IEC News Letter

Volume 2, Issue 1 Year-2011


IEC Newsletter
Sunil Khanna – Managing Director
Emerson Process Management India Pvt Ltd

Smart Wireless Instrumentation for Offshore Applications


O&G Offshore operators are continuously standard. These can easily be integrated Evolution of the Smart Wireless
on the lookout for ways to reduce capital with existing Distributed Control systems technology
and operational expenditure in an using standard communication protocols For years, 4-20 mA analog
increasingly fluctuating business like Modbus and Ethernet LAN. Full instrumentation was the industry
environment. With less weight, smaller redundancy protects the wireless network standard. Beginning in the mid-1990s, the
footprint and enhanced security and from any single point of failure by allowing search began for a digital replacement,
reliability, wireless technology provides primary fail-over to failure by allowing and FOUNDATION™ fieldbus was
answers to some of these business primary fail-over to ensure that the data developed. It is now widely used
challenges and is fast changing the are always delivered even if there is a throughout the industry, especially for
industry's thought patterns. How does one malfunction. Other enhancements controls. The first wireless networks were
extend the power of predictive intelligence include redundant wireless I/O, power limited by a line of sight requirement - a
into areas that were previously out of and communications, and a redundant drawback that was especially
physical or economic reach and open the Smart Wireless Remote Link. When cumbersome on offshore platforms.
doors for new possibilities in process offshore operators are planning for the Today's Smart Wireless solution uses a
improvement? Remote locations, physical platforms of the future, they're now self-organizing mesh technology that
obstructions, and the high cost of thinking about a combination of new path overcomes this obstacle. Self-organizing
engineering and integrating new breaking concepts like fieldbus, electronic mesh networks continuously monitor
technologies with exiting technologies marshalling, and wireless. Those transmissions from a variety of
should no longer be the barriers for this. installations who have deployed wireless measurement devices that keep track of
Decision makers today have become are finding that wireless can be cost pressure, temperature, flow, pH,
more comfortable and familiar with effective, economical, and quickly conductivity and even position or
wireless technology applications offshore. installed. It's going to prompt a mindset vibration. The network automatically finds
In the past several years, wireless change about the design process with the best communication route back to the
monitoring instruments have made their greater awareness of what customers network gateway. If a connection is
way into remote, hard-to-reach areas need and what they don't really need. This temporarily blocked, signals are rerouted
on offshore platforms where high is leading to paradigm shift from wired to to adjacent wireless devices, and
construction costs made wired devices wireless technology. connectivity is maintained.
uneconomical. Though we have to This mesh technology is the basis for the
acknowledge that traditional cabling will internationally accepted IEC 62591
continue to be used in contiguous areas, standard. It enables users to quickly and
as well as in safety systems, wireless is fast easily gain the benefits of wireless
gaining acceptance as a credible solution. technology while maintaining
Existing offshore facilities are taking compatibility with existing devices, tools,
greater advantage of wireless benefits, and and systems. With this technology, as you
new construction projects are being built add more devices to the network, the
with wireless in mind. This shows that entire network continues to get stronger
wireless is now seen as capital investment and stronger with more potential
and is a key component in the CAPEX communication paths for each device to
plans. Facilities using reliable and robust use. This is very important when you think
wireless technology are realizing savings about the ever-changing environments
and becoming smarter through simpler plant instrumentation faces each day –
engineering and construction, flexible pumps, motors, and fans cycling on and
startup, faster deployment and project off, scaffolding being erected and torn
completion. down, welders, and a whole host of other
Today there are several real-world Smart things happening all the time. With the
Wireless installations using one-second network's ability to automatically reroute
updates, enhanced PID and battery data, we see data reliabilities of more than
management based on the IEC 62591 99%, regardless of process environment
(WirelessHART®) communication or application.

2
IEC Newsletter
Impacting the bottom line Scalable solutions fit a variety of needs of the facility and there is no distributed
When Smart Wireless technology is used The Smart Wireless technology can be control system (DCS) rack room, a
for 25% to 45% of total I/O on both small adapted seamlessly to cover anything communications link (or backhaul) is
and large capital projects, significant from a small field network to a full facility installed to bring the information back to
savings can result. An Emerson Process complex. Smart Wireless is neither a top- the DCS. The other three applications
Management study of an actual offshore down nor bottom-up model. One can affect personnel and security. The
platform with about 4,000 I/O proves begin at the plant network level and work business driver for the mobile worker
wireless technology can be broadly used down to the field, or at the field network application is worker productivity,
in process applications. and work up. One can start anywhere Improvements are realized when
based on what the highest priority needs operations and maintenance workers are
In fact, restricting wireless to those able to take the control room console with
applications where deploying wired are. You are not required to invest in an
expensive wireless infrastructure them or have access to asset management
instruments would be too expensive or tools or procedures for troubleshooting
impossible is only limiting the realm of throughout the facility to try out a simple
monitoring application. Field and facility problems. Video surveillance is widely
actual possibilities. implemented as part of facility process
networks have different technical
safety and security systems. The
traditional wired system is costly and takes
a long time to deploy. Using wireless
networks, video feeds can be delivered to
the control room and office buildings with
flexibility not possible with a wired
solution. Video has many practical uses
offshore. One operator faced corrosion
issues in its FPSO [Floating Production,
Storage, and Offloading] storage tanks.
When they tried to determine how they
were going to monitor it, wireless video
cameras were the obvious answer. Also,
using video conferencing with personnel
on the platform has limited the travel and
Examination of various combinations of considerations. Wireless field networks location risks. Safety mustering and asset
wired HART, fieldbus, and wireless use lower bandwidth for short, high- tracking improve personnel safety,
devices, and the projected installed costs priority communications. Operating from enhance facility security, and optimize the
showed wireless to be cost-effective batteries that last from five to 10 years, the use of critical assets in a harsh
in comparison with the other field networks (usually many devices environment. People's safety is the highest
communications means. For the platform distributed in harsh environments) have priority, providing full visibility to people's
studied, approximately 17% of signals low power demands and are secure and locations in hazardous areas or mustering
were economically and reliably reliable. For facilities, Smart Wireless stations is extremely critical to an efficient
transmitted via wireless devices. In this brings the high bandwidth, flexibility, and evacuation in case of emergency.
case, installing wireless along with other expansion capabilities required for
technologies in the process control system Technology designed with the customer
business and operational applications.
can realize savings of up to 7%, or more in mind
Open standards such as 802.11 (Wi-Fi)
than USD 1 Million. An additional saving is are used to provide these solutions. Top 'Make it easy to use' was a motto during
seen in eliminating 800 wired points, applications for facility networks include: the entire product development process of
which results in weight saving of up to 35 t h e S m a r t W i r e l e s s t e c h n o l o g y.
tons, and reduces required deck space of ■Field data backhaul■Mobile workers Customers today do not have the
up to 4,556 sq. ft. in cabling, cable trays, resources or the time to learn new
junction boxes, and cabinets. When ■Video technologies and buy special interfaces
another study compared wireless to the and software. Plus, with Smart Wireless,
traditional hardwired 4-20 mA/HART you don't have to run cables to every
■Safety mustering and asset tracking.
design, the savings were even more device, making installation much simpler
significant. They found 44% of the total Field data backhaul is the most common than for wired networks. In fact, the major
points can be wireless, which would result wireless application. If a number of attraction of this technology is that you
in a savings of 36%. wireless field devices are in a remote area don't have to deal with the complexity of

3
IEC Newsletter
all those wires. Because the Smart ■Tapping the power of in-situ meter measurement point can be reduced by an
Wireless devices have the same process order of magnitude using wireless
verification for Magnetic flowmeters and
connections as traditional wired HART instrument networks.
Coriolis meters, enabling significant
devices, existing procedures can be used But for a significant capital project—a new
operational improvements
to complete the installation. Sensors for Greenfield unit or a significant brownfield
Smart Wireless can be calibrated using the expansion – the wireless value
■Enabling enhanced valve capabilities
same configuration tools as for traditional proposition may not seem as clear cut.
with in-service valve testing, alert
HART devices. Sophisticated planning Few would propose to eliminate wires
monitoring, and valve position trending
and costly site surveys are not necessary altogether in a new process plant, so if
for field networks. As long as each device some number of wires must still be run,
or gateway is within range of at least one
■ Remotely managing devices and
monitoring health by allowing customers when does it make sense to install a
other, it can communicate with the parallel wireless infrastructure as well?
network. Site surveys are a must to define to troubleshoot HART devices from their
own desks Increasingly, the answer is “all the time.”
line-of-sight communication paths in And not primarily because of installed cost
traditional point-to-point wireless savings either. Rather, it's the forward-
solutions or those where network
■Making any HART device wireless and
eliminating the high cost of loop wiring looking flexibility of wireless that allows
reliability is a concern. These surveys can the addition of measurement points and
be time-consuming, especially if due to remote locations or physical
obstructions the change and evolution of control
equipment or other obstacles limit strategies and work practices that has
available communication paths. earned wireless a place alongside fieldbus
■ Efficiently gathering data from
and traditional point-to-point hardwiring
Adapting legacy systems for wireless multivariable devices.
in the preferred mix of process automation
use The case for implementing wireless in network technologies for capital projects.
Emerson Process Management has existing facilities has been well made and
So, in the end, our question to the
developed a unique product called the has justified thousands of applications in
Offshore O&G producers is: Why
Smart Wireless THUM™ Adapter that process plants worldwide over the past
wouldn't Smart Wireless be part of your
helps free up diagnostics and process several years. If a few incremental
next capital project?
information from existing HART field measurement points are needed, and you
instruments that were previously can avoid running new conduit or
inaccessible in wired legacy system armored cable to the field; if you can avoid
installations. Most HART instruments the need to add new cabinet space; if you
have rich diagnostics and process data, yet can avoid the need to expand I/O capacity
this valuable information goes unused - installed cost per incremental
because older legacy systems are not
equipped to receive HART
communications.
Since it is often too expensive and
complicated to access this data through
traditional wired means, upgrading
transmitters with the THUM Adapter is an
easy and cost effective way to 'see' the
valuable diagnostic and process
information. The THUM Adapter is a
WirelessHART device that can retrofit
onto almost any two- or four-wire HART
device without special power
requirements to enable wireless
transmission of measurement and
diagnostic information. Devices with the
THUM Adapter operate as components of
Emerson's Smart Wireless self-organizing
field networks. As a result, predictive
intelligence can be expanded into key
areas throughout the facility by:

4
IEC Newsletter
Souvik Ghosal , L&T Control & Automation.

Intricacies of Dam Instrumentation for water bodies


Dams are barriers that restrain water which joints. These are important for monitoring Data Acquisition System is built
is used for storage and then evenly the behavior of civil structures and incorporating the programmable
distributed between various locations buildings and are rugged and robust, measurement and control module that
through service pipe lines. Dams and their corrosion proof & easy to install, reliable, provides sensor measurement,
infrastructure are occasionally subjected to accurate and compatible with data loggers communication, data reduction,
extreme conditions in which they are fully or acquisition system data/program storage and control
loaded, such as floods and earth quakes. Normal/Inverted Plumb Line: Normal functions. A battery backed clock assures
Such conditions adversely affect the Plumb line is used for the measurement & accurate time keeping. A multi tasking
stability of the structure. Instrumentation monitoring of displacement between the operating system allows simultaneous
and control systems help in analysis of the top and base of a DAM. The Inverted measurement and communications
behavior of the Dam and take remedial Plumb line is used for the measurement & functions. The DAS scans the data
actions. monitoring of displacement between the channels from a few times per second to
Dam monitoring, maintenance and safety base of the DAM & the rock foundation. once every few hours. The DAS Database
is a complex and challenging task which These instruments are more accurate than is mapped in SCADA server in any
calls for implementation of a variety of with Geodesic or Theodolite survey. standard database format like MS SQL,
instruments to monitor the various forces Access etc. The SCADA system is
Earth & Concrete Pressure Cell: are interfaced with a remote Station Control
acting on the colossal structure at all times. used measures the vertical pressure of the
Safe and efficient maintenance of a dam Center (SCC) over VSAT network. From
concrete. The Pressure cell consists of the remote station, dam parameters like
calls for a variety of fail safe and monitoring pressure transducer incorporating the latest
systems as well as proper application of dam level, service flow, seismic data,
vibrating wire technology to provide weather data, etc. are continuously
these systems through intricate remote and digital readout. These are Fluid
engineering. The system architecture, monitored and recorded for decision
filled for high rigidity and provide accurate making activities. This complex system is
interconnection of the systems, and fast response.
specifications of the equipments, an example of an intricate and elaborate
functionalities have to be accurate and Seismographs are used to measure the monitoring and control system used in
seamless. seismic movement around the dam and Dams.
recorded at station. For the first time in India a completely
Modernized automated dams call for
customized instruments for Dam Thermocouples: are embedded in the SCADA controlled Dam monitoring
monitoring, integrated with Data concrete structure to measure the system is being implemented by Control &
Acquisition Systems, PLC and SCADA temperature changes in the dam body Automation (C&A) Business Unit of
systems designed for process control and which is critical parameter to consider L a r s e n & To u b r o f o r M u n i c i p a l
monitoring the behavior of Dam. during the RCC construction. Temperature Corporation of Greater Mumbai (MCGM)
is monitored for next 4-5 years to study on the Vaitarna river in Thane's Kochale
A typical set of instruments that go in Dam village in Maharashtra. The project is
RCC behavior.
projects include: targeted to complete by year 2012. The
PLC and Process Instruments: PLC and
Pore Pressure Meter used to measure dam will stand at a height of 102 meter
horde of other process instruments like flow
pore water pressure in soil, earth/rock fills, when completed and will hold up 455
meter, level meter and analyzers are used
foundations and concrete structures. These million liter of water vital for Mumbai's
to monitor and control the dam operation
devices are protected against lightning growing water demand. The challenging
such as opening and closing of service
spikes, hermetically sealed under a vacuum task of implementing instrumentation and
gates, radial gates, control service flow etc.
of 0.001 Toor and have the ability to control systems will extend over a period of
measure negative pressure and very small All Dam instruments are hooked up to Data three years and will be done in phases.
tile lag, capable of transmitting signal as Acquisition System (DAS) and process Designing the control philosophy of dam
frequency over long wire lengths. instruments are interfaced with PLC and operation and implementation using PLC
accumulated data is further transmitted to a is also critical task undertaken by C&A.
Strain Gauge designed for the SCADA over the standard protocol. The
measurement of dynamic strains in
concrete structures, asphalt roadways and
soils. Strain Gauge has good frequency for
tracking rapid fluctuations in stress, capable
of simultaneous measurement of multiple
points and remote points and provides
electrical output for easy data processing.
Crack/Joint Meter are ideally suited for
measurement of movement of concrete

5
IEC Newsletter
Dileep Miskin – UL Group of Companies

Dileep Miskin – UL Group of Companies


More uniformity for greater multiplicity disciplines are combined. Later on for which is a familiar tool for many process
(in the planning workflow) of Electrical maintenance or possible changes he must engineers.
CAD softwares (CAE) be able to use and operate all these Thanks to its multi-level client-server
A great mass of data, and that from different tools architecture EB can be used from a
different fields of application: Planning notebook to a company-wide multiuser
Combination prowess
process engineering plants is characterized solution. The branch solutions based on
by complicated coordination of quite Whether for coordinating the disciplines in the platform cover everything from P&I
different highly developed specialist the planning phase or concentrating the (P&ID) via I&E design and engineering
disciplines. Thus up to now the task was to know-how at the operator's site – at and electrical engineering to planning the
get under one umbrella the classical CAD present only one integrated tool with cabling and the hydraulic system. They
for the P&I diagrams, special I&E planning standard database and an open object are all mutually operable because they are
tools and the peculiarities of electrical system offers the solution for an up-to- based on the same data model. Taking the
engineering tools, and then to take this as date projecting job. If all planning tags as an example, it becomes clear what
basis for constructing a consistent, safe workflows are combined in one tool, then this means:
process engineering plant. An additional many interfaces are left out, and with them
difficulty is brought about by the ever- many sources of error. However, the Unity generates speed – and safety
increasing demands on the safety of the complexity of the tasks involved in The tags are specified and labelled on a
data and the plants. A database-driven planning process engineering plants can P&I flow diagram – often with a simple
CAE platform achieves the make a uniform tool covering everything CAD program. In parallel there are tabular
standardization and nonetheless offers extremely complicated. applications where the same tags must
easy handling. With this danger in mind, the Hanover- again be recorded for a detailed definition.
based system house Aucotec placed Apart from the time required, this results in
A question of the discipline particular emphasis on easy handling, thus several sources of error initially during
In a process engineering job for a creating a database-driven and object- data adoption into the table and later on
manufacturing process, materials are oriented tool that is able to combine all when changes are made – even if the
mixed, ground or subjected to chemical electrically relevant plant units under one change is only a renaming. The next step is
reactions and transported through roof; it can moreover integrate and detail engineering: In electrical planning
pipelines. The control of these plants is the manage associated disciplines such as the via Electrical-CAD system the designer
task of the measuring and control 3-D pipeline planning or the specification elaborates among other things the
technology. The planning job starts with a of the software modules for the tags. representation of the field distributors as
process description, and the different well as of the cabinets, e.g. with power
plant units meet in the typically graphic 25 Years of experience in various fields supply or the control system cards. Again
P&I diagram. Measurement tags are of application one deals with the same tags. Their
defined and specified in tabular form, and With different ECAE systems for sensors, connectors and cables are the job
interconnection typicals are used to mechanical engineering and plant of the electrical engineering department.
describe the interfacing with the construction but also for power generation This means another round of adopting
corresponding control system. For the and and wiring harness development, tags and integrating them into the
filling machines one encounters classical Aucotec has in 25 years been able to electrical diagram, considering and
plant construction, however: Here achieve a high standing. All of this correcting later changes – again new
special-purpose machines and conveying experience has been integrated into the potential sources of error for the same
equipment must be combined and their platform Engineering Base (EB), which components. Even without corrections
higher-level cabling must be designed. For with its branch solution "Instrumentation" entering tags costs precious time and
individual packaging machines the offers several unique properties. consumes expensive specialist resources.
electrotechnical planning approach is The typical-oriented approach of I&E Merging the data on a common basis
required, which operates by equipping an design and engineering can also be therefore means vast gains in time for the
assigned cabinet with devices and wiring it exploited in general plant construction if highly qualified personnel in the
– including the appropriate energy supply the handling is designed to be intuitive. disciplines involved.
and fusing. This ease of operation was one of the most
Putting together what belongs together
For plant designers as well as operators important specifications for the new
this means a large number of tools and platform. Therefore the Aucotec Because of the database foundation a tag
interfaces that must be handled and developers decided exclusively in favor of has to be specified and declared only
surveyed. And the operator needs a lot of Office-compliant user interfaces; once. All persons in charge of additional
know-how because there the data from all Microsoft Visio is used for graphic editing, subject areas access precisely these tags

6
IEC Newsletter
and just add their special details. In the representation e.g. of the pipeline lengths functions the designer can create purely
integrated environment each operator or process connections are again stored in logical functions in the plant hierarchy and
uses his favored view, but in the the very database used for feeding all similarly equip them with software
background each object is present only representations. modules.
once. If a tag is renamed, it appears Thus both designers and operators can A first pilot project showed that the
renamed everywhere – no further search save costs for several tools as well as originally scheduled time interval for
and no confusion. Thus many people training and maintenance costs because creating the software was reduced from
work jointly on a data model that maps the the platform indeed offers a hitherto four weeks to half a day of extra work in
complete plant on the computer. unknown level of standardization. EB. The otherwise common renewed
And EB Instrumentation not only unites complete setup of all signals is
the different projecting disciplines of the Extreme time economy by interfacing superfluous.
process engineering proper but also with the control system software
UL Group in India brings in the richly
enables links to connected tasks: The 2-D EB also integrates the generation of the loaded software with various libraries for
pipeline design is passed from the P&I control system software for the loops into ease of applications in the variety of the
diagram to a 3-D tool in the XML format in the overall planning. Here the time Industrial applications. Many users are in
order to optimize the spatial arrangement economy is extraordinary because the the stage of the implementation of their
there – for example supported by tool can specify the software components documentation in their system workflow
automatically laid splines. Again the needed for each tag. The latest at the planning stage itself. This will go a
mechanic accesses precisely the same development permits selecting from a list long way to have the uniformity in the
objects that were specified in the 2-D of standard modules. Moreover in application & the availability of the data to
representation. Changes in the 3-D addition to the measuring and control the users whent hey need this.

7
IEC Newsletter
Haren Shah- Marketing Executive
Meco Instruments Pvt. Ltd. Navi Mumbai

Innovative Methods for Measurement


of Earthing / Grounding Systems.

Electrical Safety : Earthing Aspect


Hazards Happening Everyday Due To Improper Earthing

8
IEC Newsletter

The faults in any electrical system are long as life and disappears when life goes. object differs person to person. It depends
unavoidable. Every electrical This potential difference is very small 10 to on body resistance (varies 500 to 1 lack
equipment's, appliance, system must be 100 millivolts. ohms.) at time of accident (Man-9ma,
Earthed or grounded to obtain a low Wo m e n - 6 m a , c h i l d 4 . 5 m a )
Galvany in 1780 proved that all live
resistance path for dissipation of current Under the provisions of Indian Electrical
muscles contract when electricity applied.
into the earth. Earthing plays an important Rules 1956, Electrical installation of the
When contraction due to electricity is
role in Generation, Transmission & licensees, consumers are inspected every
more that will power contract and relaxes
Distribution for safe and proper operation year by the Electrical Inspectorate wing
which brings to death due to electric
of any electric installation. of Government of Maharashtra under
shocks. The current affect heart muscles
the guidance of Chief Engineer
Electricity most often kills a man not and when contract become too powerful,
(Electrical) P.W.D. Mumbai for
causing extreme physical injuries but by muscles bewildered and fall in state of
observance and for enforcement of safety
merely shocking the life out of the body flutter, called ventricular fibrillation, the
measures for working on electrical
suddenly. This is due to life and electricity heart stops functioning. It will be proper to
Equipment , Installation. During
in minute form being closely inter-related know what current and potentials are safe
inspection of every installations, overhead
so that a small current can prove fatal. to handle.
lines Transformers, etc. if any defects are
When body is alive it is found to maintain a
The maximum safe current person can observed then the recommendations are
potential difference between its inside and
tolerate and still release grip of energize given to the concerned for compliance of
outside. This potential difference exists as

9
IEC Newsletter
the same. Also all the electrical accidents through capacitor. As phase position respect to the general mass of earth, the
are investigated by the electrical changed & phase comes directly in potential of current carrying conductors,
Inspectorate wing to check the contact with chassis: circuit is completed which are part of the equipment, non-
observance of electrical measures and but as a capacitor of antenna gets shorted current carrying metal works, associated
recommendations are given for & leakage transfer from chassis to metallic with the equipment, apparatus and
compliance. part of antenna. appliances connected to the system.

In the field the condition of earthing is so Ø A holy cow fell down in the Ø Earthing plays an important role
poor and normally earth resistance or gutter and got shocked. Earth wire was i n G e n e r a t i o n , Tr a n s m i s s i o n &
leakage current is not measured either disconnected from earth rod and was in Distribution for safe and proper operation
because of prevailing tedious & time energized condition due to heavy leakage. of electric system.
consuming methods or handy instruments
Whenever electrical Installation is to be Ø Every Earthing should be tested
were not available. Many a times the
completed its non-conducting parts / checked at regular interval so as
important aspect of proper earthing is
should be connected firmly to earth resistance of Earth connection should be
neglected resulting in complex problems
electrodes. Every Electrical Installation minimum. The records should be
associated with poor earthing. The
should be having proper Earthing. maintained if results are poor, action
Distribution Transformers fail because of
Earthing provides protection against should be taken to be improved.
earthing not being proper and lightening
dangerous potential under fault
arrestors do not carry out their work. In Old Measurement Methods is called fall of
conditions.
case of HT consumers the meter behaves potential method./ In this method earth
erratic as unbalance voltages are recorded It is also important to take precautions grid is to be isolated from the earth
due to poor earthing or no earthing. To against leakage of current. Insulation electrode. Two auxiliary electrodes – one
ensure proper monitoring of earthing it is Resistance values should be checked current electrode and another potential
necessary to give a handy and easy to use periodically. It is also necessary to electrode are placed besides the electrode
equipment to the field staff. maintained Earthing properly of all to be tested at equal distance in a straight
electrical Installation. As the same time it is line. A measured current is passed
Major Accident are happened due to
also very important at regular interval to through the auxiliary current electrode.
improper earthing and leakage current
check and if required unproper Earthing The potential difference developed
passed through human body or through
should be repaired. between the auxiliary potential electrode
hazards material and fatality or loss
and the electrode
occurs. Importance Of Proper Earthing /
Grounding Systems Measurement Of Earthing / Grounding
Ø Person dies after touching the
- The Most Neglected Subject Today!
pole. It was observed that the pole was not Ø Every electrical equipment or
earthed & lamp wire inside was with appliance must be 'Earthed' or 'Grounded' Old Measurement Methods Are:
deteriorated insulation & came in contact for the safety of equipment, network as a
Ø Crude
with inside pole. whole and operating personnel.
Ø Time Consuming
Ø In a sugar factory a person was Ø Ground fault current directly has
stacking sugar bags by climbing on steel an impact on human safety. Major Ø Require Shut - Downs
ladder. He took support of roof truss and accidents happen due to improper
Ø In-Accurate
got shock. The fitting erected on truss was Earthing. Leakage current passes through
short & leakage pass to labor. human body and fatality occurs. Ø Strainful

Ø A person on the roof is Ø Every Overhead line / Sub Now Latest Handy Instuments are
electrocuted as he touches the TV station / Generator station which is available to measure Ground / Earth
antenna. In TV phase directly goes to exposed are liable to injury from lightning. Resistance and Leakage Current By just
internal circuit & neutral connected to clamping to the grounding lines without
Ø Purpose of Earthing in an
chassis. Antenna circuit is also connected disconnecting the circuit or Driving
electric power system is to limit, with
auxiliary electrodes. Meco 4680 Clamp-

10
IEC Newsletter

On Earth / Ground Resistance Tester can liable to injury from lightening, shall adopt potential rise of the surrounding earth is
measure ground resistance & AC current efficient means for diverting to earth any minimized.
(load/leakage) by just clamping to the electric surge.
Ø E a r t h i n g w i r e o f
grounding lines without disconnecting the
Ø To measure at earthing wire of Telecommunication shelter cabin or
circuit or driving Auxiliary Electrodes. Is
Transformer to check proper grounding as Signal Relay Antenna at Ground near
based on an unique principal in which a
most difficulties occur from the contact Earth Bit. As it is important to reduce the
pre-defined current is injected in the
between the soil & the stack. If this is poor Electrodynamics stress on material to limit
ground circuit under test and then the
the flow of electricity is resistricated the induced voltage on
induced magnetic current there by
Telecommunication line & Over voltage
generated in the circuit is measured at a Ø To measure earth / ground
on LV Component.
high frequency by use of special clamp -on resistance of Live Electrical installation
current transformer in the instrument. earthing wire of any The objectives of Maintaining Proper
Transformer/Motor/Control Panel Earthing is very good but the road ahead is
Major Application of Measuring Earth
Without shutdown. In a Delta connected very long, rough and tardy but with the
Resistance and Leakage Current
system a neutral point shall be obtained by cooperation and strong will, nothing is
Ø Earthing cable of Transmission insertion of grounding transformer & impossible.
Pole (Tower) to get ground resistance of current limiting resistance or impedance.
soil resistivities. Soil resistivity is a crucial
Neutral point to measure proper
factor in obtaining a “Good Earth”. Every
grounding of Passive lines. An effective
overhead line, which is exposed as to be
grounding system is one in which the

11
IEC Newsletter
Suprita Mitta – Reliance Industries Ltd.

Proud of you!
Time Machine – II

Friends! As you know my past adventure, where I went to future in my machine,


now, I decided to go to the past. I will narrate my experience to you. I had gone 1
billion years ago in my machine. It was the time when dinosaurs ruled the earth. I
took all my tools and weapons to protect myself from the dinosaurs. I entered the
machine and Whooooosh!
When I opened my eyes, I realized I was in a forest with my machine. It was very
thick forest. Then I heard something howling. Was it a dinosaur?

M.Harish (Age : 10 years) my spine. “It is an early man”, I shouted. my machine, I realized that I was lost. Now
Yes! It was. my real adventure began. I was so
Then I saw a huge Tyrannosaurs Rex. It
frightened that my hair was standing in the
was about 70 feet high. I was trembling It was very hairy and he was taller than me.
end. Then I heard a loud roar. “Again”, I
with excitement. It howled so loudly that, it He spoke in a strange language which I
cried and saw the huge Tyrannosaurs Rex
seemed to shake the earth. It was trying to could not understand. I was very thirsty
and I started running in full speed. After
eat me. I ran and ran until I found myself and made gesture that I need water to
sometime the dinosaur vanished. Now,
lost. My heart was beating hard. At the drink. He took me to small pool outside
what do I do? I thought. Should I live here
same time I saw Ceratopsia, the only where I could quench my thirst. He
for my entire life, a scary thought was in
dinosaur with horns and it came charging offered me meat but as I am vegetarian I
my mind. Then I remembered that I had
towards me. I picked up my pistol and shot could not eat anything. I was starving.
brought all the tools and chemicals to
the bullet at the dinosaur but it missed
In fact, I was trapped. If I go out of the make my machine. I was starving to death.
because my hands were shaking so much.
cave, I would fall prey of the dinosaur and Finally, I took me one day to build the
I ran in the opposite direction but there
if I am in the cave, I would be starving! machine. Then I stepped into my machine
stood a Brachiosaurus, the largest meat
Somehow, I managed in the cave that and went to 2010.
eating dinosaur.
night.
Now I know that life was very close to
Now, I was in a great trouble. I turned to
Next morning, I set out in search of some nature but was more lonely and
the other side and ran. I ran and ran until I
fruits. I got to eat few apples. Soon I dangerous in the past.
saw a cave. When I went inside it, it was
realized I had no friends and no pizzas and
very dark and I heard someone or
no burgers. When I turned to get back into
something make noises. A chill ran down

12
IEC Newsletter
Prabha Verma
Deputy Engineering Manager- Instruments
Aker Powergas Pvt. Ltd., Mumbai 400 042, India

Keep it up !
Time Machine – II
My daughter Ekta Verma is 16yrs old & a student of DPS. She is Gold Award" in 15th International drawing competition held in
very creative & artistic child and has won numerous prizes in Japan in 2009. She is also bagged 3rd prize at state level art
drawing and craft, both in school and outside. She is student of competition organized by Godkar's Art Academy. She received
Bankim Art Academy at Vashi. This year she is one of the top 17 honorary prize in Yang-Ming 2nd international children's painting
finalists in 13th Annual Peace Pals International Art competition in contest held in Taiwan in 2008.
age category 16-19yrs. She is one of the recipients of "Hydrangea

13
IEC Newsletter

Jokes Corner
Automotive Engineer vs. Vanilla Ice Cream

A complaint was received by the Pontiac but sent an engineer to check it out In a short time, he had a clue: the man
Division of General Motors: "This is the anyway. The latter was surprised to be took less time to buy vanilla than any other
second time I have written you, and I don't greeted by a successful, obviously well flavor. Why? The answer was in the layout
blame you for not answering me, because educated man in a fine neighborhood. He of the store. Vanilla, being the most
I kind of sounded crazy, but it is a fact that had arranged to meet the man just after popular flavor, was in a separate case at
we have a tradition in our family of ice dinner time, so the two hopped into the the front of the store for quick pickup. All
cream for dessert after dinner each night. car and drove to the ice cream store. It was the other flavors were kept in the back of
But the kind of ice cream varies so, every vanilla ice cream that night and, sure the store at a different counter where it
night, after we've eaten, the whole family enough, after they came back to the car, it took considerably longer to find the flavor
votes on which kind of ice cream we wouldn't start. and get checked out.
should have and I drive down to the store
to get it. It's also a fact that I recently The engineer returned for three more Now the question for the engineer was
purchased a new Pontiac and since then nights. The first night, the man got why the car wouldn't start when it took less
my trips to the store have created a chocolate. The car started. The second time. Once time became the problem --
problem. You see, every time I buy vanilla night, he got strawberry. The car started. not the vanilla ice cream -- the engineer
ice cream, when I start back from the store The third night he ordered vanilla. The car quickly came up with the answer: vapor
my car won't start. If I get any other kind of failed to start. lock. It was happening every night, but the
ice cream, the car starts just fine. I want extra time taken to get the other flavors
Now the engineer, being a logical man, allowed the engine to cool down
you to know I'm serious about this refused to believe that this man's car was
question, no matter how silly it sounds: sufficiently to start. When the man got
allergic to vanilla ice cream. He arranged, vanilla, the engine was still too hot for the
'What is there about a Pontiac that makes therefore, to continue his visits for as long
it not start when I get vanilla ice cream, and vapor lock to dissipate.
as it took to solve the problem. And
easy to start whenever I get any other toward this end he began to take notes: he Moral of the story: Even insane looking
kind?'" jotted down all sorts of data, time of day, problems are sometimes real.
The Pontiac President was type of gas used, time to drive back and
understandably skeptical about the letter, forth, etc.

14
IEC Newsletter

Engineers and Lawyers


There was once an engineer who found a I can live with that." He then said, "For my said, "For my second wish, I wish for a
magic lamp. When he rubbed it, a genie first wish, I wish I had a Ferarri." million bucks." So a million bucks
jumped out and said to him, "You have appeared in front of the engineer and the
three wishes. But there is a catch - this wish "OK", said the genie, and a Ferarri genie said, "remember, every lawyer in the
system of mine was designed by a lawyer, appeared in front of the engineer. "But world now has 2 million bucks."
so whatever you wish for every lawyer in remember, every lawyer in the world now
the world will get double of!" has 2 Ferarris," the genie told the engineer. The engineer was non-committal and then
said, "I always wished I could donate a
The engineer replied, "That's no problem, The engineer remained unperturbed and kidney!"

Efficiency Expert
The efficiency expert concluded his for years," the expert explained. The voice from the back asked, "Did it
lecture with a note of caution. "You don't save time?"
want to try these techniques at home." "She made lots of trips to the refrigerator,
stove, table and cabinets, often carrying The expert replied, "Actually, yes. It used
"Why not?" asked someone from the back just a single item at a time. 'Hon,' I to take her 20 minutes to get breakfast
of the audience. suggested, 'Why don't you try carrying ready. Now I do it in seven.”
several things at once?'"
"I watched my wife's routine at breakfast