S.NO. DESCRIOTION OF WORK QUANTITY UNIT RATE PER AMOUNT


1 Earth Work in Excavation 143.83 cum ` %cum
2 PCC in Foundation CC 1:4:8 13.09 cum cum
3 Brick Work in Foundation and Plinth with 1:6 Cement Mort 75.53 cum cum
4 DPC 28.81 sqm sqm
5 Brick Work in Superstructure with 1:3 Cement Mortar 89.81 cum cum
6 Plastering 12.5mm in 1:3 Cement Sand Mortar 369.67 sqm sqm
7 White Washing 369.67 sqm sqm
8 Painting with Ready Mix Paint 369.67 sqm sqm
9 12.5mm Plaster in Ceiling with 1:3 Cement Mortar 170.1 sqm sqm
10 RCC Slab with M20 17.01 cum cum
11 Steel in Slab 1335.29 kg kg
12 RCC Column with M20 4.42 cum cum
13 Steel in Column 1387.88 kg kg
14 Sand Filling 16.726 cum %cum
15 PCC Below Flooring 12.54 cum cum
16 Flooring 167.26 sqm sqm
17 Earth Work in Filling 1806.88 cum %cum