00 15.54
m Kothagudem 1 2018 Jinnelagudem
Khamma Bhadradri TS03XI5 2017 -
10 Gundala Road Batch II L039-Settipally to Lingapuram 9.25 320.07 213.38 533.45 33.60
m Kothagudem 8 2018
Khamma Bhadradri TS3XI10 2017 -
11 Gundala Road Batch II L031-Markodu to Pedduru 1.40 38.10 25.40 63.50 3.81
m Kothagudem 8 2018
Khamma Bhadradri TS3XI10 2017 -
12 Gundala Road Batch II L037-R and B road to Tirlapuram 1.00 27.00 18.00 45.00 2.71
m Kothagudem 9 2018
Khamma Bhadradri TS03XI3 2017 - L044-Modugulagudem to
13 Gundala Road Batch II 4.00 115.83 77.22 193.05 11.88
m Kothagudem 3 2018 Sajjalabodu
Khamma Bhadradri Palawan TS03XI7 2017 - ML02-R and B road at Kodipunjula
14 Road Batch II 0.85 22.50 15.00 37.50 2.25
m Kothagudem cha 8 2018 thanda to Pusalathanda
Khamma Bhadradri Palawan TS03XI8 2017 -
15 Road Batch II ML04-R and B road to Bojyathanda 1.20 35.22 23.48 58.70 4.02
m Kothagudem cha 8 2018
Bhadradri Kothagudem Total 41.78 1143.51 762.34 1905.85 118.52
Jayashankar - Venkata TS09XIL 2017 -
16 Warangal Road Batch II L025-Nallagunta to Gamponipally 1.30 31.20 20.80 52.00 3.15
Bhupalpally pur W68 2018
Jayashankar - Venkata TS09XIL 2017 -
17 Warangal Road Batch II L028-Thimmapur to Ramaraopally 2.80 80.37 53.58 133.95 8.55
Bhupalpally pur W69 2018
Paveme
MoRD State Maintenan
Sr. Package Road/ nt
District New District Block Year Batch Road Name Share (in Share (in Total Cost ce Cost (in
No Number Bridge Length
Lakhs) Lakhs) Lakhs)
(in Kms.)
Jayashankar - Venkata TS09XIL 2017 -
18 Warangal Road Batch II L031-Peddapur to Harijanawada 0.98 30.12 20.08 50.20 3.35
Bhupalpally pur W70 2018
Jayashankar - Venkata TS09XIL 2017 -
19 Warangal Road Batch II L034-PWD Road to Laxmipur 1.48 40.50 27.00 67.50 4.08
Bhupalpally pur W72 2018
Jayashankar - Venkata TS09XIL 2017 -
20 Warangal Road Batch II L042-Chatrajpally to Thimmapur 1.45 40.38 26.92 67.30 4.70
Bhupalpally pur W73 2018
Jayashankar - Venkata TS09XIL 2017 - L045-Mahatmanagar to
21 Warangal Road Batch II 1.48 41.07 27.38 68.45 4.40
Bhupalpally pur W74 2018 Gopaiahpally
L046-PWD road T01 at
Jayashankar - Venkata TS09XIL 2017 -
22 Warangal Road Batch II Subbakkapally to 1.58 36.24 24.16 60.40 4.85
Bhupalpally pur W75 2018
Battupally(Mallaiahpally)
Khamma Jayashankar - Venkata TS3XI11 2017 - L035-R and B road to
23 Road Batch II 1.70 54.81 36.54 91.35 6.18
m Bhupalpally puram 0 2018 Chinagangaram
Jayashankar - Bhupalpally Total 12.76 354.69 236.46 591.15 39.26
Khamma Garlabay TS03XI5 2017 -
24 Mahabubabad Road Batch II L037-ZP Road to Laxmathanda 2.10 55.80 37.20 93.00 5.51
m yaram 2 2018
TS09XIL 2017 - ML03-L031 to Macherla to
25 Warangal Mahabubabad Gudur Road Batch II 2.43 65.46 43.64 109.10 7.33
W23 2018 Bethamcherla(New Colony)
TS09XIL 2017 -
26 Warangal Mahabubabad Gudur Road Batch II L056-Rajanpally to Jillella 0.98 24.60 16.40 41.00 2.17
W06 2018
TS09XIL 2017 - L037-Boddugonda to chinnagandi
27 Warangal Mahabubabad Gudur Road Batch II 1.80 48.60 32.40 81.00 4.73
W03 2018 thanda
TS09XIL 2017 - L074-ZP Road to Banoth Bheemla
28 Warangal Mahabubabad Gudur Road Batch II 0.61 19.64 13.09 32.73 2.34
W12 2018 thanda
TS09XIL 2017 - L083-R and B road to Tejavath
29 Warangal Mahabubabad Gudur Road Batch II 0.65 17.82 11.88 29.70 1.83
W18 2018 Goriya thanda
L086-PR road Dapputhanda to
TS09XIL 2017 -
30 Warangal Mahabubabad Gudur Road Batch II Mangyathanda,Kopithanda,Vagyath 1.81 58.50 39.00 97.50 4.13
W20 2018
anda
TS09XIL 2017 - L087-PR Road at Dappu Thanda to
31 Warangal Mahabubabad Gudur Road Batch II 0.75 24.09 16.06 40.15 2.50
W21 2018 Panthulya thanda
TS09XIL 2017 -
32 Warangal Mahabubabad Gudur Road Batch II L084-R and B road to Surya thanda 1.90 50.70 33.80 84.50 5.00
W17 2018
TS09XIL 2017 -
33 Warangal Mahabubabad Gudur Road Batch II L070-Epur to Kodipunjula thanda 1.75 41.70 27.80 69.50 4.17
W10 2018
TS09XIL 2017 -
34 Warangal Mahabubabad Gudur Road Batch II L039-Kollapur to ippalthanda 0.94 27.20 18.14 45.34 3.41
W04 2018
Paveme
MoRD State Maintenan
Sr. Package Road/ nt
District New District Block Year Batch Road Name Share (in Share (in Total Cost ce Cost (in
No Number Bridge Length
Lakhs) Lakhs) Lakhs)
(in Kms.)
TS09XIL 2017 - ML02-Chakru thanda to Bancharai
35 Warangal Mahabubabad Gudur Road Batch II 2.80 51.00 34.00 85.00 5.10
W16 2018 thanda
Kothagu TS09XIL 2017 - L062-T02 near Pakhal lake to
36 Warangal Mahabubabad Road Batch II 4.70 133.80 89.20 223.00 16.30
da W39 2018 Gundam thanda
Kothagu TS09XIL 2017 - ML05-ZP road near Thimmapur
37 Warangal Mahabubabad Road Batch II 1.48 40.08 26.72 66.80 4.40
da W33 2018 L026 to Gundamthanda
TS09XIL 2017 -
38 Warangal Mahabubabad Maripeda Road Batch II L022-PWD road to Galivarigudem 1.05 39.60 26.40 66.00 4.47
W41 2018
L072-PWD road to Pathikunta
TS09XIL 2017 -
39 Warangal Mahabubabad Maripeda Road Batch II thanda(Jathoth thanda) via 2.60 74.91 49.94 124.85 8.42
W42 2018
Abbaipalem
TS09XIL 2017 - L059-Balinidharmaram to
40 Warangal Mahabubabad Maripeda Road Batch II 2.70 75.27 50.18 125.45 8.39
W47 2018 Mansinghthanda
TS09XIL 2017 - L063-PR road to Anekatta thanda
41 Warangal Mahabubabad Maripeda Road Batch II 0.83 21.63 14.42 36.05 2.40
W51 2018 H/o Thanamcherla
TS09XIL 2017 - L065-PWD road T04 to Chepur
42 Warangal Mahabubabad Maripeda Road Batch II 0.53 14.40 9.60 24.00 1.44
W53 2018 thanda
TS09XIL 2017 - L066-Burhanpuram to Vachya
43 Warangal Mahabubabad Maripeda Road Batch II 2.40 63.69 42.46 106.15 6.96
W54 2018 thanda
TS09XIL 2017 - L071-T03 PWD road to
44 Warangal Mahabubabad Maripeda Road Batch II 1.25 32.49 21.66 54.15 3.46
W59 2018 Mallammakunta thanda
TS09XIL 2017 - L061-PWD road Komatikunta
45 Warangal Mahabubabad Maripeda Road Batch II 0.51 18.00 12.00 30.00 1.80
W49 2018 thanda
TS09XIL 2017 - L069-T05 PWD road to Peerya
46 Warangal Mahabubabad Maripeda Road Batch II 0.51 14.49 9.66 24.15 1.50
W57 2018 thanda
TS09XIL 2017 - L070-PWD road T03 to Bothala
47 Warangal Mahabubabad Maripeda Road Batch II 0.95 25.17 16.78 41.95 2.70
W58 2018 thanda
TS09XIL 2017 -
48 Warangal Mahabubabad Maripeda Road Batch II ML08-Maripeda to Giripuram thanda 2.55 69.00 46.00 115.00 6.90
W63 2018
TS09XIL 2017 - L057-PWD road(Yellampet) to
49 Warangal Mahabubabad Maripeda Road Batch II 0.92 24.75 16.50 41.25 2.64
W45 2018 Jarupula thanda via Samya thanda
TS09XIL 2017 - L068-Reddy thanda PR road to
50 Warangal Mahabubabad Maripeda Road Batch II 1.58 40.71 27.14 67.85 4.40
W56 2018 Dakna thanda
Mahabubabad Total 43.05 1173.10 782.07 1955.17 124.40
Grand Total 97.58 2671.30 1780.87 4452.17 282.18

VIKAS RAJ
PRINCIPAL SECRETARY TO GOVERNMNET(FAC)
//FORWARDED:: BY ORDER//
SECTION OFFICER
Annexure - II to G.O.Rt.No.16, PR&RD(Progs.II)Dept., Dt.10.01.2018

Bridge Works Cleared by MoRD Under PMGSY PHASE XII - Batch II (Year 2017-18)

LSBs Maintena
MoRD State
Sr. Package Road/ Length Total nce Cost
District New District Block Year Batch Road Name Share (in Share (in
No Number Bridge (in Cost (in
Lakhs) Lakhs)
Meters.) Lakhs)
Jayashankar - Mahadev TS02XI 2017 - C/o High level bridge at Km 1/950 on R/F
1 Karimnagar Bridge Batch II 51.16 98.12 124.88 223.00 5.00
Bhupalpally pur 02 2018 T02 PWD Road to Beersagar
Bhadradri Garlabay TS03XIL 2017 - Construction of Bridge on Road from ZP
2 Khammam Bridge Batch II 63.6 73.8 131.2 205.00 6.29
Kothagudem yaram B52 2018 road to Laxmathanda via Sambathanda

Bhadradri TS03XIL 2017 - Construction of Bridge at 250m on Road


3 Khammam Gundala Bridge Batch II 115 112.86 199.14 312.00 7.45
Kothagudem B10 2018 from Modugulagudem to Sajjalabodu
Mahabubaba TS09XIL 2017 - C/o Bridge on R/F Chakru thanda to
4 Warangal Gudur Bridge Batch II 137.22 183.65 235.35 419.00 13.69
d W79 2018 Bancharai thanda
Grand Total 366.98 468.43 690.57 1159.00 32.43

VIKAS RAJ
PRINCIPAL SECRETARY TO GOVERNMNET(FAC)
FORWARDED :: BY ORDER//
SECTION OFFICER

Das könnte Ihnen auch gefallen