Name : HRSG Erection Manual

Document : 22033-730-01
Revision :1
Page : 17 of 34

Continuation

Mechanical Completion 9.16) Controls, Electrical &


(Mechanical) Instrumentation

Mechanical Completion
(Electrical &
Instrumentation)

9.17) Chemical Cleaning 9.18) Cold commissioning

9.18) First firing & blow-out

9.19) Installation of
Steamdryers in drums

9.18) Hot commissioning

9.20) Performance test

Step numbers refer to paragraphs in chapter 9. Steps may vary due to circumstances or CONTRACTOR’s
preference. Please note that step 9.1, 9.2, 9.3, as well as 9.11, 9.17, 9.20 are fixed due to HRSG design by
VENDER. Other steps may vary due to circumstances.

Heavy parts will be provided with lifting lugs. However, some components may require extra lifting devices and/
or temporary lifting constructions or facilities.

CONTRACTOR will arrange two spreader beams for lifting the pressure part modules. Furthermore, all
temporary devices are considered to be included in the scope of CONTRACTOR.

The manufactured parts have passed a dimensional check, which is recorded and found to be within the
tolerances. However, check the records first, before starting erection works.

NEM Energy bv - Modular HRSG Systems 03-Feb-2014


Project: Tanjung Uncang CCPP 120 MW Project 22033-730-01 r0 Erection manual