S.NO. DESCRIOTION OF WORK QUANTITY UNIT RATE PER AMOUNT
1 Earth Work in Excavation 143.83 cum ` %cum 2 PCC in Foundation CC 1:4:8 13.09 cum cum 3 Brick Work in Foundation and Plinth with 1:6 Cement Mort 75.53 cum cum 4 DPC 28.81 sqm sqm 5 Brick Work in Superstructure with 1:3 Cement Mortar 89.81 cum cum 6 Plastering 12.5mm in 1:3 Cement Sand Mortar 369.67 sqm sqm 7 White Washing 369.67 sqm sqm 8 Painting with Ready Mix Paint 369.67 sqm sqm 9 12.5mm Plaster in Ceiling with 1:3 Cement Mortar 170.1 sqm sqm 10 RCC Slab with M20 17.01 cum cum 11 Steel in Slab 1335.29 kg kg 12 RCC Column with M20 4.42 cum cum 13 Steel in Column 1387.88 kg kg 14 Sand Filling 16.726 cum %cum 15 PCC Below Flooring 12.54 cum cum 16 Flooring 167.26 sqm sqm 17 Earth Work in Filling 1806.88 cum %cum BSTRACT OF COST AMOUNT