Sie sind auf Seite 1von 23

TENDER-58762/AMENDMENT-0/23-Nov-2017 09:44:08 AM

Company Name : MSPGCL


Unit Name : BHUSAWAL THERMAL POWER STATION (BSL-TPS)
Kindly go through the details, In case of any problems/ issues related to the reported data email to
cegenbhusawal@mahagenco.in

TENDER DETAILS
Tender Code 58762
Mode Quantity Contract
Is Over All No
Tender Type Open
Tender Category Type WORKS
Section CHP(EMT)-500 MW
Type Of Bid Two Bid
Material Description Work contract for testing of various types of protection relays installed
at CHP 2x500MW, BTPS, Deepnagar
Estimated Cost [In Rupees] 495000.0
Submission Date Thursday, 7 December, 2017 3:00:00 PM
Tender Validity 180 Days
Delivery Period 180 Days
Tender Fees [In Rupees] 1180.0
EMD [In Rupees] 8500
Contact Email Id cegenbhusawal@mahagenco.in
Commencement Period 0 days from 'First order'
Basis Of Prices Firm Price
Sample Required Not Required
Deviation Yes
BID OPENING DETAILS
Techno-Commercial Bid Will be declared later
Price bid Will be declared later

TENDER DOCUMENTS
Total Number of documents : 8

Page 1 of 23
TENDER-58762/AMENDMENT-0/23-Nov-2017 09:44:08 AM

Rev: 00 Date: 01/01/2009 

Maharashtra State Power Generation Co Ltd 
This Section is applicable to all Power Stations Thermal, Hydro & Gas 
SECTION - I
TENDER WORKS: INSTRUCTION TO TENDERERS 
• Tender form is not transferable 
• The tender documents duly filled‐in and digitally signed, are to be submitted online before due time & date of the submission of tender. 
• Tenderer participating in tender opening, may login at the specified time and date of opening of the tender, if he desires so. 
• The tenderer is requested to quote his lowest rates for the work specified in work schedule as per scope of work.  
• Please upload the documents where requested for conformance. Documents which are uploaded at registration level and are still valid may 
not be uploaded and only reference may be indicated. 
• The work is to be carried out at location as specified in Section III scope of work.  
1. SCOPE OF WORK: 
The scope of work under this tender is as specified in Section / Technical Specifications or any other documents attached with the tender.  
2. REQUIREMENT FROM TENDERERS: 
2.1. The tenderer shall provide satisfactory evidence concerning that:   
a. The tenderer has proven experience of carrying out such work or similar work, which are in operation on the date of submission of the 
tender.  
b. The tenderer does not anticipate change in the ownership during the proposed period of contract. If such a change is anticipated, the 
scope and effect thereof shall be defined. 
c. The tenderer has adequate financial stability and status to meet the financial obligations pursuant to the scope of the contract .The 
tenderer  should  attach  Solvency  Certificate  from  a  Nationalized  Bank  to  the  extent  of  the  value  of  the  contract  at  the  time  of 
submission of the tender.   
d. The tenderer has adequate organizational structure to provide the necessary management services required for successfully carrying 
out such work. 
2.2. The above stated requirements are a minimum and the Purchaser reserves the right to request for any additional information / data and 
also reserve the right to reject the proposal of any tender, if in the opinion of the purchaser, the qualification data is incomplete or the 
tenderer is found not qualified to satisfactory perform the contract. 
2.3. Besides  the  above  requirements,  the  tenderer  shall  also  fulfil  the  Qualifying  Requirements  laid  down  in  the  special  terms  &  conditions 
wherever specified. The tenderers who do not fulfil the above Qualifying Requirements including the qualifying conditions specified in the 
tender documents, the tender shall be summarily rejected.   
2.4. The  tenderer  should  be  a  Registered  Vendor  for  all  Power  Stations.  The  registration  process  is  as  displayed  at  the  site 
http://aps.mahagenco.in. It is the responsibility of the vendor to periodically update the details submitted by him. 
3. PRICE: 
3.1. The lump‐sum price / unit rate prices (as the case may be) quoted by the tenderer in his tender with additions and deletions as may be 
agreed  to  for  the  entire  scope  covered  under  these  specifications  and  documents  to  the  purchaser’s  works  site  shall  be  treated  as  the 
contract price. The tenderer shall quote the price per unit covering entire scope as stated above. 
3.2. The offers with conditional discount on any account viz. payment, quantity etc. shall be rejected. 
3.3. The  tenderer  shall  quote  prices  in  Indian  Rupees  only,  although  the  work  requires  some  imported  components  /  services,  if  any.  The 
tenderer shall arrange to import such material against his import license & Purchaser shall not be responsible for obtaining Import License 
or furnishing essentiality certificate for import of such component of the custom duty payable on such material. The purchaser shall not be 
liable  to  pay  custom  duty  or  variation  thereof  including  the  variation  on  account  of  foreign  exchange  rate.  The  offers  requiring  the 
Purchaser to obtain Import License or to make payment of custom duty or any variation referred to above shall be rejected. 
3.4. The tenderer should quote item wise price in the price bid / price schedule of the tender documents under the various heads indicated 
therein. 
4. QUOTATION: 
Tenderer shall quote price per unit. Any variation in the rates etc. will not be allowed on any ground such as mistake, misunderstanding etc. 
after the date and time of submission of tender.  
5. CLARIFICATION OF TENDER DOCUMENTS: 
5.1. The  tenderer  is  expected  to  examine  all  instructions,  forms,  terms  and  specifications  in  the  tender  documents.  Failure  to  furnish  all 
information required under the tender documents or submission of tender not substantially responsive to the tender documents in every 
respect will be at the risk of the tenderer and may result in rejection of his tender. 
5.2. The tenderer requiring a clarification of the tender documents may notify to the purchaser in writing at the Purchaser’s mailing address 
before 5 days from the date of submission of tender.  
5.3. Purchaser’s  response,  if  any,  including  an  explanation  of  the  enquiry,  but  without  identifying  the  source  of  enquiry  will  be  sent  to  the 
tenderers who have purchased the tender documents. 
6. LOCAL CONDITIONS: 
6.1. It shall be imperative on each tenderer to fully inform himself of all local conditions and all other factors which may have any effect on the 
execution  of  the  contract  covered  under  these  documents  and  specifications.  The  tenderer  shall  also  make  enquiry  and  satisfy  himself 
Page 2 of 23
TENDER-58762/AMENDMENT-0/23-Nov-2017 09:44:08 AM

about  the  contingencies,  risk  and  other  circumstances,  which  may  influence  or  affect  the  execution  of  the  contract  as  specified  in  this 
tender specification. The Purchaser shall not entertain any request for clarification from the tenders regarding such local conditions. 
6.2. It shall be presumed by the Purchaser that all such factors, conditions etc. have been properly investigated and considered by the tenderer 
while submitting his tender. Neither any change in the time schedule of the contract nor any financial adjustments arising thereof shall be 
permitted by the Purchaser which are based on the lack of such clear information or its effect on the cost of the contract to the tenderer. 
7. CONSTITUTION OF TENDERER: 
The tenderer having indicated the details such as nature and constitution of its organization viz. whether Proprietary, Partnership, Public Ltd. or 
Private Ltd. Co., NSIC / SSI registration, permanent Bank Guarantee etc. at the time of vendor registration, renewal / changes therein shall have 
to be uploaded by editing the vendor registration details with due approval of the purchaser before the due date of submission of this tender. 
8. SECURITY DEPOSIT: 
8.1. The Contractor whose tender is accepted will have to intimate the acceptance of the Order and shall be required to pay within Seven days 5 
% of the contract value as Security Deposit in cash of by Demand Draft or if the amount exceeds Rs. 1,00,000/‐ either by Cash/DD or in the 
form of Bank Guarantee from any Nationalized Bank on Stamp Paper of Rs. 100/‐ valid for the period of 18 months from the date of Order. 
Stamp Paper charges to be borne by the Contractor.   
8.2. Contractor will have to pay additional Security Deposit for the Extension order if issued. 
9. EARNEST MONEY DEPOSIT (EMD): 
9.1. The tenderer shall pay the Earnest Money Deposit as set below along with the tender. The tender without the payment of Earnest Money 
Deposit shall be summarily rejected. No interest shall be paid on the Earnest Money Deposit  
9.2. Unless the tenderer is exempted on account of statutory directives as enlisted in clause below, Earnest Money Deposit shall be paid in the 
office of the purchaser in Cash or by Demand Draft and if the amount of EMD is more than Rs. 1,00,000/‐, either in Cash/DD or by way of 
Bank Guarantee from any Nationalized Bank in favour of Purchaser for the requisite amount of EMD. BG format may be downloaded from 
web site. 
9.3. Earnest Money Deposit should be @ 3% (Three Percent) of the estimated value up to       Rs. 1,75,000/‐ and thereafter @ 1% of the balance 
offered value. The maximum Earnest money deposit payable against the tender shall be limited to Rs. 5, 00,000/‐ (Rupees Five Lakhs). 
9.4. Exemption of EMD: Government and semi Government Institutions / Small‐scale industrial unit / NSIC 
a. All    Government  and  semi  Government  Institutions  under  Government  of  Maharashtra  and  Zilla  Parishad  in  Maharashra  and  fully 
owned undertaking of any State Government and Government of India (for the items’ manufactured by such institutions / units). 
b. Small‐scale industrial unit permanently registered with Directorate of Industries, Maharashtra only for the items mentioned in their 
permanent registration certificate. 
c. Small scale industrial unit registered with National Small Industries Corporation (NSIC) and Small Industries Services, Institute of Govt. 
of India, only for the items registered. 
9.5. A  reference  to  the  tender  number  should  be  given  in  case  the  EMD  is  paid  in  cash  before  the  due  date  of  the  tender  and  the  relevant 
deposit amount should be mentioned in the tender.  
9.6. The Tenderer may avail the scheme of lump‐sum deposit of Rs. 3 Lakhs (Three Lakhs only) for each power station of MAHAGENCO which 
will be treated as Permanent Deposit and shall be applicable for EMD & SD exemption. It will be valid for one year. This permanent deposit 
will  be  acceptable  only  in  cash  or  by  Demand  Draft  drawn  on  any  Nationalized/Scheduled  Bank  in  favour  of  MAHAGENCO.  In  case  of 
permanent deposit, the Tenderer should enclose certificate issued by MAHAGENCO with every tender. 
9.7. The tenderer registered with N.S.I.C. and those who have attached N.S.I.C. Registration certificate at the time of vendor registration shall 
avail benefits mentioned above only to those items approved during the Registration process & subsequent updates in registration up to 
the date of submission of this tender. 
9.8. Earnest Money Deposit shall stand forfeited In the event if: 
a. Tender is withdrawn after opening of the technical bid 
b. Tender is withdrawn during validity period 
c. Tender is withdrawn before the Tenderer receives formal intimation of decision taken in this regard to this tender 
d. Tenderer fails to pay Security Deposit against this order. 
e. Tenderer fails to execute the Stamp Agreement after receipt of Order 
f. Tenderer fails to accept L.O.I. (Letter of Intent) 
9.9. In such events Purchaser shall be entitled to recover the amount of EMD paid or enchasing the Bank guarantee or by resorting any other 
remedy available under the law. 
9.10. The  successful  tenderer upon  award  of  the  contract  fails  to  pay  the security  deposit  of  the  order  /  contract  then  the  Purchaser  without 
prejudice to the right of the Purchaser to recover damages, if any.  
10. EARNEST MONEY OF UNSUCCESSFUL TENDERER: 
10.1. Earnest  money  deposited  shall  be  returned  to  the  unsuccessful  tenderer  as  soon  as  possible  after  the  tender  has  been  decided  and  on 
submission of receipt of EMD payment to the office of the purchaser.  
10.2. Tenderers are requested to submit their applications for refund of E.M.D. / S.D. within three years from the date of Payment; otherwise, it 
will be treated as forfeited 
11. SIGNING OF THE TENDER DOCUMENTS: 
11.1. Offer shall be submitted along with the tender documents and duly filled in with all sections  / Appendices / Schedules etc.  
11.2. The offer shall be signed with valid Digital signature. 
12. TIMELY SUBMISSION OF OFFER: 
12.1. The tender is to be submitted online on or before due date & time of submission to the purchaser at website http://aps.mahagenco.in  .  
12.2. Page 3 of 23
It is advisable to submit the digitally signed offer sufficiently in advance of due date & time so as avoid last minute trafficking at server. 
TENDER-58762/AMENDMENT-0/23-Nov-2017 09:44:08 AM

12.3. Offer received after the due date and time of submission shall not be accepted. 
12.4. In case, the due date of opening of tender happens to be holiday, the offer shall be opened on the next working day at the same time. 
13. SUBMISSION / SUPER SCRIBING OF THE TENDER DOCUMENTS: 
The offer is to be submitted as follows:   
13.1. Techno Commercial Bid (Part I): This part shall contain all Technical and Commercial aspects of the Bid and documents supporting the same 
except the price bid.  
13.2. Price Bid (Part II): This part shall contain only the Price Bid; strictly in the prescribed format i.e. Annexure ‐ 'B'. 
13.3. Physical submission of documents (PART III) if applicable: Envelope for this part shall contain documents like type test reports, drawings, 
bill of material, catalogues etc. demanded in tender in physical form (hard copy) & is to be submitted to Purchaser if it is not practicable to 
upload the documents online due to size.  
13.4. Method of submission of part III and their opening: This envelope shall be individually sealed and shall be super scribed with the name and 
address of tenderer and the following information before posting or delivering the same: 
a. Tender No. 
b. Due date and time of submission 
c. Due date and time of opening 
13.5. Envelope as above shall be opened on the scheduled date of opening of Techno‐commercial Bid (Part‐ I).  
13.6. In respect of tenderer whose techno‐commercial bid is acceptable, their Price Bid shall be scheduled for online opening. 
14. QUANTITIES OFFERED: 
The quantity offered should be filled in prescribed Column of Price Bid, failing which offer will be treated as ‘No Offer’ and rejected. 
15. INFORMATION REQUIRED WITH TENDER: 
15.1. The tenderer shall clearly indicate his organizational structure such as machinery, manpower, financial position etc. available for execution 
of contract. He shall also indicate the name of the subcontractor, if intended, along with the full details of the sub‐contractors. 
Such information should be furnished in separate sheet to be attached to the offer. 
15.2. The tenderer shall upload the relevant documents in order to fulfil Qualifying Requirements. 
15.3. In case of any deviation as regards the specification, the tenderer shall clearly indicate in separate sheet of technical / commercial deviation 
schedule.   
15.4. The tenderer shall give the full address along with Telephone No. FAX, E‐mail etc. for the purpose of correspondence. The letters / Notices 
served or left upon said address shall be deemed to have been served upon the tenderer or contractor. The tenderer shall immediately 
communicate the change in address, Telephone, Fax, E‐mail etc., if any. Failure to intimate such change, any letter or notice served upon 
original address of the tenderer shall be deemed to be received by the tenderer / contractor. 
15.5. Verbal  statement  or  information  furnished  by  the  tenderer  as  regards  the  quality,  quantity,  arrangement  of  work  or  any  other  matter 
connected to the tender shall not be considered. 
16. WORK COMPLETION PERIOD: 
16.1. Tenderer is requested to quote work completion period clearly as per schedule in the format specified in tender documents offers.  Work 
completion period which directly or indirectly affects the Conditions of Tender & Work shall be liable for rejection. 
16.2. Offer shall not be accepted if the work completion period is not indicated. 
17. FILLING IN OF PRICE SCHEDULE: 
Tenderer is requested to ensure that the comments against each and every item / clause of price schedule / Section shall be clearly filled in and 
answered. Any item / clause shall not be left blank or unanswered. If any item / clause are not applicable, the words “Not Applicable” shall be 
written against it. 
18. MANDATORY REQUIREMENT OF SUBMISSION OF OFFER: 
The offer shall be submitted online duly filled in, attaching all the required documents, completed in all respects and should be 
digitally signed.  
19. LANGUAGE OF THE TENDER: 
The tender filled in by the tenderer and all correspondence & documents relating to the tender exchanged between the tenderer and Purchaser 
shall be written in English language. Any document furnished along with the tender in a local vernacular language shall be accompanied with the 
English translation. 
20. AMENDMENT OF THE TENDER: 
At  any  time  prior  to  the  date  of  opening  of  the  tender,  the  purchaser  may  for  any  reason,  whether  at  its  own  initiative  or  in  response  to  a 
clarification required by the tenderer, modify the tender documents by an amendment which will be notified by e‐mail to all the prospective 
tenderers who have received the tender documents and will be binding on them. Purchaser may at its discretion extend the date of opening of 
the tender.  
21. DISREGARD OF TENDER CONDITIONS: 
21.1. The Purchaser reserves the right to reject any tender, which does not conform to any of the conditions / instructions etc. 
21.2. Tender containing any deviations / additions / alterations / changes in the conditions of tender as stated in section‐I/II/III /price schedule 
shall not be acceptable.  
21.3. The tenderer having digitally signed all the tender documents indicates any deviations / additions / alterations / changes in the covering 
letter, unrelated annexure, schedules of the offer or elsewhere, the same shall be ignored and the offer shall be treated as meeting with all 
specified tender conditions. 
22. EXAMINATION OF TENDERS:  Page 4 of 23
TENDER-58762/AMENDMENT-0/23-Nov-2017 09:44:08 AM

22.1. The tenderer shall furnish all the data, drawings and other information / documents as per schedules attached to this specification, duly 
signed with the seal of the company, as a token of acceptance.  
22.2. The  purchaser  reserves  the  right  to  reject  any  offer  for  lack  of  any  data  as  called  for  in  the  schedules  and  particularly  in  the  technical 
details.  
22.3. After the opening, the purchaser shall examine the tenders to determine whether they are complete, whether required confirmations have 
been furnished, whether the documents have been properly signed and whether the tenders are generally in order, whether the essential / 
special terms and conditions are agreed. 
23. POLICY FOR TENDERS UNDER CONSIDERATION:  
23.1. The tenders shall be deemed to be under consideration immediately after they are opened and until such time the official intimation of 
award / rejection is made by the purchaser to the tenderers.  
23.2. While the tenders are under consideration, the tenderers and / or their representatives or other interested parties are advised to refrain 
from  contacting  by  any  means,  the  purchaser  and  /  or  his  employees  /  representatives  on  matters  related  to  the  tender  under 
consideration. The purchaser, if necessary, shall obtain clarifications on the tender by requesting for such information from any or all the 
tenderers in writing by e_mail, as may be necessary.  
23.3. All unsolicited correspondence, discussions etc. by the tenderer after opening of the price bid shall be treated as post tender development 
/ information and shall not be considered for tender evaluation purpose. 
24. ACCEPTANCE OF TENDER: 
24.1. The Purchaser does not bind itself to accept the lowest or any tender neither will any reasons be assigned for the rejection of any tender or 
part of tender. It is also not binding on the Purchaser to disclose any analysis report on tender / samples. The tenderer on the other hand 
binds himself to carry out work on any item or items selected from his offer in part or whole at the option of the Purchaser. 
24.2. The Purchaser shall reserve the right to place an order for any quantity in excess to the extent of 50% or any less quantity, of the quantities 
offered by the tenderer. 
25. AMBIGUITY IN QUOTATION OR DEVIATIONS: 
The tenderer shall ensure that  he should quote the tender in clear terms and only fill in  the blanks wherever required. Any ambiguity in the 
terms and conditions may lead the rejection of tender. The tenderer should note that there shall be no deviation in respect of the following 
terms specified in tender documents and the deviation if any; the tender shall be liable for rejection. 
a. Payment of Earnest Money Deposit 
b. Payment of Security Deposit 
c. Terms of Payment 
d. Guarantee 
e. Period of validity of offer 
f. Jurisdiction of Court 
g. Default of contractor & termination thereof 
h. Non‐compliance of special Condition specified  
26. WITHDRAWAL OF INVITATION OF TENDER: 
The  Purchaser  reserves  its  right  to  withdraw  the  invitation  of  tender  at  any  time  before  its  acceptance  is  communicated  to  the  successful 
tenderers. 
27. NAME OF AGENT / REPRESENTATIVE: 
27.1. The digital certificate has been issued to the persons authorized by the firm during vendor registration process .While submitting the bids 
online only valid digital certificate issued to the firm can be used. In case, the digital certificate is compromised or the person holding the 
digital certificate is no longer authorized to digitally sign the tender, it is the responsibility of the tenderer to revoke this certificate and 
obtain the fresh certificate. The tenderer is responsible for all the contractual liabilities & responsibilities thereof. 
27.2. In case the tenderer authorises the agent or the representative to deal on behalf of the tenderer the name and address of such person 
should be informed to the purchaser. The tenderer shall submit the Power of Attorney in favour of agents / representative duly executed 
before the Notary.  In. the absence of the power of attorney, the Purchaser shall not deal with the agent / representative. 
28. NOTIFICATION OF AWARD OF CONTRACT: 
The  notification  of  Award  of  contract  will  be  communicated  to  the  successful  tenderer  by  Letter  of  Award  (LOA)  by  registered  post  or  hand 
delivery or Fax or e_mail as the Purchaser deems it fit which shall be followed by letter of confirmation by registered post. It shall be noted that 
the contract shall be concluded on notification of award of contract. 
29. VALIDITY OF THE TENDER: 
The tenderer will keep the offer valid for acceptance up to and including last date of calendar month, covering the date of completion of 120 
days (one hundred twenty days) from the date of opening of the tender and shall also agree to extend the period of validity required by the 
Purchaser. The tenderer shall not be allowed to modify or change the conditions of the tender while extending the period of validity. 
30. PROCEDURE FOR SUBMISSION OF TENDER  
30.1. The tenderer shall note that all Sections / price schedule etc. to be submitted along with the tender duly signed by digital signature. 
30.2. Failure to follow this procedure shall render the tender incomplete and shall be liable for rejection. 
30.3. The offer of the tenderer shall be submitted in the form of covering letter prescribed in Annexure. 
 
These instructions of tender shall form part of the contract 
3Please, consider your environmental responsibility. Before printing this document ask yourself: "Do I really need a hard copy?" 
Page 5 of 23
TENDER-58762/AMENDMENT-0/23-Nov-2017 09:44:08 AM
 

Rev: 00, Date: 01/01/2009   

Maharashtra State Power Generation Co Ltd 
This Section is applicable to all Power Stations Thermal, Hydro & Gas 
SECTION – II
TENDER WORKS: GENERAL REQUIREMENTS, TERMS & CONDITIONS 
 
1. DEFINITION OF TERMS:  
In  constituting  these  general  conditions  and  the  annexed  specifications,  the  following  words  shall  have  the  meanings  herein 
assigned to them unless there is something in the subject or context inconsistent with such construction. 
1.1. The Purchaser shall mean Maharashtra State Power Generation Co. Ltd., Purchasing Power Station. 
1.2. The Supplier / Contractor shall mean the tenderer whose tender has been accepted by the Purchaser for award of contract 
and shall include such tenderer’s legal representatives, successors and permitted assigns. 
1.3. Sub‐Contractor shall mean the person other than the contractor named in the contract for any part of the work or any reason 
to  whom  any  part  of  the  contract  has  been  sublet  by  the  contractor  with  the  consent  in  writing  of  the  Engineer  and  shall 
include the legal representatives, successors and permitted assigns of such person. 
1.4. Contract Operating Authority (COA) / Engineer shall mean the officer appointed & duly authorized by the Purchaser to act for 
the purposes of the contract by Power Station Head. 
1.5. Plant Equipment shall mean and include any plant, equipment, stores, and materials under the contract. 
1.6. The Site shall mean the whole of the premises, buildings, and grounds in or upon which the plant, work or works is / are to be 
provided, executed, erected, done or carried out. 
1.7. The  Contract  shall  mean  the  letter  of  Intent  /  Award,  Letter  of  Acceptance  of  Tender  and  shall  include  the  conditions  of 
contract, specifications, schedules, tender, Guarantee , drawings and any further conditions which may be specifically agreed 
to between the parties as forming a part of the contract. 
1.8. The  Specifications  shall  mean  the  specifications  appended  to  these  general  conditions  and  the  schedules  and  annexure 
thereto, if any. 
1.9. Manufacturer’s works or Contractor’s works shall mean the place of work used by the manufacturer, the contractor, or sub‐
contractors for the performance of the works. 
1.10. Notice of Award to Contract / Letter of Award shall mean the official notice  /  letters issued by the Purchaser notifying  the 
contractor that his tender has been accepted. 
1.11. Contract  Price  shall  mean  the  sum  named  in  the  contract  agreement  subject  to  such  additions  thereto  or  deductions  there 
from as may be made under the provisions hereinafter contained. 
1.12. Contractors  supervisory  /  work  Personnel  shall  mean  the  supervisory  /  work  personnel  deputed  by  the  contractor  for 
executing the contract or under whose supervision the work is being carried out. 
1.13. Guarantee  shall  mean  as  prescribed  in  the  contract  and  as  instructed  by  the  Engineer  to  be  performed  by  the  contractor 
before the works are finally accepted by the Purchaser ready for commercial use up to the satisfaction of the Engineer. 
1.14. Commissioning shall mean the first successful operation of the equipment after all the adjustments, trials etc., cleaning, and 
re‐assembly required at site, if any, have been completed and the equipment is made ready for commercial use. 
1.15. Guarantee  Period  shall  mean  the  period  during  which  the  contractor  shall  remain  liable  for  repair  /  replacement  of  any 
defective part of the works performed under the contract. 
1.16. Month shall mean the Gregorian calendar month. 
1.17. Day or Days unless herein otherwise expressly defined shall mean calendar day or day of 24 hours each. 
1.18. Writing shall include any manuscript, under or over signature and / or seal as the case may be. 
2. INTERPRETATION: 
2.1. Words importing the singular only shall also include the plural and vice versa, where the context is required. 
2.2. Words  importing  ‘Person’  shall  include  firms,  companies,  corporations  and  associations  or  bodies  of  individuals,  whether 
incorporated or not.  
2.3. The interpretation of the Purchaser on any matter, decision given by him on any dispute points will be final and binding on the 
Contractor 
3. EFFECT OF CONTRACT:  
The contract shall be considered as having come in to force from the date of Notification of Award. The tenderer whose offer is 
accepted is hereinafter called “the supplier / Contractor”. 
4. SCOPE OF CONTRACT: 
The scope of contract shall be as specified in Annexure / Technical Specifications. 
5. CONTRACT DOCUMENT:  
The  term  contract  document  shall  mean  and  include  the  following,  which  shall  be  deemed  to  form  an  integral  part  of  the 
contract. 
5.1. Tender specification of the Purchaser, covering the scope of work, instructions to tenderers, general terms and conditions of 
contract, special terms and condition if any, technical specification, annexure, schedules etc. 
5.2. Contractor’s tender proposal including the letters of clarifications thereto between the contractor and the Purchaser prior to 
the award of contract 

Page 6 of 23
 
TENDER-58762/AMENDMENT-0/23-Nov-2017 09:44:08 AM
 

5.3. All the data and information of any sort given by the contractor along with his tender, subject to the approval of the Purchaser 
/ Engineer 
5.4. Any mutually agreed variation to the conditions of the documents and specifications and terms and conditions of contract, if 
any in writing. 
6. ASSIGNMENT AND SUBLETTING OF CONTRACT: 
6.1. The contractor shall not assign the contract or any part thereof or any benefit or interest therein or there under without the 
prior written consent of the Purchaser. 
6.2. The contractor shall not sublet any part of the works without prior written consent of the Purchaser. 
6.3. Such  consent,  if  given,  shall  not  relieve  the  contractor  from  any  liability  or  obligation  under  the  contract  and  he  shall  be 
responsible for the acts, defaults, and neglects of any of his sub‐contractor, his agents, servants or workman as fully as if they 
were the acts, defaults, neglect of the contractor, his agents, servants or workman. 
6.4. The Purchaser shall have the right to obtain from the contractor any agreement in writing entered into by the contractor with 
any of his sub contractors for services in respect of the works included in the contract, provided that the contractor shall not 
be bound to disclose the sub contract value. The contractor shall supply the Engineer with full technical and commercial details 
of orders placed on his sub contractors. 
7. CONTRACTOR TO INFORM HIMSELF FULLY: 
7.1. The contractor shall be deemed to have satisfied himself as to all the conditions and circumstances affecting the contract price 
and as to the possibility of executing the work as shown and described in the contract. The contractor shall be deemed to have 
examined the availability of all inputs, transport facilities etc. and to have fixed his price taking into account all such relevant 
conditions and also the risk, contingencies and other circumstances, which may influence or affect the work as specified in the 
contract. 
7.2. The  contractor  shall  be  responsible  for  any  misunderstanding  or  incorrect  information,  however  obtained,  on  which  the 
contract price has been based except the written information furnished by the Purchaser. 
8. SECURITY DEPOSIT: 
8.1. The  contractor  will  have  to  deposit  5  %  of  the  contract  value  within  seven  days  from  the  date  of  LOA  /  order  as  Security 
Deposit  unless  having  deposited  Permanent  Deposit  of  Rs.  Three  Lakhs  with  the  Purchaser  at  each  Power  Station  before 
starting the work. 
8.2. The  failure  to  make  payment  of  security  deposit  within  7  days  from  the  date  of  receipt  of  order  as  above  will  be  viewed 
seriously and the contract awarded shall be liable to be terminated at the risk and cost of the Contractor and the Contractor 
shall be responsible for the consequences arising out of such termination. 
8.3. The Security Deposit shall be paid in favour of Purchaser by way of: 
a. Cash or 
b. Demand draft on any Nationalized / Scheduled Bank in favour of Purchaser or 
c. When  the  amount  exceeds  Rs.  1,00,000/‐,  the  same  can  be  paid  either  by  cash/Demand  Draft  or  in  the  form  of  Bank 
Guarantee from any nationalized Bank in favour of MAHAGENCO which shall be valid for the guarantee period as given in 
Guarantee Clause of the conditions of Tender and works in the standard form of the purchaser or 
8.4. This Security Deposit in cash or in the form of Bank Guarantee or otherwise is for the due performance of the work and the 
same shall be liable to apportion towards amount due or becoming due by the contractor on his failure to execute this order or 
any other contract and in the event of non fulfilment of the terms and conditions of the contract 
8.5. The Security Deposit shall be refunded on the expiry of the Guarantee period specified in condition Guarantee stated herein.  
9. PERFORMANCE DEPOSIT / BANK GUARANTEE: 
9.1. The contract performance deposit shall be of an amount equal to 10 % of the contract value and shall be paid by all the types 
of contractors. The Security Deposit paid by the contractor shall be refunded on furnishing the contract performance deposit 
within 30 days. The contract performance deposit can be furnished in either of the forms prescribed for Security Deposit. 
9.2. The  contract  performance  deposit  shall  be  refunded  within  90  days  from  the  date  of  expiry  of  the  Guarantee  period.  The 
Purchaser shall not be liable to pay any interest or compensation to the contractor for retaining the deposit after the end of 
the said period. 
9.3. The  contract  performance  deposit  is  intended  to  secure  the  performance  of  the  contract  for  Guarantee  period  of  the  work 
carried out. However, it is not to be construed as limiting the damages stipulated in other clauses of the contract. 
10. WORK COMPLETION PERIOD:  
The  work  completion  period  as  stipulated  in  the  contract  for  the  work  shall  be  deemed  to  be  the  essence  of  the  contract.  The 
contractor shall so organize his resources as to complete the work within the stipulated period. 
11. FORCE MAJEURE CLAUSE: 
11.1. Force  majeure  clause:  The  stipulated  work  completion  period  is  subject  to  force  majeure  condition  like  War,  Earthquake, 
Natural  Calamities,  War  like  conditions,  Strikes  (affecting  the  transportation,  loading,  unloading)  any  of  the  unforeseen 
regulations by the Central  / State Govt. condition absolutely beyond the control of the Contractor, for which the Contractor 
shall produce documentary evidence to the satisfaction of the authority 
11.2. Performance of Contract: The  Purchaser will  not  be in any way liable for non‐performance either in  whole or in  part  of  any 
contract  or  for  any  delay  in  performance  thereof  in  consequence  of  Strikes,  Shortages,  Non‐Availability  Of  Raw  Materials, 
combination  of  Labour  Or  Workman  Or  Lockout,  Break  Down  Or  Accident  To  Machinery  Or  Accidents  of  whatever  nature, 
failure on the part of the Railways to supply sufficient wagons to carry essential raw material etc. and finished products from 
the Stores, subject to the provision and stipulation made in the Clause of ‘Liquidated damages 

Page 7 of 23
 
TENDER-58762/AMENDMENT-0/23-Nov-2017 09:44:08 AM
 

12. TERMS OF PAYMENT: 
12.1. Full payment will be released as per actual work done within 45 days after satisfactory completion of the work in all respect as 
per actual and submission of bill against recording of bill in Measurement Book / monthly Running Account basis 
12.2. The payment shall be released through RTGS (Real Time Gross System) / NEFT (National Electronic Fund Transfer). To facilitate 
this Contractor will have to furnish Name of the Bank & Branch, Bank Account No. 15 digits, IFSC code 11 digit 
12.3. Following  documents  as  required  in  terms  of  order  will  have  to  be  forwarded  to  Purchaser  along  with  bills  to  facilitate 
payment. 
a. Bill / Tax Invoice in triplicate on basis of rates accepted. 
b. Certificate of Satisfactory Work completion within stipulated period jointly prepared with Contract Operating Authority 
13. TAXES AND DUTIES: 
Service  Tax  if  applicable  for  this  work  contract  will  be  paid  extra.  The  contractor  shall  inform  the  ST  Registration  number  in  this 
respect. 
14. DEDUCTION:  
Any amount or amounts which become payable by the contractor to the Purchaser under a particular contract, shall be deducted by 
the Purchaser from any amount / amounts due or becoming due to the contractor under the same or any other contract and shall 
be adjusted against dues to the Purchaser. 
15. GUARANTEE:  
Work completed shall be guaranteed for a period as specified from the date of completion of work / commissioning. Any  defect 
noticed during the Guarantee period as specified, from the date of completion of work due to poor workmanship will have to be 
attended by the contractor at his own cost and risk. 
16. TERMINATION OF CONTRACT:  
The Company reserves the right to cancel the Work Order in part or full if the work quality, progress is found to be unsatisfactory. In 
such case the unexecuted work will be got completed through some another agency/ departmentally. For this extra expenditure if 
any incurred will be recovered along with 15 % supervision charges from any of the contractor’s dues with MAHAGENCO. Decision 
of the Company Authority will be final and binding on the contractor. 
17. INCOME TAX DEDUCTION:  
Income tax as per applicable ruling u/s. 194C of the Income Tax Act, 1961 along with surcharge & cess as applicable will be deducted 
from your gross bill while releasing payments.  
18. RESPONSIBILITIES OF CONTRACTORS:  
18.1. Rules & Regulations: Your staff will be governed by relevant Rules, Regulations and Acts of State / central / Govt. in force, such 
as Workmen compensation Act, Minimum wages Act, Factory Act, Provident Fund Act, Labour Act etc 
18.2. PF  registration:  Contractor  will  have  Provident  Fund  Registration  number  and  submit  group  insurance  for  manpower  to  be 
engaged. 
18.3. Compensation: The Contractor will be responsible for the payment of compensation of his labours, in case of accident as may 
be admissible under the Workmen’s Compensation Act‐1923. If he fails to pay the same, it will be recovered from any amount, 
which becomes due for payment to him by the MAHAGENCO and will be paid to concerned labour or dependent / heirs etc. as 
required under the Rules and Regulations. The Contractor shall indemnify the MAHAGENCO for all claims for injury caused to 
any  person  whether  workmen  or  not,  while  in  or  upon  the  works  on  the  site  and  the  MAHAGENCO  shall  not  be  bound  to 
depend any claims brought under the Workmen’s Compensation Act & the Contractor shall be liable for any such claims. 
18.4. Electrical License: Contractor should have valid Electrical License to carry out electrical works and works should be carried out 
as per Indian Electricity Rule. 
18.5. Safety regulation: The contractor will have to follow safety regulation strictly and ensure precautions against any fire hazards 
while  working.  Contractors  authorized  representative  shall  have  to  be  present  at  works  place  to  ensure  safe  working 
environment. Contractor should provide safety equipments to the staff engaged for this contract.  
18.6. Company's property: Proper care should be taken while working so that there will be no damage to the Company's property. 
Any loss on the account will be recovered from any of your dues with the Company 
18.7. Discipline: It is the responsibility of the Contractor to maintain discipline of his staff. Any hindrance to the running of Power 
Station or MAHAGENCO’s staff by the Contractor or his staff will be viewed seriously and may lead in termination of contract 
by the MAHAGENCO without entertaining any claim from the Contractor in this regard.   
18.8. Work Hours: Power Station is continuously run factory where 24 hours working is essential. Contractor may have to arrange 
work round the clock / any odd hours.  
18.9. Manpower:  Labours  required  for  the  work  shall  be  arranged  by  the  Contractor  him‐self.  Labour  so  engaged  by  him  will  be 
bound by Rules and Regulations of the MAHAGENCO and the Factory Act‐1948. If the workers / staff is found not suitable / 
incompetent, the Contractor shall remove them from the job as demanded by the Contract Operating Authority with suitable 
substitute. 
18.10. Non‐Execution  of  Work:    The  Contractor  will  be  responsible  to  make  the  loss  and  also  expenditure  incurred  by  the 
MAHAGENCO  due  to  non‐execution  of  work.  All  such  amounts  will  be  recovered  from  any  amount,  which  becomes  due  for 
payment to him by the MAHAGENCO and may result in the termination of contract. 
18.1. Idle Labour: No compensation claim of idle labour for any reason will be entertained by the Company. 
18.2. Medical: You will have to submit medical fitness certificate of your employees / labours before starting of work. 
18.3. Attendance: You or your representative should be present at works site to receive the instructions / directions regarding the 
work. 
Page 8 of 23
 
TENDER-58762/AMENDMENT-0/23-Nov-2017 09:44:08 AM
 

18.4. Gate Pass: Contractor will have to prepare identification photo passes as per procedure laid down by Security section for all 
the employees entering in the power plant premises. Any change in manpower should be immediately intimated to Contract 
Operating Authority and Security Officer. 
18.5. Housing accommodation will not be provided by MAHAGENCO to the contractor or his workmen 
18.6. T & P : The Company will not provide T & P except special T & P 
19. AGREEMENT 
The Contractor will have to execute an agreement on Court Stamped Paper of Rs. 100/‐ before the work. The cost of this is to be 
borne by him. Form enclosed with tender document. 
20. PENALTY FOR LATE WORK:  
The work will have to be started immediately as & when asked by MAHAGENCO authority to complete it within the stipulated time 
If  works  are  suffered,  delayed  then  penalty  @  1  %  per  day  subject  to  maximum  10  %  of  contract  value  will  be  recovered  from 
contractor’s bill/s. 
21. EXTENSION OF CONTRACT:  
The Purchaser reserves the right to extend the contract at his discretion, so that the work done by the Contractor does not exceed 
50% of the value of the tender awarded to him and the Contractor is bound to carry out this work at the same rates and the terms 
and conditions. Rates Offered shall be firm during entire contract period, also for the extended period / Quantity, in case extension 
is given if any.  
22. SCAFFOLDING: 
The contractor should arrange the scaffolding, if necessary to complete the work. However the scaffolding material will be provided 
on the returnable basis subject to the availability. 
23. MISCELLANEOUS WORK:  
Any other miscellaneous work which is related to this work and not covered in the scope of work / schedule and becomes necessary 
to be carried out to complete the work, should be carried by you for which no extra payment will be made. 
24. TRANSPORTATION:  
Contractor will have to carry out at his cost and risk the transportation of material / spares from the place of issue to the site of 
work and balance material / scrap generated during the work shall be shifted back to the designated place as per the directives of 
Contract Operating Authority. 
25. ELECTRICITY AND OTHER CHARGES:  
Electricity required for above work will be provided by MAHAGENCO at free of cost but at one point only. The contractor will have 
to arrange for any further extension if required including bulb wires, cables etc. at his own cost and risk. 
26. SPARES & COMMON CONSUMABLES:  
26.1. Common  consumables  including  general  purpose  welding  electrodes,  cut  rods,  oxy‐acetylene  gas  etc.  will  be  issued  by 
MAHAGENCO on chargeable basis as per actual rates.  
26.2. Spares:  Spares  required  for  replacement  purpose  will  be  issued  by  MAHAGENCO  at  free  of  cost.  You  will  have  to  use  them 
carefully and submit material account of spares issued / used along with the bill. 
27. DISCOUNT:  
Discount, if any, is to be clearly indicated in the price bid. Conditional discounts will not be accepted. 
28. INFLUENCE:  
Any efforts by  the Tenderers to influence the owner during evaluation process before order placement will be rejected. Similarly 
deviation in the term of payments, penalty, security deposit, delivery period will be treated as non‐responsive quotation / offer and 
will not be considered for evaluation /order placement. 
29. BANK CHARGES:  
Your Bank charges at your account and our charges at our account. Purchasers Bankers are as specified in custom document. The 
request of the agency regarding assurance about payment to any Bank shall not be entertained in any condition which may please 
be noted. The payment shall be effected to the firm only 
30. TENDER REFERENCE:  
For any correspondence, reference of our tender should be invariably indicated. 
31. ENVIRONMENTAL MANAGEMENT SYSTEM (EMS):  
You and your employee shall follow the current practices / procedure as per Environmental Management System ISO 14001‐2004 
and shall fulfil the environmental norms / requirements specified / latest notifications issued by the MPCM and CPCB 
32. JURISDICTION OF CONTRACT:  
Any  disputes,  difference  arising  under,  out  of  or  in  connection  with  this  tender,  or  contract  if  concluded,  shall  be  subject  to  the 
exclusive jurisdiction of the nearest Courts of purchaser. 

Please, consider your environmental responsibility. Before printing this document ask yourself: "Do I really need a hard copy?" 

Page 9 of 23
 
TENDER-58762/AMENDMENT-0/23-Nov-2017 09:44:08 AM
Work contract for testing of various types of protection relays installed at
CHP 2x500MW, BTPS, Deepnagar

SECTION III - Qualifying Requirements


Technical conditions:
(1) The bidder should have experience of similar work in State/Central Generating Company/PSU.
(Similar work means: “Testing of protection relays”).

(2) Experience of having successfully completed similar works in State/Central Generating


Company/PSU during last 7 years ending last day of month previous to the one in which applications
are invited should be either of the following.

a) Three similar completed works costing not less than the amount equal to 40% of the estimated cost.
OR
b) Two similar completed works costing not less than the amount equal to 50% of the estimated cost.
OR
c) One similar completed works costing not less than the amount equal to 80% of the estimated cost.

(3) The bidder shall furnish the copy of performance certificate along with corresponding work order
copy issued by state/ central generating company/PSU which is attached for fulfilling technical
condition no. (2).

(4) The value of any work will be considered excluding duties & taxes while evaluating the bids

Financial conditions:
(5) Average annual financial turnover during the last 3 years, ending 31st March of the previous
financial year, should be at least 30% of the estimated cost of this tender.

(6) Solvency Certificate : The bidder should submit latest & valid solvency certificate to the extent he
is solvent from the Collector of the District / Tahasildar within which he resides or certificate from
Nationalized / Scheduled Bank (for the minimum 50% amount of the total estimated cost of the work).
If the tender is submitted in the name of registered Co-Operative Society then the solvency certificate
from the Co-Op. bank in the name of the Society will be accepted.

(7) The bidder should submit:


a) Registration certificate of the firm.
b) PAN certificate.
c) P.F. Registration certificate.
d) GST Registration number.
e) Labour License. (If applicable)
f) Electrical Work License

Note: The bidder should upload scanned original copies of all required documents; otherwise the offer
will be liable for rejection.

Chief Engineer (O&M)


BTPS, Deepnagar

Page 10 of 23
Mahar ashtr a State Power 09:44:08
TENDER-58762/AMENDMENT-0/23-Nov-2017 Gener
AM ation Co Ltd

Work contract for testing of various types of protection relays installed at


CHP 2x500MW, BTPS, Deepnagar
SECTION – IV
TENDER WORKS: SPECIAL, GENERAL REQUIREMENTS, TERMS & CONDITIONS
Sr.
Item Code Tech. Specification
No.
RELAY<>GENERATOR AND TRANSFORMER
1 054-07-001-001-0002 PROTECTION<>NUMERICAL<>MAKE: AREVA /
ABB<>TESTING OF MICOM SERIES PROTECTION RELAYS

SCOPE OF WORK
Testing of various types of protection relays installed at CHP 2x500MW, BTPS, The details of relays
are as below:

Micom (Areva) make Relays


1.P127 (O/C & E/F) - 11 Nos
2.P922 (Under Voltage) - 4 Nos
3.P225 (Motor Protection) - 19 Nos
4.P122 (Differential Protection) - 3 Nos
L&T make Relays
5.MC61C (O/C & E/F) - 15 Nos
6.MM30 (Motor Protection) - 18 Nos

ABB make Relays


7.SPAJ140C (O/C & E/F) - 1 No
8.SPAM150 (Motor Protection) - 15 Nos
Total = 86 Nos.

1. The work shall be carried out during shutdown of respective auxiliary


2. Total quantity of relays to be tested as per list.
3. Contractor has to arrange for calibrated relay testing kit & required T&P.
4. Contractor has to arrange expert manufacturer testing team at power station as per our schedule.
5. Authorization and supporting letter from principle/manufacturer is necessary.
6. Detailed testing reports in duplicate shall be submitted by the contractor duly signed by
principle/manufacturer’s testing team.
7. In case of any relay found faulty, the spare relay will be provided by the MSPGCL and testing is to be
carried out by contractor without any extra cost.
8. Any work which is not mentioned in the above scope of work but necessary for completion of work
will be carried out by the contractor without any extra cost.

SPECIAL TERMS AND CONDITIONS

1. The contract period shall be six months from the date of order. However MAHAGENCO reserves
the right to terminate/ short/ close the contract in the interest of MAHAGENCO.
2. The rates are firm till the completion of works in all respect. No any variations shall be entertained
afterwards.
3. Relay test certificate of principle / manufacturer will be accepted.
4. Six months Guarantee of the tested relays shall be provided. During guarantee period free of cost
checking / rectification shall be carried out by the contractor.
5. Power station is a prohibited area therefore the contractor will have to follow all security rules &
regulations and duty timings etc.
6. The contractor will have to follow all thePagesafety
11 of 23rules and regulations.
7. Company will not be responsible for any accident or injury to contractor or his staff in such cases
any hospitalization / medical assistance and compensation etc. will be paid by the contractor only.
8. The Contractor will be fully responsible for his manpower
TENDER-58762/AMENDMENT-0/23-Nov-2017 while
09:44:08 AM executing the work and the
contractor persons while executing the work should use all safety equipments.
9. In case of dispute or litigation brought by the works or their union relating to contract labour issue,
the contractor shall bear expenses, including expenses to the spent by principal employer.
10. Contractor has to obtain Gate-Pass with receipt of work order and start the work as per directives
of section Head, otherwise action as deem fit, shall be taken against contractor.
11. All the scrap generated during the works shall be retained by us.

STANDARD TERMS AND CONDITIONS


1) Terms of Payment: The contractor shall submit the bills in triplicate in the first week of each
month for the work actually carried out in previous month based on above joint measurement
by MSPGCL representative & contractor. The measurement of actual work done by the
contractor shall be recorded daily & signed by both, contractor & MSPGCL authorized
representative. The contractor shall prepare the bill & enclose the daily measurement
certificate before submitting bills to the office for payment. All the certificates required for this
contract are to be printed / cyclostyled by the contractor at his own cost. The proforma will be
given by the Exe. Engineer, BTPS, Deepnagar OR his authorized representative. No interest on
delayed payment will be made to contractor in any case. The payment to be claimed must be in
full rupee only.
2) Penalty:- If the work is not carried out within the time limit then delay penalty 1% per day will
be deducted from your bills up to maximum 10% of the order value, unless the reason for delay
is beyond the control of contractor. If the progress at any stage found slow resulting in
irrecoverable delay, MSPGCL reserve the right to get the part/whole of the work done through
other available agency at the cost and risk contractor
3) The contractor is solely responsible if any kind of labour strike arises & in such incidences of
strike, contractor will insure the labour supply by making alternative arrangement. In case of
any financial loss or damage to the company property occurs, it will be recovered from the
contractor’s outstanding payments.
4) Contract Period: The order shall be valid for Six Months from the order dispatch date or
till the completion of ordered quantity. However MAHAGENCO reserves the right to
terminate/short/close the contract in the interest of MAHAGENCO. The rates shall be
confirmed till the completion of all works in all respect. No any variations shall be entertained
after words.
5) After accepting the work order against this tender, it will be the total responsibility of the
contractor to carry out the work up to the satisfaction of the Engineer In-charge by deploying
the sufficient nos. of labourers & using the tools, tackles, vehicles necessarily required though
not specifically covered in this tender document. The contractor will be totally responsible for
the wages, amenities to be provided to his labourers / staff & the compensation to his staff or
any other person not employed with him, arising in connection with work covered in this
tender.
6) Bhusawal Thermal Power Station is a prohibited area. Contractor will have to follow the
various rules laid down by the Company. Contractor can get his difficulties cleared, if any
from Security Officer after receiving the firm order.
The vehicles and staff of contractor will be allowed to move inside Power Station premises and
Colony Area only after following the complete formalities. For obtaining the entry gate passes
for the Workers/Staff. Contractor will have to submit the passport size Photograph and the
Character Certificate of Worker from the Police Dept./Police Station Authority of the area in
which he resides.
7) In case of additional work for proper cleaning during shutdown, contractor has to deploy even
extra labour force within short notice for which no additional payments will be done.
8) Contractor has to obtain daily the performance certificate from Area In-charge / In-charge of
Unit as specified for completion of cleaning work of all prescribed areas on that particular day.
9) During shutdown or for emergency works the labourers will be diverted wherever required.
10) Workers shall be confined to the working spot only and shall not be found wandering in
unauthorized area.
Page 12 of 23
11) Engagement of Labourers: Contractor has to employ only healthy & capable male labourers
in sufficient strength to carry out all the works specified in the scope of work of this tender to
the satisfaction ofTENDER-58762/AMENDMENT-0/23-Nov-2017
the Company’s authority / representative. Female labourers will not be
09:44:08 AM
allowed to work without prior approval of Engineer In – charge. Labourers engaged by him
will be bound by Rules and Regulations of the Company and the Factory Act, 1948. If the
labourers are found unsuitable, the contractor should remove them from their service on
demand by the undersigned or authorized representative of the Company. Contractor has to
employ only male labourers above 18 years of age.
12) Labour engaged should be ITI qualified or should have minimum 5 years experience of
technical work. Documentary proof should be submitted to section during execution of PO.
13) Character of labourers employed shall be good. If they will be found committing any theft,
misconduct or mischief in the plant they must be immediately discontinued from the services.
Loss incurred on this account shall be recovered from the contractor’s bills. The contractor
will make his own arrangement for parking his vehicles outside the power station premises.
14) Working hours: The working hours of the labourers deployed by the contractor shall be 8 hrs.
only & contractor will observe the Factory rules in this respect. Normal working hrs should be
followed. All the days including Sunday are working days. The work is to be carried out as per
requirement of the scheme so as to complete the work in the stipulated period after observing
all the industrial safety & factory rules in this respect.
Contractor will be required to obtain the clearance before starting the work from the
Company’s authorized representative.
15) Variation in quantities: The quantities indicated in Work Schedule may vary on either side in
case of increase in quantities the contractor will be required to carry out the work on the same
quoted rates, terms and conditions. In case of any decrease in the quantities no compensation
will be paid to contractor which may please be noted. The Company reserves the right not to
operate any item or items mentioned in Work Schedule without giving any reason.
16) Tools & Tackles: All tools and tackles required for the execution of the work shall be
arranged by the contractor at his own cost. No tools / equipments or any other assistance in
this regard will be supplied by the Company. Company will not take any responsibility for the
safety custody for the contractor’s tools and tackles.
17) Contractor has to submit list of tools and tackles with marking that are brought to site. No
claim whatsoever by way of theft or damage to his tools and tackles will be entertained by the
Company.
18) Presence at site: The contractor will always be available at site to receive the instructions
from time to time. In his absence he will post at site his authorized representative with prior
approval of the undersigned or Company representative to supervise the job for expeditious
completion of the work. After issuing the instruction to contractor’s representative it will be
assumed that the instructions are conveyed to the contractor.Routine maintenance of the track
shall be carried out during day time only. However during emergency such as derailments /
accidents, the staff should be available at site within short notice of half an hour to carry out
the track maintenance & safe clearance for further movement of wagons
19) Statutory Laws & Amendments: The contract will be governed by various statutory labour
laws of state and Central Govt. in force and amendments thereof from time to time. It will be
the total responsibility of the contractor to observe and maintain all the Govt. Rules & Laws.
20) You will have to deposit Rs.48/- per labourer half yearly in June & December till 15th July and
15th January of respective year with the Labour / Welfare Commissioner, Jalgaon under
provision of Bombay Labour Welfare Fund Act, 1953. Out of above Rs.48/-, Rs.12/- are to
contributed by the labourer and Rs.36/- by the contractor every half yearly or as awarded up to
date.
21) The contractor will maintain all required registers and records up to-date. He has to maintain
“Leave with Wages Register in Form-20” as prescribed in Maharashtra Factory Act, 1963. He
will have to produce all these records for inspection whenever required by COMPANY
officials or by any Govt. officials.
22) Contractor will be responsible for compliance of all statutory obligations under Factory Act,
Minimum Wages Act, Payment of Wages Act, Contract Labour Act, 1970, other Labour Laws
etc. and will also be responsible for payment of employees / employer’s contribution as
required under E.F.P. Scheme and ESI Act in respect of his employees.
23) You will have to pay 8.33 % bonus to your labourers at the time of Diwali as per provision of
Page 13 of 23
payment of Bonus Act.
You will have to pay HRA to your labourers at the rate of 5 % as per rule.
24) As per Govt. of Maharashtra Industries, Energy & Labour
TENDER-58762/AMENDMENT-0/23-Nov-2017 09:44:08Deptt,
AM Mumbai Notification No.
MWA/102002/CR-88/LAB-7,dtd. 30.06.2004 the prescribed the minimum wages to be paid to
the labourers working in different Power Stations of COMPANY for the following
categories with effect from 01. 01. 2014.
The wages are inclusive of Weekly day rest. The contractor will take note of above and will be
required to release payment almost by cheque to the labourers almost by cheque accordingly or
any change from time to time as per the Minimum Wages Act., if contract is awarded.
25) As per the Contract Labour Rules framed by the Govt. of Maharashtra :
a) Contractor will obtain a licence from Licencing Officer or Asstt. Commissioner of
Labour, Jalgaon by paying the requisite fees in Govt. Treasury depending upon the
labourers you will be employing.
b) Contractor will submit this office the monthly attendance of labourers, maximum No.of
labourers deployed by him on the works and total monthly wages paid to these
labourers.
c) Contractor will make his own arrangement for amenities for his labourers as stated in
Chapter-V of the said rules.
d) The date of payment to the labourers shall be informed well in advance so that
representative from this office will be deputed to witness the payment and he will
record the certificate as required under the rules.
e) Licence is to be renewed well in time as specified in Rule-29 and submit to this office.
f) The Contract Lab. Act, 1970 of Govt. of India and Maharashtra Govt. Contract Labour
Rules, 1971 wherever applicable will be binding on the contractor. In case of any
default on the part of contractor, suitable action as per the provisions of the said act and
rules framed by the Govt. of Maharashtra will be taken.
26) Termination of Contract: The Chief Engineer, (O&M) reserves the right to terminate the
contract at any time during the contract period without any notice, if it found that the
contractor is not able to cope up with the work satisfactorily or if it is found that smooth
running of the Power Station is affected. The Company shall exercise it’s powers as below:
a) The work will be assigned to some other agency and the extra expenditure incurred with
penalty and 15% supervision charges will be recovered from any of contractor’s dues with
COMPANY. This will be applicable for unexecuted portion of the work. Decision of the
Company authorities will be final and binding on the contractor in this regard.
AND / OR
b) To recover the liquidated damages / penalty from the contractor.
AND / OR
c) Forfeit the Security Deposit paid by the contractor.

27) Failure to execute the works at the risk and cost:


a) For failure to execute the works, the Engineer Incharge is at liberty without further
notice or reminder to the contractor to get the works done or any portion thereof on
account of and at the risk of the contractor and to put up a claim for the difference in
rates and for all expenses whatsoever incurred in getting the works executed through
departmentally or any other agency which the Company is wholly authorized to recover
from any money due for payment to the contract or from bills or deposit or any amount.
Such expenses will include 15% Supervision Charges.
b) In case the contractor fails to execute any item of the contract wholly or in part, the loss
to the Company due to any extra payment to get the work done through an alternative
arrangement will be to the account of contractor and the same will be recoverable as
per Company’s rules from any dues payable to him or as may occur in course of time
c) Contractor will make good the loss and extra expenditure incurred by the Company due
to non-execution of part of the work. All such amount will be recovered from the
amount which is due for payment to him by the Company and may result in the
termination of the contract.
d) On termination of the contract,
Page 14the
of 23 additional expenses which the Company will bear

for getting the work executed by employing labour or through alternative agencies will
be recoverable from the contractor, whose contract
TENDER-58762/AMENDMENT-0/23-Nov-2017 is AM
09:44:08 terminated as mentioned in the
proceeding clause.
28) a) Deduction : Any amount or amounts which in case recoverable from contractor under this
contract or any other contract of the Company will be deducted by the Company from any
amount / amounts due or becoming due to him from any other contracts with the Company.
b) Save & Except : Amount / amounts due on account of charges or compensation for default
or breach of contract by the contractor in which case instead of deduction of the said amount /
amounts will be retained and the Company will have the right to lien on amount / amounts so
retained or withheld.
29) After completion of the contract period the contractor has to clear all his works before the new
contractor starts the work. In case he leaves the work unfinished after expiry of contract
period, the remaining of the allotted work will be done by external agency or by the new
contractor. The amount of the bill raised for this work will be recovered from his last R.A. bill
or from Security Deposit which may please be noted.
30) Contractor will be deemed to be fully aware of Company General Conditions of Contract
particularly in respect of Security Deposit, Compensation for Delay, unsatisfactory progress,
terms of payment, action and compensation payable in case of bad works, contractors liabilities
rescission of contract, forfeiture of deposit etc. any ignorance of these condition will not
exempt contractor from his liability to abide by the same.
31) MSPGCL reserves the right to award the total work to the single party or to split up the work
in two or even more parties.
32) The undersigned reserves the right to award the contract initially for a period of 3 months for
assigning the performance of the contractor. In case trial order is placed on some other party
then earnest money deposit will be refunded after placement of order for the balance period of
contract.
33) Arbitrator: Any dispute between contractor & Company if required to be referred to
Arbitrator, the terms & conditions as per draft on Arbitrator approved by the company shall be
applicable
34) Jurisdiction: All disputes or differences arising under or in connection with the contract if
concluded will be subject to the exclusive jurisdiction of Bhusawal Courts only.
35) The COMPANY reserves the right to accept or reject any or all offers or cancel/withdraw the
invitation to tender or to annual the tenderization process at any time prior to award of
contract, without assigning any reason for such decision. Such decision by the Chief Engineer,
(O&M) BTPS, Deepnagar shall not be subject to question by any Bidder & the COMPANY
shall bear no liability whatsoever consequences upon such a decision nor shall have any
obligation to inform the affected Bidder / Bidders of the grounds for the COMPANY’s Action.
36) Safety Agreement: Your staff working in plant should be provided with personal protective
equipments and conversant with the safe working procedure. You will enter into agreement
with MSPGCL as safety policy as per MSPGCL format immediately after receipt of order.
37) Before starting the work the contractor has to submit the contract agreement on Court Stamp
Paper
1. Of Rs. 500/- for order amount up to Rs. 10 Lacs.
2. Of Rs. 500/- for order amount up to Rs. 10 Lacs plus Rs. 100/- for next every Rs. 1 Lacs of
order amount limited maximum Rs. 5 Lacs.

Chief Engineer (O&M)


BTPS, Deepnagar

Page 15 of 23
TENDER-58762/AMENDMENT-0/23-Nov-2017 09:44:08 AM CA Rev: 00 date: 01/06/2008
On Stamp Paper of Rs.100/-

CONTRACT AGREEMENT FORM

This agreement made on the …../………./200…day Between M/s ……....…….…….…………


(Hereinafter called ‘The Contractor’ which expression shall unless excluded by or repugnant to the
context include his successors or assigners) of the one part and the Chief General Manager (Gen),
Thermal Power Station of MAHAGENCO at ………………………………….. …………… (Hereinafter
called ‘the company which expression shall unless excluded by or repugnant to the context include his
successors or assigners) of the other part.
Whereas the Purchaser ...…………………………………………………………………………
invited tenders for ……………………………………………….… at ……………………………………… in
exercise of his powers vested in him by the MAHAGENCO.
Whereas the Contractor has submitted his offer in the prescribed tender documents which were
opened by the MAHAGENCO on dated …../…./200… and whereas his tender has been accepted by
the MAHAGENCO and This office order No …………………………………………………………………
……………… dated …../……./200… for ………………………………...……………………………… at
……………………..………………………………………. and contract awarded to the Contractor on the
terms and conditions specified in the tender document and Contract for works’ ( Applicable for works
Contract ) attached with the Tender.
Now, this agreement witnesses and it is hereby agreed and declared as under:
The provisions contained in the documents and letters a numerated below form a part of this
agreement.
Tender specifications submitted by the Contractor duly filled and signed and opened on
…../…/200… for ………………………………………………………………….. at
…………………………………, including the terms and conditions contained therein.
‘Terms & Conditions of Tender Works’ (Applicable for works Contract) attached with the tender
specification.
This office order No. …………………………………. dated …../……./200…
It witness where on both parties, their authorized representatives set their hands and seal of the parties
on the day and the year above written.
Signed by or on behalf of the Contractor in the presence of witnesses:
1. Name : Shri …………………………………………………………….
Signature ……………………………………………………………….
2. Name : Shri. ……………………………………………………………
Signature ……………………………
Contractor’s Signature
Signed by or on behalf of the MAHAGENCO in the presence of witnesses:
Signed by or on behalf of the Contractor in the presence of witnesses:
1. Name : Shri …………………………………………………………….
Signature ……………………………………………………………….
2. Name : Shri. ……………………………………………………………
Signature ……………………………
Purchaser Authority,
MAHAGENCO, ………………………

Page 16 of 23
TENDER-58762/AMENDMENT-0/23-Nov-2017 09:44:08 AM

PROFORMA OF INDEMNITY BOND

This Deed of indemnity is made this, the Day ……/………/ 20…. by Mr / Mrs / M/s …………
……………………. resident of ……………………………………………………………………………….

Whereas I am the holder of ………………………………………………………… ………………


and whereas I ……………………………………..with necessary documents (vide letter No. ………….
dated ……/………/ 20…. as required by Section 52 of ………………………………………………...

And whereas for ……………………………………………, I had given an undertaking in the form


of an affidavit (copy enclosed) to the …………………………………………….

And this deed witnesses that in pursuance of the aforesaid affidavit and in consideration of
…………………………………………………………. having agreed to ………………………………………,
I hereby undertake to indemnify and keep harmless the ……………………………………………………..
from all proceedings in courts and before other authorities including the Competent Authority and other
authorities appointed ………………………………………………………………, all expenses / losses /
claims which the ……………………………………………………….. may incur or become liable to pay as
result, or in consequence, or the sanction accorded by it to building plans in respect of the aforesaid
…………………………………………….

I further state that I and all my successor-in-interest shall abide by the aforesaid terms and
conditions of this Deed of Indemnity.

Witnesses

1) ………………………………….. Signature of the Party

2) …………………………………..

Page 17 of 23
TENDER-58762/AMENDMENT-0/23-Nov-2017 09:44:08 AM
Rev: 00, Date: 01/01/2009 

Maharashtra State Power Generation Co Ltd 
e_tendering Cell 
This Section is applicable to all Power Stations Thermal, Hydro & Gas 
SAFETY TERMS & CONDITIONS 
1. Compensation: Safety of your workers and staff is your sole responsibility & you will arrange to pay full compensation 
to your workers/staff.  In case of accident to any of them and in any circumstances MSPGCL will not be responsible for 
and liable to pay any compensation as per WORKMENS COMPENSATION ACT. 
2. Competency / Excellence: Contractor should deploy competent workers  for  the particular  job  and he should utilize 
authorized  his workers  for carrying the electrical works such as welding, grinding   and  other works carried out by 
electrical   equipments. Contractor should submit the list of his workers deployed for the job and list of workers who 
are   authorized for carrying electrical works to the concerned section head for verification of competency of their 
workers, before starting the work as per the rules 1951. 
3. Electrical Safety:  
3.1. Every portable electrical tool should be used with three pin plugs and three wire systems to avoid electric shock 
while at work proper earthing should be checked both at supply end and at tool end before commencement of 
work. 
3.2. Three wire sockets and properly insulated portable electrical boards with fuses & with earth leakage circuit 
breaker are to be used by contractor. On/Off switch should be connected in the live wire and no it in neutral wire. 
3.3. Colour coding of three wire system should be below.  Red: Live, Grey / Black: Neutral, Green: Earth. 
3.4. Only 24 volt hand lamps to be used at confined spaces lying at turbine, boiler, coal mills, grills, structures, coal 
handling plant, Conveyor belts etc 
4. Fire Safety:  
4.1. The contractor should keep ready two buckets of water while carrying out welding work. One bucket is to be used 
for quenching fire if occurs. Last bit of electrode should be dropped in the second bucket with water to ensure 
that red‐hot electrode does not cause any fire. 
4.2. Contractor should ensure provision of Cover/curtain in the hazardous area, so that hot petals of metal (molten 
metal) do not cause any fire. This is particularly necessary while carrying out welding /gas cutting at high elevation 
on grills, in coal handling plants etc. 
4.3. Single piece cable (without joints) should be used during welding work to avoid the fire through cable joint. 
5. Medical:  
5.1. In case of injury of person, arrangement for shifting of the injured person for medical treatment is to be made 
immediately by the contractor.  
5.2. The contractor should keep "First aid box" ready at site. 
6. Penalty: If any of our officer, supervisor finds that, you & your employees are not following the safety rules and 
regulation including use of personnel protective equipments at site; he is authorized to stop your work immediately. In 
case of violation of safety rules, you shall be liable to pay penalty up to Rs.  1000.00 for first violation and up to Rs. 
3000.00 for second violations. For the third violation of rules the order may be terminated or you may be declared 
debarred for the further contract up to period of one year.  For violation of fire safety the contract will be terminated 
immediately and the contractor will not be considered for further contract. 
7. Safety Appliances / Equipments : Contractor shall provides required safety appliances / equipments to their workers 
like safety shoes, helmet, goggles, welding screen, safety belts, hand‐gloves etc. depending upon the working condition 
and nature of the work in hand. You shall arrange the appliances / equipments at your own cost. 
8. Scrap Removal: All type of scraps to be removed immediately from the work spot for maintaining cleanliness. 
9. Supervisors: Adequate Nos. of supervisors to be appointed by the contractor to ensure all safety provisions and use of 
personnel protective equipments by contractor workers. 
10. Testing of T & P / Equipment: Contractor should maintain history register of their lifting tools and tackles, such as   
chain pulleys blocks, slings, tirfor etc. and these are to be tested by competent persons   authorized by Director of 
Industrial Safety & Health Mumbai, as per Maharashtra Factory Rule (96). Copy of the test certificate should be 
submitted to Safety Officer. 
 

Page 18 of 23
TENDER-58762/AMENDMENT-0/23-Nov-2017 09:44:08 AM  Rev: 00, Date: 01/01/2009 

MMa ah
haarra
assh httrra
aSStta
atte
eP Poow
weerr G
Ge en
neerra
attiio
onnC
CooL Lttd
d
This Section is applicable to all Power Stations Thermal, Hydro & Gas 

WO R K   O R D E R   T E R M S   &   C O N D I T I O N S  
 

SN  Description 
1. Acceptance: Please communicate your acceptance within 10 days. In case acceptance is not received within time 
it will be assumed that the order is acceptable to you. 
2. Accommodation:  Housing  accommodation  will  not  be  provided  by  MAHAGENCO  to  the  contractor  or  his 
workmen. 
3. Assurance  to  Bankers: The request of  the agency  regarding  assurance  about  payment to any  Bank  shall not  be 
entertained in any condition which may please be noted. The payment shall be effected to the firm only. 
4. Attendance:  You or your  representative  should  be  present  at  works  site to  receive the  instructions /  directions 
regarding the work. 
5. Bank Charges: Your Bank charges at your account and our charges at our account.
6. Common  Consumables:  Common  consumables  including  general  purpose  welding  electrodes,  cut  rods,  oxy‐
acetylene gas, ware, service air/instrument air etc. if available will be issued by MAHAGENCO on chargeable basis 
as per actual rates.  
7. Company's property: Proper care should be taken while working so that there will be no hindrances to any other 
work going in the plant, damage to the Company's property. Any loss on the account will be recovered from any 
of your dues with the Company. 
8. Compensation: No compensation claim of idle labour for any reason will be entertained by the Company.
9. Defect  during  Guarantee:  Any  defect  noticed  during  the  guarantee  period  as  specified  from  the  date  of 
completion of work due to poor workmanship will have to be attended by the contractor at his own cost and risk. 
10 Electrical  License:  For  electrical  works  Contractor  should  have  valid  Electrical  License  to  carry  out  such  type  of 
works. Attested Xerox copy of License should be enclosed along with the offer. All works should be carried out as 
per Indian Electricity Rule 
11 Electricity: Electricity required for above work will be provided by MAHAGENCO at free of cost but at one point 
only. The contractor will have to arrange for any further extension if required including bulb wires, cables etc. at 
his own cost and risk. 
12 Environmental  Issues:  Contractor  and  his employee  shall  follow  the  current  practices  /  procedure  being 
implemented  at  Purchasers  location  as  per  ISO  14001‐2004and  shall  fulfill  the  environmental  norms  / 
requirements specified / latest issued by the State and Central Gove 
13 Gate Pass: Contractor will have to prepare identification passes as per procedure laid down by security section for 
all the employees/workers entering in the power plant premises for the subject work. 
14 Income Tax: Income tax plus surcharge as per the prevailing rules will be deducted from your bills while releasing 
the payments. 
15 Labour Competence: In case labour/s found unsuitable, he / they should be removed from work site and suitable 
substitute must be arranged immediately. 
16 Medical: You will have to submit medical fitness certificate of your employees / labours before starting of work.
17 Miscellaneous Work: Any other miscellaneous work which is related to this work and not covered in the scope of 
work  /  schedule  and  becomes  necessary  to  be  carried  out  to  complete  the  work,  should  be  carried  by  you  for 
which no extra payment will be made. 
18 WCT (TDS): WCT if applicable will be deducted from the  contractor’s bill as per the  MVAT Act 2002 of Govt. of 
Maharashtra. 
19 Order Reference: For any correspondence, reference of our Order should be invariably indicated. 
20
Our Banker: As specified in section III 
21 Payments: Full payment will be released within 45 days after satisfactory completion  of the work in all respect 
and submission of bill in triplicate against recording of bill/Running account bill in Measurement Book. 
22 Penalty for Late Work: The work will have to be started immediately as & when asked by MAHAGENCO authority 
to complete it within the stipulated time, failing which penalty of 1 % per day maximum limited to the 10 % of the 
contract value will be recovered.  
23 PF  Registration: You  have  to  indicate  your  Provident  Fund registration number  and  submit  group  insurance  for 
manpower to be engaged by you. 
24 Protocol: Joint protocol shall be made regarding successful completion of work as per scope of work and terms 
before submission of bills. 
25 Rates: The rates will remain firm through out the contract period / completion period including extended period if 
any. 

Page 19 of 23

3 Please, consider your environmental responsibility. Before printing this document ask yourself: "Do I really need a hard copy?" 
TENDER-58762/AMENDMENT-0/23-Nov-2017 09:44:08 AM  Rev: 00, Date: 01/01/2009 
SN  Description 
26 Right  to  Cancel  the  Work:  The  Company  reserves  the  right  to  cancel  the  work  order  in  part  or  full  if  the  work 
quality, progress is found to be unsatisfactory. In such case the unexecuted work will be got completed through 
some another agency/ departmentally. For this extra expenditure if any incurred will be recovered along with 15 
% supervision charges from any of the Contractor’s dues with MAHAGENCO. Decision of the Company authority 
will be final and binding on the Contractor. 
27 Right:  The  undersigned  reserves  the  right  to  accept or  reject  any  or  all  the  offers  without  assigning  any  reason 
thereof. 
28 RTGS  Payment  Term:  The  payment  shall  be  released  through  RTGS  (Real  Time  Gross  System)  /  NEFT  (National 
Electronic  Fund  Transfer).  To  facilitate  this  Contractor  will  have  to  furnish  Name  of  the  Bank  &  Branch,  Bank 
Account No. 15 digits, IFSC code 11 digits. 
29 Rules & Regulations: Your staff will be governed by relevant Rules, Regulations and Acts of State / central / Govt. 
in force, such as Workmen compensation Act, Minimum wages Act, Factory Act, Provident Fund Act, Labour Act 
etc. 
30 Safety Equipments: Contractor should provide safety equipments to the staff engaged for this contract. In case of 
accidents to  your workmen, you will  have to pay workmen compensation as per the  Workmen's Compensation 
Act.  
31 Safety Regulation: The contractor will have to follow safety regulation strictly and ensure precautions against any 
fire  hazards  while  working.  Contractors  authorized  representative  shall  have  to  be  present  at  works  place  to 
ensure safe working environment. 
32 Scaffolding:  The  contractor  should  arrange  the  scaffolding,  if  necessary  to  complete  the  work.  However  the 
scaffolding material will be provided on the returnable basis subject to the availability. 
33 Scope of Work: You will have to carry out the work as per the Scope of work, terms and conditions mentioned / 
attached. 
34 Security Deposit: The Contractor  will have to deposit 5 % of the contract value as security deposit before starting 
the work as a guarantee for the satisfactory performance of work, which will likely be forfeited at the discretion of 
MAHAGENCO authority in case of any default on the Contractor ’s part 
35 Service Tax: Service Tax for this work contract will be paid extra against documentary evidence. Please mention it 
separately as extra in your offer. If it is not mentioned, it will be assumed that the rates quoted are inclusive of 
service tax. The Contractor shall inform the registration number. 
36 Spares: Spares required for replacement purpose will be issued by MAHAGENCO at free of cost. You will have to 
use them carefully and submit material account of spares issued / used along with the bill. 
37 T & P: The Company will not provide T & P except special T & P.
38 Transportation:  All  the  transportation  of  material  from  the  place  of  issue  to  the  site  of  work  and  balance 
material/scrap back to the place as per the directives of MAHAGENCO authorities will have to be carried out by 
the Contractor  at their own cost and risk 
39 Work  Satisfaction:  The  work  should  be  carried  out  as  per  the  direction  and  up  to  the  satisfaction  of  the 
undersigned or the Contract Operating Authority (COA) concern Sectional Head. 

Page 20 of 23

3 Please, consider your environmental responsibility. Before printing this document ask yourself: "Do I really need a hard copy?" 
TENDER-58762/AMENDMENT-0/23-Nov-2017 09:44:08 AM

TECHNO-COMMERCIAL BID

BID DOCUMENTS
S No. Document Name Document Details
1 EXPERIENCE CERTIFICATE * Experience of similar work in support of cl. No. (1)
Labour license or declaration of less than 20
2 LABOUR LICENSE * labours
3 GST Certificate * GST Registration certificate
PROVIDENT FUND REGISTRATION
4 Provident Fund Registration
CERTIFICATE *
5 PAN CARD * PAN certificate
SHOP AND ESTABLISHMENT REGISTRATION
6 Registration certificate of the firm
CERTIFICATE *
7 SOLVANCY CERTIFICATE * Latest & Valid solvency certificate
8 TURNOVER CERTIFICATE * AAverage annual financial turnover
9 PERFORMANCE CERTIFICATE * Performance Certificate as per cl. no.(3)
10 Past PO * Past Purchase Orders as per cl no.(2) (a)/(b)/(c)
11 ELECTRICAL WORK LICENSE * Valid Electrical License
* - Indicates Mandatory Document to Fill (to participate in tender)

ITEM DETAILS

Specification
Item Code Item Name Category Documents

Comments
Qty. Req.

Drawing
Version Req. from
S. No.

Unit

Vendors

RELAY<>GEN & X-MER


054-07-001- PROTN<>NUMERICAL<>AREVA / No Documents
1 WORKS 01.00 AU 0 No No N.A.
001-0002 * ABB<>TESTING OF MICOM SERIES Selected
PROTECTION RELAYS
* - Indicates Mandatory Item to Quote (or to participate in tender)

Page 21 of 23
TENDER-58762/AMENDMENT-0/23-Nov-2017 09:44:08 AM

PRICE BID

BID DOCUMENTS
NOT REQUIRED

FORMULA DETAILS
Category Name Formula
RATEPERUNIT+TOTALGSTINRUPEESONRATEPERUNIT+TRANSPOTATIONCHARGE
SINRUPEES+TOTALGSTINRUPEESONTRANSPOTATIONCHARGES+CONSULTANCY
WORKS CHARGESINRUPEES+TOTALGSTINRUPEESONCONSULTANCYCHARGES+TOANDF
ROCHARGESINRUPEES+TOTALGSTINRUPEESONTOANDFROCHARGES+TRANSITI
NSURANCEINRUPEES+TOTALGSTINRUPEESONTRANSITINSURANCE

Page 22 of 23
TENDER-58762/AMENDMENT-0/23-Nov-2017 09:44:08 AM

Price Schedule : WORKS


GST ON TOTAL GST ON TOTAL GST ON TOTAL
GST ON GST ON TOTAL
TOTAL TRANSP
TRANSP GST ON CONSUL CONSUL GST ON TO AND TO AND GST ON TRANSIT
RATE TRANSIT GST ON
Quantity Rate Per GST ON OTATION
OTATION TRANSP TANCY TANCY CONSUL FRO FRO TO AND INSURAN
Item PER INSURAN TRANSIT Total
S No. (in Unit (in RATEPE CHARGE
CHARGE OTATION CHARGE CHARGE TANCY CHARGE CHARGE FRO
Code UNIT (in CHARGE CE (in CE (in INSURAN
Number) Rupees) RUNIT (in S (in
S (in CHARGE S (in S (in CHARGE S (in S (in
Percentag Rupees) Percentag CE (in
Rupees) Rupees)
Percentag S (in Rupees) Percentag S (in Rupees) Percentag S (in
e) e) Rupees)
e) Rupees) e) Rupees) e) Rupees)
1 [RELAY<>GEN & X-MER PROTN<>NUMERICAL<>AREVA / ABB<>TESTING OF MICOM SERIES PROTECTION RELAYS]
054-07-
001-001-
0002 *
* - Indicate Price required for this item.

Page 23 of 23

Das könnte Ihnen auch gefallen