1 EARTH WORK
Site clearing up to a depth of 20 cm to remove the top soil
1.1
Excavation of soil for an average depth of 180 cm
1.2
dia. 6mm
dia. 10mm
dia. 12mm
dia. 16mm
4.1 Apply 3 cm thick trawl finish cement screed with 1:3 mix
cement sand mortar over the floor slab
Apply minimum 25 mm thick plastering to the internal wall
4.2 of the reservoir with 1:2 mix cement sand mortar to fine
finish to make the reservoir water tight