Site Name/Substation Name 400/230KV SS PGCIL KARAIKUDI


End Client Name PGCIL
Client Name L&T CONSTRUCTIONS

Site visit Reporting Date: 18-12-2017 Site visit Completion Date: -


Job Undertaken
Time
Date In Time Out Time Activities Remarks
18-12-2017 9:00 AM 7:30 PM Discussed with the customerand obtain the
scope of work. Bus-Bar New bays has been
Integrated with the master control unit
19-12-2017 9:00 AM 7:30 PM The new Bays configured file has been
downloaded into the Master control units,
Main -1 & 2
Relay Settings & Configuration file has
been revised.
20-12-2017 9:00 AM 7:30 PM Shut down has been took for Main Bus -1,
Bus-Bar Main-1 Relay has been tested with
the Central unit. Main-2 Relay has been
configured.
21-12-2017 9:00 AM 7:30 PM Secondary relay testing has been completed.
Bus Bar Primary Injection has been done for
both Main-1 and Main-2.
22-12-2017 9:00 AM 7:30 PM
TIE Bay Primary Injection has been done.
Waiting for ABB Approval for SAS work.
23-12-2017 9:00 AM 7:30 PM
Waiting From ABB approval for SAS
Integration to Existing system
24-12-2017
Sunday Off
25-12-2017 9:00 AM 7:30 PM Main-1 & Main-2 Relay DR, SAS signals
has been configured, The same has been
updated to Relays.
GE INDIA Customer Name:

Engineer Name: RAMESH.G Mob No:

Date:12-01-2018 Date: 12-01-2018

Signature Signature
GE INDIA INDUSTRIAL PVT LTD
TIME SHEET

Site Name/Substation Name 400/230KV SS PGCIL KARAIKUDI


End Client Name PGCIL
Client Name L&T CONSTRUCTIONS

Site visit Reporting Date: 29-09-2016 Site visit Completion Date: -


Job Undertaken
Time
Date In Time Out Time Activities Remarks
26-12-2017 9:00 AM 7:30 PM Waiting for The ABB Engineering back-up
for SAS and approval for Main - Tie Relay
Auto re-closer testing
27-12-2017 9:00 AM 7:30 PM
Co-Ordinating with the SAS Engineer.
28-12-2017 9:00 AM 7:30 PM 410 Bay Isolator and Breaker has been
checked with the SAS. Witnessed by the
PGCIL
29-12-2017 9:00 AM 7:30 PM
Co-Ordinating with the SAS Engineer.
30-12-2017 9:00 AM 7:30 PM
Co-Ordinating with the SAS Engineer.
31-12-2017
Weekly Off
01-01-2018 9:00 AM 7:30 PM
Co-Ordinating with the SAS Engineer.
02-01-2018 9:00 AM 7:30 PM
Conference meeting held with PGCIL
regarding bay commissioning. All binary
inputs status witnessed by PGCIL in locally
03-01-2018 9:00 AM 7:30 PM
Coordinate with sas Engineer for Main-2
relay signal Configuration. Main-1 Relay BI
has been witnessed by PGCIL form Sas
GE INDIA Customer Name:

Engineer Name: RAMESH.G Mob No:

Date:12-01-2018 Date: 12-01-2018

Signature Signature
GE INDIA INDUSTRIAL PVT LTD
TIME SHEET

Site Name/Substation Name 400/230KV SS PGCIL KARAIKUDI


End Client Name PGCIL
Client Name L&T CONSTRUCTIONS

Site visit Reporting Date: 29-09-2016 Site visit Completion Date: -


Job Undertaken
Time
Date In Time Out Time Activities Remarks
04-01-2018 9:00 AM 7:30 PM
Main-2 & BCU relay BI has been witnessed
by PGCIL from Sas
05-01-2018 9:00 AM 7:30 PM
Main-1 Relay all protection function except
AR has been witnessed by PGCIL form Sas
06-01-2018 9:00 AM 7:30 PM
Main-2 Relay all protection function except
AR has been witnessed by PGCIL form Sas
07-01-2018
Weekly Off
08-01-2018 9:00 AM 7:30 PM
Worked in DR PC, waiting for witness
09-01-2018 9:00 AM 7:30 PM
AR witnessing with PGCIL check list
10-01-2018 9:00 AM 7:30 PM Waiting for approval from GE for Carrier
scheme wiring modification. Main2 AR has
been witnessed from Sas
11-01-2018 9:00 AM 7:30 PM Waiting for approval from GE for Carrier
scheme wiring modification. Main1 AR has
been witnessed from Sas
12-01-2018 9:00 AM 7:30 PM Carrier scheme wiring modification done.
BCU Metering has been witnessed in
SCADA. Waiting for SLDC Backup from
ABB
GE INDIA Customer Name:

Engineer Name: RAMESH.G Mob No:

Date:12-01-2018 Date: 12-01-2018

Signature Signature

Site Name/Substation Name 400/230KV SS PGCIL KARAIKUDI


End Client Name PGCIL
Client Name L&T CONSTRUCTIONS
GE INDIA INDUSTRIAL PVT LTD
TIME SHEET

Site visit Reporting Date: 29-09-2016 Site visit Completion Date: -


Job Undertaken
Time
Date In Time Out Time Activities Remarks
13-01-2018 9:00 AM 7:30 PM Travel to Chennai
21-01-2018 9:00 AM 7:30 PM Travel to Karaikudi
22-01-2018 9:00 AM 7:30 PM Coordinate with RLDC for signal reporting
23-01-2018 Coordinate with RLDC for signal reporting
24-01-2018 9:00 AM 7:30 PM Coordinate with RLDC for signal reporting
25-01-2018 9:00 AM 7:30 PM Found issues on Gateway, waiting for tech
support
26-01-2018 9:00 AM 7:30 PM Republic Holiday
27-01-2018 9:00 AM 7:30 PM
waiting for tech support for gateway issue
28-01-2018 9:00 AM 7:30 PM Weekly Of
29-01-2018 9:00 AM 7:30 PM waiting for tech support for gateway issue, ABB
engineer not available at site due to health
issue
30-01-2018 9:00 AM 7:30 PM Gateway issues solved, control need to check