Sie sind auf Seite 1von 11

Home Create Account Log in

Understanding Risk vs. Criticality Can Make All the Difference in Rail
Posted by Jason Kasper on Wed, Apr 27, 2016 @ 10:34 AM

Find me on:

Tweet Share 28 Like 0 Share

Healthy assets are the foundation of a healthy business. And how can organization make sure their assets are
healthy? There are two ways an organization can maintain healthy assets. One is much discussed as of late, using
data and the promise of Industrial Internet of Things (IIoT) to create prescriptive analytics to understand the state
of asset infrastructure. The other that's just as important is the regular, physical inspection of critical assets through
operator rounds. Skipping this step will be detrimental to any organization looking to improve Operational
Excellence.

A recent example is DC Metro, the Unites States second busiest transit system. It serves over 700,000 daily riders,
including about 75% of the federal workforce. Comprised of 91 stations in Virginia, Maryland, and the District of
Columbia. Unfortunately, this 40 year old system has deteriorated from years of deferred maintenance, a common
theme among many transit systems in the United States.

The Impact of Failure is Clear

Recently, the entire DC Metro was shut down after a frayed cable caused an electrical fire (see photo). What was
unfortunate is that the warning signs were already there, when a similar incident last year resulted in a fatality.
Image: www.metro-magazine.com, a frayed cable discovered when Metro shutdown the rail system

The incident last year resulted in the NTSB issuing an urgent safety recommendation to inspect all power cables in
order to ensure the connection assemblies met the design specs and were installed correctly. All indications are
this process was not implemented and resulted in another shutdown of the system in its entirety

With the second incident within a year, DC Metro shutdown the entire network to inspect all power cables and
connections. This resulted in uncovering 27 problems that need remediation. It is unfortunate that it took a second
shutdown to put a plan of action in place. There is a better way.

Use a Criticality vs. Risk Approach to Assets

One of the big issues in transits is the huge backlog of deferred maintenance that appears to be insurmountable to
tackle in an efficient and effective way. A potential solution is to understand the criticality and risks each asset
represents to the organizations Operational Excellence goals.

Understanding risk of failure to an asset can help rail organizations prepare for an event, understand how to resolve
an event, and reduce the potential for it to happen in the first place. Assigning criticality to an asset can allow
organizations to understand the failures impact and its relationship to the entire asset infrastructure.
Example: Criticality vs. Risk Matrix

In the case of the DC Metro power cable failures, the risk and criticality would both be ranked high. Therefore, the
planning and inspection of this asset would take priority over other deferred maintenance.

To make an effective Criticality vs. Risk matrix, LNS recommends getting input from key stakeholders including
maintenance, engineering, operations, and materials groups. These teams can help identify what asset failures
would affect the organization the most from completing its goals.

The Physical Data Source, Operator Rounds

As the NTSB recommended during the original incident at DC Metro, inspections are key. This can also help with
tackling the deferred maintenance issue. Once the criticality and risk is associated with assets, operations and
maintenance can then rate what maintenance to do when and understand the associated costs.

Using operator rounds effectively will provide a rich source of data to make decisions, and potentially avoid
unplanned downtime. Often one fault of this type of inspection process it that it is done using paper-based systems
(logbooks, clipboards). In order for it to be the most effective, mobile devices should be used that have easy-to-use
interfacing and integrate back into systems that can use the information to take immediate action if necessary.

Including operators in the detection and elimination of problems is an excellent way to facilitate all reliability efforts as
it makes reliability a joint effort by both operations and maintenance. Most importantly, it makes a tremendous
amount of sense as many basic equipment inspections can greatly benefit from a frequency of once per shift or
more. Combine these with routine process inspections being carried out by operators and maintenance can stay
focused on critical repairs.

This Isn’t the First, Nor the Last

DC Metro is the latest in a continuing flow of commuter rail organizations. It is essentially overwhelmed with years of
deferred maintenance that resulted in a failure, which impacted thousands who expect on time performance.
To tackle the ever mounting deferred maintenance backlog, rail organizations should look to risk vs. criticality
analysis working with the critical groups internally. This helps determine the ratings of assets from all angles to
ensure success. It can then be used to support effective operations and maintenance planning, including operator
rounds that can help round out any real-time data being received and correlate it with physical data from the field.

Access this NEW eBook, "Manufacturing Metrics in an IoT World: Measuring the Progress of the Industrial Internet of
Things," presents results from the fourth iteration of the biennial Metrics that Matter research study conducted
between LNS Research and MESA International. It places particular focus on what IIoT means to manufacturers in
the MOM space.

Tags: Operational Excellence, Risk Management, Asset Performance Management, Maintenance, IIoT

performance management system venkat


5/4/2016 1:53:53 AM

Its useful article to all, thanks for this sharing for us and it's interesting, I got the best information
and best service from your blog, Iam impressed and very glad to wish to all that visit this blog
and sure its very helps

Reply to performance management system venkat

First Name*

Last Name

Email*

Website

Comment*
Subscribe to follow-up comments for this post

Type the text


Privacy & Terms

Subscribe by Email
Email*

Notification Frequency*
Instant

Subscribe

Follow LNS Research

About LNS Research


We are thought leaders and our mission is to drive Industrial Transformation.

About The Blog


The Digital Transformation and Operational Excellence Blog provides an informal environment for analysts to
share thoughts and insights directly with our community on a range of technology and business topics.
Latest Posts
◾ Quality 4.0: Powerful Innovation Enabler

◾ No Lazy Days During Summer for IIoT Solutions Co’s or Industrials [Roundup]

◾ The Missing Link: Connecting Operational Excellence to Strategic Objectives

◾ Arcadis Acquires EHS-IT Services Firm E2 Manage Tech, Market Shift Continues [MondayMusings]

◾ 5 Most Asked Questions from the IIoT Use Case Webcast

◾ What is Quality 4.0?

◾ SAP Leonardo: Live and Kicking! [MondayMusings]

◾ Inforum 2017: A Showing of Progress & Visions [MondayMusings]

◾ 7 Reasons Your EHS Technology Project Won’t Happen

◾ Honeywell User Group 2017: Focusing on the Connected Plant [MondayMusings]

Posts by Category
◾ #MondayMusings (48)

◾ About LNS Research (14)

◾ apm (1)

◾ Architecture (4)

◾ Asset Performance Management (158)

◾ Benchmark Data (10)

◾ Benchmarking Research (7)

◾ Big Data (141)

◾ Business Process Management (3)

◾ Case Study (5)

◾ Closed Loop Quality Management (10)

◾ cloud (84)

◾ Cloud-Computing (52)

◾ Compliance Management (10)

◾ Continuous Improvement (10)

◾ Cost of Quality (19)


◾ Digital Revolution (2)

◾ Digital Transformation (128)

◾ EAM (14)

◾ EHS (71)

◾ Energy Management (14)

◾ Energy Metrics (4)

◾ Enterprise Architecture (12)

◾ Enterprise Quality Management Software (100)

◾ Environment Health and Safety (33)

◾ EQMS (114)

◾ ERP (38)

◾ ESM (8)

◾ Food Safety (4)

◾ HACCP Software (3)

◾ IEM (8)

◾ IIoT (225)

◾ Industrial Automation (7)

◾ Industrial Energy Management (21)

◾ Industrial Energy Management Software (1)

◾ Industrial Internet of Things (2)

◾ Industry 4.0 (2)

◾ Information Technology (10)

◾ Internet of Things (148)

◾ iot (7)

◾ ISO Standards (3)

◾ IT/OT Convergence (2)

◾ Lean Manufacturing (3)

◾ Machine Learning (8)

◾ Maintenance (18)

◾ Maintenance Metrics (4)


◾ Manufacturing (38)

◾ Manufacturing Culture (3)

◾ Manufacturing Execution System (2)

◾ Manufacturing Metrics (30)

◾ Manufacturing Operations (11)

◾ Manufacturing Operations Management (126)

◾ Manufacturing Operations Management Manufacturing (3)

◾ Manufacturing Software (100)

◾ MES (33)

◾ Mobility (45)

◾ MOM (73)

◾ MOM Software (14)

◾ OEE (14)

◾ Operational Excellence (124)

◾ Operational Risk Management (17)

◾ Performance Management (10)

◾ PLM (17)

◾ Predictive Maintenance (29)

◾ Product Lifecycle Management (9)

◾ Product Recall (5)

◾ Product Recalls (2)

◾ Product Traceability (13)

◾ Quality Culture (19)

◾ Quality Management (213)

◾ Quality Management System (15)

◾ Quality Metrics (10)

◾ Quality Risk Management (9)

◾ Quality Software (7)

◾ reliability (7)

◾ Risk Management (42)


◾ Robotics (2)

◾ SaaS (6)

◾ Smart Connected Assets (86)

◾ Smart Factory (1)

◾ Smart Manufacturing (8)

◾ Solution Selection Guide (18)

◾ SPC Software (4)

◾ Statistical Process Control (6)

◾ Supplier Quality Management (26)

◾ Supply Chain Management (18)

◾ Sustainability (57)

◾ Traceability (5)

◾ Vendor Spotlight (40)

◾ wearables (1)

◾ Weekly Roundup (117)

◾ Why You Need to Get Rid of Dead MRO Inventory (2)

Research Library

Basic Access

Quality Management Systems

Manufacturing Operations Management

Global Executive Council

Industrial Energy Management

Performance Management

Solutions
Global Executive Councils

Advisory Services

Strategy Workshops

Benchmarking Services

Custom Research

Technology Selection

Our Expertise

Research Methodology

Research Coverage Area

Research Agenda

Press

Blog

About

Meet the Team

Events

Careers

Our Clients

Contact

Request An Analyst

Request A Topic

Request Partner Information

Terms & Conditions

C
o
n LNS Research 101 Main Street, 14th Floor Cambridge MA 02142
n
© 2011 - 2017 All Rights Reserved
e
c
t
with us

• • • •

Das könnte Ihnen auch gefallen