3. ALINMENT PLANNING
3.1 INTRODUCTION
Mumbai Rail Vikas Corporation (MRVC) through Phase – III of MUTP has plans to
commission regular suburban rail services up to Dahanu Road and accordingly
quadrupling of tracks between Virar to Dahanu Raod is one of the important project
(Figure 1.1). MRVC have commissioned the services of M/s RITES Ltd. to undertake
the pre-feasibility of constructing additional lines between Virar to Dahanu Road.
Preliminary survey was carried out during 1996 for provision of two lines (3rd and 4th)
from Virar to Dahanu Road for the proposed extension of suburban services and
these lines were proposed to run on the east side of the existing tracks.
As per latest planning , Dedicated Freight Corridor alignment joins to the existing VR
– DRD section on East side of existing track at Km 65.87 (between VR-VTN) and
continues parallel to existing corridor up to DRD . The two additional lines for
quadrupling of existing corridor are, therefore, being proposed on West side of the
existing lines. The proposed lines passes through all the existing stations.
This chapter covers the alignment proposals for quadrupling on Virar – Dahanu Road
section of Western Railway.
DAHANU ROAD
Vangaon
Boisar
Umroli
Palghar
Saphale
Kelve Road
Vaitarna
VIRAR PROPOSED VIRAR – DHANU ROAD CORRIDOR
3.3 STATIONS:
There are 9 existing stations between Virar and Dahanu Road covering an
approximate distance of 63.80 Km. Due to alignment of two new lines for
quadrupling being proposed on West side of the existing lines, and being proposed
for catering to suburban services, new platforms meant for suburban services are
required to be constructed at these stations. Table 3.2 gives inter station distances
on Virar to Dahanu Road section.
Table 3.2: Station distances on Virar-Dahanu Road Section
Sr. STATIONS DISTANCE FROM DISTANCE BETWEEN
No. CHURCHGATE (KMs) STATIONS (KMs)
1 VIRAR 59.98 0.00
2 VAITARNA 68.42 8.44
3 SAPHALE 76.74 8.32
4 KELVE RD. 82.55 5.81
5 PALGHAR 90.92 8.37
6 UMROLI 97.15 6.23
7 BOISAR 102.86 5.71
8 VANGAON 111.58 8.72
9 DAHANU RD. 123.78 12.20
Source: Western Railway Time Table, Revised Version, July 2012
Considering the new two lines are meant exclusively for Suburban services, corridor
transfer facility with existing corridor all stations is not proposed. Interconnectivity with
existing two tracks shall be provided at following stations;
Sr. STATION INTERCONNECTIVITY PROVIDED AT
No. SOUTH END NORTH END
1 VIRAR - DN TH – DN LL & DN LL – DN TH
UP TH – UP LL & UP LL – UP TH
2 VAITARNA NIL NIL
3 SAPHALE NIL DN LL – DN TH & UP TH – UP LL
4 KELVE ROAD DN TH – DN LL & UP LL - UPTH
5 PALGHAR DN TH – DN LL & UP LL - UPTH DN LL – DN TH & UP TH – UP LL
6 UMROLI NIL NIL
7 BOISAR DN TH – DN LL & UP LL - UPTH NIL
8 VANGAON NIL NIL
9 DAHANU ROAD DN LL – DN TH & UP TH – UP LL NIL
Proposed alignment of corridor from Virar to Dahanu Road is on west side of existing
track due to the proposed Dedicated Freight Corridor planned on East and is
proposed At-Grade.
At present, proposal of construction of future stations has not been incorporated.
However, future stations locations have been identified based on projected growth
potential of area. Table 3.3 gives the details of existing stations and proposed
identified locations for future development of stations.
Table 3.3: Existing Stations & proposed identified locations for Stations in future
Sr. STATIONS CHAINAGE FROM REMARKS
No. VIRAR (KM)
1 VIRAR 0.000 Dead End of Platform No. 6&7 Track
2 VAITARNA 8.475 Existing station.
3 WADHIV 9.950 Identified location for future station
4 SARTODI 14.600 Identified location for future station
5 SAPHALE 16.118 Existing station
6 MAKUNSAR 19.100 Identified location for future station
7 KELVE ROAD 22.485 Existing station
8 CHINTUPADA 28.600 Identified location for future station
9 PALGHAR 31.107 Existing station
10 KHARALE ROAD 33.254 Identified location for future station
11 UMROLI 37.500 Existing station
12 PANCHALI 39.000 Identified location for future station
13 BOISAR 42.400 Existing station
14 WANJARWADA 45.100 Identified location for future station
15 VANGAON 52.000 Existing station
16 BSES COLONY 61.600 Identified location for future station
17 DAHANU RD. 64.150 Existing station
The alignment of new corridor is proposed keeping in view the identified location for
future stations to facilitate construction of future stations without any need of
alignment modifications.
3.4 ROAD OVER BRIDGES:
There are four existing ROBs on Virar to Dahanu Road section. Fifth ROB has been
completed over Railway Track at North End of Island Platform No. 6&7 at Virar. The
details of ROB are as follows;
i. ROB between Virar – Vaitarna: ROB has been constructed at Km 60.160 Km over
Railway Track at North End of Island Platform No. 6&7 at Virar. The approach road
to ROB is yet to be completed. Adequate spans are provided on either side for
future track alignment.
ii. ROB between Saphale – Kelve Road: ROB 22.5 m span exist at 78.50 Km. 8.8 m
space is available from DN ML & UP ML. As it is feasible to align one track in the
space available, it is proposed to construct one additional span by insertion of RCC
Box for the second track on west side.
iii. ROB between Palghar – Umroli: ROB exist at 91.763 Km. Additional spans do not
exist for alignment of two additional track required for quadrupling of VR-DRD
section. Additional space for two tracks is proposed on west side by insertion of
RCC BOX.
iv. ROB between Umroli – Boisar: ROB exists at 101.66 Km. Additional spans do exist
for alignment of two additional tracks required for quadrupling of VR-DRD section.
v. ROB between Vangaon – Dahanu Road: ROB has been constructed at Km 123.29
Km SOUTH SIDE OF Dahanu Road station. Additional spans do exist for alignment
of two additional track required for quadrupling of VR-DRD section. Since the
proposed new tracks are terminated at 2.224 Km ahead of DRD station, there is no
additional space required at this location.
3.5 BRIDGES:
The total number of bridges on the projected alignment are 82 Nos, grouped as 2
Important Bridges, 18 Major Bridges and 64 Minor Bridges (inclusive of Pipe
crossings) between Virar to Dahanu Road section.
The estimate for Important & Major Bridges has been prepared by actual calculation
of quantities based on typical drawings and for Minor Bridges, the bridges are divided
into groups according to span, height and barrel length and typical calculation for
each group are made.
The linear waterway in meter is as under;
i. Important Bridges 753.91 m
ii. Major Bridges 555.73 m
i. South Vaitarna Bridge: Bridge No. 92 located between Vaitarna & Saphale at Km.
69/2-16 on South Vaitarna River. It has 19 spans of 18.02 m and one span of 9.15 m.
DFCCIL has proposed 20 spans of 19.30 m for the proposed DFC corridor on East side
of the existing bridge.
ii. North Vaitarna Bridge: Bridge No. 93 located between Vaitarna & Saphale at Km.
70/12-16 and is of 22 spans of 18.29 m. DFCCIL has proposed 23 spans of 19.30 m for
the proposed DFC corridor on East side of the existing bridge. Construction of new
bridge at Vaitarna North creek is under progress for DFC corridor.
There are 18 Major Bridges on Virar – Dahanu Road section and Table No. 3.4 gives
the details of Bridges;
TABLE 3.4: LIST OF EXISTING MAJOR BRIDGES
Sr. Between Bride Location Span Remarks
No. stations No.
1 VR – VTN 87 63/8-10 2 X 3.78 Narangi Bridge.
1 X 8.69
2 VR – VTN 88 65/10-12 2 x 8.87 Shirgam Bridge.
3 x 8.95
3 VR – VTN 90 66/22 – 24 3 x 8.80 Dahisar Bridge.
1 x 8.78
1 x 8.81
1 x 8.85
1 x 9.09
4 VR – VTN 91 67/18-20 2 x 8.70 Kasrali Bridge.
3 x 8.79
5 VTN – SAH 96 72/22-24 2 x 6.10
6 VTN – SAH 98 74/8-10 3 x 6.10 Saphale Bridge
7 VTN – SAH 99 74/24-26 3 x 5.94
8 SAH – KLV 115 82/6-8 3 x 6.10 Taki Bridge
9 KLV – PLG 119 83/32 – 4 x 9.14 Moppara River Bridge
84/2
10 KLV – PLG 125 88/2-4 1 x 18.29 Saura River Bridge
11 PLG – BOR 135 94/18-20 1 x 18.29 Dudh River Bridge
12 PLG – BOR 136 94/20-22 2 x 9.14 Kaulgaon Bridge
13 UOI-BOR 143 99.375 1 x 18.29
14 UOI-BOR 144 99.813 3 x 12.80
15 VGN – DRD 161 111/38- 2 x 6.09
112/2
16 VGN – DRD 163 113/22-26 3 x 18.29
17 VGN – DRD 166 118/2-4 3 x 18.29 Dandee River Bridge
18 VGN – DRD 169 120/16-20 6 x 18.29 Samta/Kurru River Bridge
There are 64 Minor Bridges including Pipe Crossings on Virar – Dahanu Road section
and Table No. 3.5 gives the details of Bridges;
TABLE 3.5: LIST OF EXISTING MINOR BRIDGES
Sr. Bridge
Section Location Span
No. No.
1 84 VR - VTN 60/4-5 1x4.80
2 85 VR – VTN 60/22-24 1 X3.10
3 86 VR - VTN 61/4-6 1x3.035
4 95 VTN - SAH 71/30-32 1X2.89
5 96 VTN - SAH 72/22-24 2x6.10
6 97 VTN - SAH 73/4-6 1x6.10
Sr. Bridge
Section Location Span
No. No.
7 100 VTN - SAH 74/30-75/2 2x2.43
8 101 VTN - SAH 75/22-24 1x2.44
9 102 VTN - SAH 76/6-8 1x3.05
10 103 SAH - KLV 76/22-24 1x4.56
11 103A SAH - KLV 77/2-4 1x0.23
12 104 SAH - KLV 77/8-10 1x1.68
13 105 SAH - KLV 77/18-20 1x0.46
14 106 SAH - KLV 77/24-26 6x0.90
15 107 SAH - KLV 78/6-8 3x0.90
16 108 SAH - KLV 78/24-26 1X1.68
17 109 SAH - KLV 79/6-8 1x3.05
18 110 SAH - KLV 79/20-22 2X2.97
19 111 SAH - KLV 80/6-8 1X3.05
20 112 SAH - KLV 80/20-22 1x6.02
21 113 SAH - KLV 80/30-81/2 1x1.83
22 114 SAH - KLV 81/10-12 1x3.05
23 116 KLV-PLG 82/18-20 1x3.05
24 117 KLV-PLG 83/8-10 1x0.45
25 118 KLV-PLG 83/12-14 1x6.10
26 120 KLV-PLG 84/28-30 1x1.83
27 121 KLV-PLG 85/14-16 1x6.02
28 122 KLV-PLG 85/30-86/2 1x3.05
29 123 KLV-PLG 86/22-24 1x3.05
30 124 KLV-PLG 87/2-4 1x0.61
31 124A KLV-PLG 87/26-28 1X0.46
32 126 KLV-PLG 88/24-26 3x5.48
33 129 PLG-BOR 91/26-28 1X1.68
34 130 PLG-BOR 92/6-8 1X1.83
35 131 PLG-BOR 92/14-16 1X1.51
36 132 PLG-BOR 93/2-4 1X3.05
37 133 PLG-BOR 93/16-18 2x5.99
38 134 PLG-BOR 93/22-24 1x3.02
39 137 PLG-BOR 94/30-0 1X3.05
40 138 PLG-BOR 96/6-8 1X3.00
41 139 PLG-BOR 96/16-18 3x5.33
42 140 PLG-BOR 97/4-6 1X0.76
43 144A PLG-BOR 100/18-20 1x3.05
44 145A PLG-BOR 101/6-8 1x0.23
45 145B PLG-BOR 101/18-20 1x0.30
46 145C PLG-BOR 102/6-8 1x0.53
Sr. Bridge
Section Location Span
No. No.
47 146 BOR- VGN 102/14-16 1X0.30
48 147 BOR- VGN 102/24-26 1X0.30
49 147A BOR- VGN 102/28-30 1x0.23
50 148 BOR- VGN 102/30-32 1x0.30
51 149 BOR- VGN 103/10-12 1x0.30
52 150 BOR- VGN 103/18-20 1x2.3
53 151 BOR- VGN 105/2-4 1x2.3
54 152 BOR- VGN 105/18-20 1x6.10
55 153 BOR- VGN 106/6-8 1x1.70
56 155 BOR- VGN 108/2-4 1x4.57
57 157 BOR- VGN 109/4-6 2x2.33
58 158 BOR- VGN 109/26-28 1x3.05
59 160 BOR- VGN 110/6-8 1x2.64
60 160A BOR- VGN 110/10-12 1x0.23
61 164 VGN-DRD 115/14-16 1x9.15
62 167 VGN-DRD 119/8-10 1x1.78
63 168 VGN-DRD 119/20-22 1x0.71
64 172 VGN-DRD 123/14-16 1x3.05
There are 14 level crossings between Virar to Dahanu Road section. As per the
proposal developed for DFCIL, ROBs/RUBs have been proposed at 12 level crossings
where the DFC proposed alignment is parallel to the existing lines on East side of
existing track between Km 65.87 and at Km 118.20. DFCIL authorities need to be
approached to keep additional space under proposed ROB’s and additional barrel
length at RUBs to accommodate two tracks of new lines between Virar to Dahanu
Road while preparing/approving GADs. Table 3.6 gives the details of existing level
crossings;
TABLE 3.6: LIST OF EXISTING LEVEL CROSSINGS
Level Crossing DFC Proposal
Sr.
No. No. Section Block Section Location ROB RUB
1 41 VR – BL VR – VTN 61/18-20
2 42A VR – BL SAH 76/10-12 ROB
3 44 VR – BL SAH – KLV 80/16-18 RUB
4 45 VR – BL KLV – PLG 84/18-20 RUB
5 46 VR – BL KLV – PLG 87/12-14 RUB
Existing curve data obtained from Western Railway shows maximum curvature of
radius of 2286 m (0° 44” 45”) on DN Road and 1750 m radius (1° 00” 00”) on UP
Road. The details are as follows;
TABLE No: 3.7: VIRAR – DAHANU ROAD SECTION: CURVES ON DOWN ROAD
Transition
Curve No.
Total Radius
Sr. Length Dn Degree LH /
Section KM Length (R)
No. end (D) RH
(mtrs.) (mtrs.)
(mtrs.)
1 1 VR-VTN 60/24-63/16 80 1830 0-30'10'' 3475 RH
Transition
Curve No.
Total Radius
Sr. Length Dn Degree LH /
Section KM Length (R)
No. end (D) RH
(mtrs.) (mtrs.)
(mtrs.)
The proposed lines on Virar – Dahanu section will have a maximum curvature similar
to existing corridor.
Acquisition of land shall is proposed for the two new lines where adequate width of
Railway land is not available. The proposed lines are planned to be constructed at a
distance of 6.30 m from existing Down Road and with a track centre of 5.30 m
between the two new lines. Width of land required from the existing track centre has
been assessed based on;
i. Formation width for double line straight track
a. Minimum width in embankment 12.150 m
b. Minimum width in cutting (excluding side drains) 11.550 m
ii. Track centre in case of double line section as 5.30 m
iii. Formation width on curves
a. Increase due to extra ballast on outside of curve – 300 m for double line
b. Increase due to extra clearances on double line on curves, increase in track
centers with corresponding increase in formation width due to the effect of
super elevation.
Considering the above stipulations minimum width of land required from Down Line
towards West side works out to 15.50m in the section.
At stations, wherever additional Platforms are proposed the land requirement has
been worked out as follows;
i. Minimum width of Island Platform 10.20 m for a provision of FOB landing
width of 3 m.
ii. Minimum width of Side Platform 7.0 m for a provision of FOB landing width of
3 m.
iii. Length of proposed platform as 330 m facilitating 15 Car EMU rakes in future.
Provision has been made in Cost Estimate for payment of compensation for land
acquisition required for quadrupling of Virar – Dahanu Road section.
3.9 FORMATION:
3.10 GRADE:
Existing ruling gradient of the section shall be proposed duly compensated for
curvature has been adopted for the two lines proposed for the quadrupling of Virar –
Dahanu Road section. In station yard the gradient shall be preferably level, however if
yards are located on Gradients, then gradient shall generally be not steeper than 1 in
1200 or consistent with the prevailing gradient in existing yard.
1 in 12 Type turnout
1 in 8.5 type turnout
Scissors crossover of 1 in 12 type consisting of 4 turnouts and 1
diamond crossing
On depot lines the turnouts and diamond crossing shall be of the following
type
1 in 8.5 type turnout
Scissors crossover of 1 in 8.5 type consisting of 4 turnouts and 1
diamond crossing
1 in 8.5 derailing switches/ 1 in 8.5 type symmetrical split turnout.
Type and geometry of turnout
Detailed design of all turnouts, scissors crossover shall comply with the following
geometrical parameters.
a. 1 in 12 turnout
The design shall be tangential with switch entry angle not exceeding of 20’00”.
The radius of lead rail of turnout shall not be less than 410m. All clearance shall
be in accordance with relevant provisions of SOD.
b. 1 in 8.5 turnout
The design shall be tangential with switch entry angle not exceeding of 0° 20’00”.
The radius of lead rail of turnout shall not be less than 218m. All clearance shall
be in accordance with relevant provisions of SOD.
c. Scissors Crossover
The base geometry of the turnouts of Scissors crossover shall be same as that of
corresponding ordinary turnouts.
Operating requirement of turnout, Scissor crossover
Track layout design shall permit trains to operate at maximum capability
wherever possible. Turnouts and crossover shall be selected such that they do
not form a restriction to the operating speed on the diverging route. Switches
and crossings shall not be located on transition curves or vertical curves.
Speed
The turnout shall be designed for 110 Kmph on Mainline side with speed
restrictions on curves if required.
The minimum speed potential of the various turnouts and scissors crossover on
the Turnout side should be as follows:
Broad Gauge
1 in 12 type turnout (Speed potential of 50 Kmph)
1 in 8.5 type turnout (Speed potential of 30 Kmph)
Scissors crossover 1 in 12 type (Speed potential of 50 Kmph)
Scissors crossover 1 in 8.5 type (Speed potential of 30 Kmph)
1 in 8.5 type symmetrical split turnout (Speed potential of 40 Kmph)
IV. Sleepers
a. Sleeper shall be of pre-stressed concrete, mono-block, suitable for
installation in track both with and without signalling circuits and with and
without electrification.
b. Sleepers shall be designed to provide a minimum service life of fifty years
under nominal axial load of 20 tonnes and maximum speed of 110 Kmph.
Rail seat pads and liners shall be designed to provide a minimum services
life of 10 years.
c. The sleeper base surface shall be rough cast while the top and side surface
shall be smooth to prevent retention of moisture and foreign materials.
d. Sleepers must be suitable for installation by track laying machines and
sleepers insertion equipment of a type used for isolated sleeper insertion.
e. The sleeper must be able to transfer all the relevant track forces generated
by train operations and the forces of rail expansion and contraction to the
ballast.
V. Switch Expansion Joint
The SEJ for ballasted track shall be laid on PSC sleepers.
The rail section for all SEJs shall be UIL 60, 1080 HH grade as per IRS-T-
12-2009
The SEJ for ballasted track shall be designed for a maximum gap of 80mm.
Further Station locations for the proposed Corridor are identified based on the
projected traffic demand, extension of existing stations, considering availability of land
and road approaches etc.
Integrated Planning of station yard layouts on the proposed corridor is done taking
into consideration the yard layouts of existing stations. Preparation of these yard
layouts give due consideration to the requirement of any shifting / modification to the
existing track / yard layouts at stations. Revised yard plans of the affected portions of
tracks due to the proposed alignment of the Rail corridors at station are shown on the
alignment plans.
Quadrupling lines from VR toward DRD shall commence from North End of Island
Platform No. 6 & 7. Yard remodelling at North End (DRD END) is required to be
carried out as proposed below
Island Platform No. 6& 7 is of 294 m and can facilitate running of 12 Car EMU
service only. Due to ROB Column existing at North End of Platform, it is not
feasible to extend the Platform No. 7 towards North. For running 15 car EMU
services, the required length of 330 m can be obtained by extending platform
no 7 . For extension of Platform no 6 in future by extending the Track towards
South, dismantling and relocation of Station Manger’s Office and Reservation
office would be necessary.
The track leading from Platform No. 6 shall be DN LL and Track from Platform
No. 7 as UP LL for Virar – Dahanu Road section.
The track Leading from Point No. 162 to Platform No. 6 to be dismantled and
1 : 12 RH Turnout to be inserted on the proposed DN LL at CH. 60.451 Km to
facilitate accepting the UP LL from DRD to Platform No. 6.
Proposed alignment requires dismantling of existing Loop line & stabling line
on west side of DN Main Line from Point No. 181 and following works are
involved;
Dismantling of Point No. 181, Derailing switch Point No. 182 at south end
of Loop Line.
Dismantling of Loop Line & stabling line track along with Dead End (1050
M and 2 Dead End).
Dismantling of Crossover Point No. 191 & 192 connecting Loop line to DN
Main Line at North End of Loop Line..
Dismantling of Crossover Point No. 193 & 194 connecting DN Main Line to
UP Main Line at North End of Loop Line.
Dismantling of Signals Nos. S/Sh-86, Sh-88 and S- 75.
To facilitate all movements with DN & UP Main Line with the proposed DN LL
& UP LL (VR-DRD) and also with Clear Loop & Stabling siding following
crossover points are proposed to be inserted;
1 : 12 crossover between UP TH & DN TH: UP TH at CH.60.277 KM &
DN TH at CH. 60.368 Km.
1 : 12 crossover between DN TH & UP LL(VR-DRD): DN TH at
CH.60.381 KM & UP LL (DRD) at CH. 60.491 Km.
1 : 12 crossover between UP LL & DN LL (PF Line No. 6) (VR – DRD): UP
LL Point No. 162 & DN LL (PF Line No. 6) at CH. 60.451 Km.
1 : 12 crossover between UP LL & DN LL: UP LL at CH.60.569 KM & DN
LL at CH. 60.666 Km.
1 : 12 crossover between UP LL & DN TH: UP LL at CH.60.878 KM & DN
TH at CH. 60.769 Km.
The existing Clear Loop of 450 m and Stabling Siding of 454 m are required to
be dismantled for the proposed alignment of DN LL & UP LL from Island
Platform No. 6&7. New Loop & Stabling lines has been proposed on West of
the proposed DN LL (VR - DRD) and length of proposed sidings are as follows;
Proposed Clear Loop is of 737 m from Derailing Switch at CH. 60.892
Km and Turnout point at CH. 61.629 Km.
Proposed Stabling Siding is of 670 m CSR and feasible to stable two 15
car EMU rakes.
ii. CURVATURES:
On Virar – Vaitarna section 14 curves are proposed on two lines (DN LL & UP LL) and
the Maximum curvature proposed is 1° (1750 m radius). The Curve data is as
follows;
iii. bridges:
There are 3 Minor Bridges and 4 Major Bridges on Virar – Vaitarna section and the
details are as follows;
Minor Bridges:
Sr. Bridge
Section Location Span
No. No.
1 84 VR - VTN 60/4-5 1x4.80
2 85 VR – VTN 60/22-24 1 X3.10
3 86 VR - VTN 61/4-6 1x3.035
Extension of above bridges to accommodate the proposed DN LL & UP LL are
required .
Major Bridges:
Sr. Between Bride Location Span Remarks
No. stations No.
1 VR – VTN 87 63/8-10 2 X 3.78 Narangi Bridge.
1 X 8.69
2 VR – VTN 88 65/10-12 2 x 8.87 Shirgam Bridge.
3 x 8.95
3 VR – VTN 90 66/22 – 24 3 x 8.80 Dahisar Bridge.
1 x 8.78
1 x 8.81
1 x 8.85
1 x 9.09
4 VR – VTN 91 67/18-20 2 x 8.70 Kasrali Bridge.
3 x 8.79
Construction of new Bridge is required at the above locations.
iv. LEVEL CROSSINGS:
Level crossing No. 41 exist at 61/18 -20 (CH. 61.861 Km) on VR –VTN section. One
ROB is under construction at North End of Island Platform No. 6 & 7 in lieu of
dismantled Level Crossing existing at that location. To eliminate this level crossing
new ROB is required to be constructed.
v. DEDICATED FRIEGHT CORRIDOR ALIGNMENT:
Dedicated Freight Corridor alignment joins to the existing VR – DRD section on East
side of existing track between at Km 65.87 in VR-VTN section.
vi. REQUIRED MODIFICATION/ALTERATION AT VAITARNA:
As per Western Railway Working Time Table No. 87 effective from 1 st July 2012,
Vaitarna station is at 68.42 Km from Churchgate. The station Building is located at
CH. 68.276 and side Platforms exist on DN & UP Main Lines.
(VR End) to have overall length of Platform as 330 m. West side of Platform
is proposed as Platform No. 2 for UP LL and East side of Platform as
Platform No. 3 for DN main Line.
Modification to existing Platform No. 2: Existing side Platform No. 2 is of
307 m long and is 7 m wide. It is proposed to extend towards South End
(VR End) to have overall length of Platform as 330 m.
Foot Over Bridge: One FOB is located at south end of Platform with landing to
Platform No. 1 & 2 and to east side. FOB is required to be extended towards new
proposed side platform on west side.
Yard remodelling: No yard remodelling is proposed.
On Vaitarna – Saphale section 9 curves are proposed on two lines (DN LL & UP LL)
and the Maximum curvature proposed is 0.88° (2000 m radius). The Curve data is as
follows;
ii. bridges:
There are 3 Minor Bridges, 4 Major Bridges and 2 Important Bridges on Vaitarna –
Saphale section and the details are as follows;
MINOR BRIDGES:
Sr. Bridge
Section Location Span
No. No.
1 95 VTN - SAH 71/30-32 1X2.89
2 96 VTN - SAH 72/22-24 2x6.10
3 97 VTN - SAH 73/4-6 1x6.10
4 100 VTN - SAH 74/30-75/2 2x2.43
5 101 VTN - SAH 75/22-24 1x2.44
6 102 VTN - SAH 76/6-8 1x3.05
Dedicated Freight Corridor alignment continued parallel to the existing lines on East
side between VTN – SAH section.
vi. REQUIRED MODIFICATION/ALTERATION AT SAPHALE:
As per Western Railway Working Time Table No. 87 effective from 1 st July 2012,
Saphale station is at 76.74 Km from Churchgate. Two side Platforms exist on DN &
UP Main Lines. Platform No. 1 on DN ML is 295 m & Platform No. 2 on UP ML is 275
m and can cater for 12 car EMU rakes.
FOOT OVER BRIDGE: One FOB is existing connecting at both the Platforms at 96
m from South End of Platform No. 1. The column of this FOB on existing Platform No.
1 is to be relocated along with the landing and required to be extended towards West
to proposed new Platform No. 1.
STATION BUILDING & OTHER STRUCTRES: Station building is located on East
side of the existing Platform No. 2 and no relocation is required for the proposed
quadrupling of lines.
Temporary waiting shed of 85 m² & one temporary shed of 13 m² on existing
Platform No.1 is to be dismantled & relocated.
Well of 9.3 m Ø is located at 20 m from FOB landing on west side of Platform No. 1.
This is required to be closed.
Bridge No. 109 of 3.05 m span at Km 79/6-8 exists on the platform length and is
required to be extended towards west as box culvert for construction of new
platform.
vii. LAND ACQUISITION: Land acquisition required for quadrupling between Vaitarna
- Saphale sections is as follows;
Sr. SECTION LOCATION LENGTH AREA TO BE VILLAGE
No. (Km) (m) ACQUIURED
FROM TO (m²)
1 VTN – SAH 74.700 75.350 650 6500 KARWALA
Wadhiv & Sartodi has been identified between Vaitarna and Saphale stations for
construction of new station on the VR-DRD suburban corridor. Proposed alignment
shall facilitate construction of new station without any track realignment in future.
WADHIV:
Wadiv is located between South Vaitarna River and North Vaitarna River. The
proposed station is at CH. 9.950 Km from VR.
SARTODI:
Sartodi is located 1.5 Km ahead of Saphale station. The proposed station is at
CH. 14.600 Km from VR.
Kelve Road South End: Interconnectivity to existing two tracks has been proposed at
South End for DN TH to DN LL and UP LL to UP TH. 1 IN 12 turnouts are proposed for
this interconnectivity.
ii. curvatures:
On Saphale to Kelve Road section 4 curves are proposed on two lines (DN LL & UP LL)
and the Maximum curvature proposed is 0.88° (2000 m radius). Details curve are as
follows;
Sr. CHAINAGE RADIUS DEGREE DIRECTION TRANSITION CURVE TOTAL
No. CCG (M) LENGTH LENGTH CURVE
FROM TO IN OUT (M) LENGTH
1 77673.00 80787.24 5120 0.34 RIGHT 25 25 3064.24 3114.24
2 81774.11 81922.30 2000 0.88 LEFT 55 55 38.20 148.20
3 81964.86 82107.34 2000 0.88 RIGHT 55 55 32.48 142.48
4 82541.56 82669.32 2500 0.70 RIGHT 50 50 27.76 127.76
iii. bridges:
There are 13 Minor Bridges and 1 Major Bridges on Virar – Vaitarna section and the
details are as follows;
MINOR BRIDGES:
Sr. Bridge
Section Location Span
No. No.
1 103 SAH - KLV 76/22-24 1x4.56
2 103A SAH - KLV 77/2-4 1x0.23
3 104 SAH - KLV 77/8-10 1x1.68
4 105 SAH - KLV 77/18-20 1x0.46
5 106 SAH - KLV 77/24-26 6x0.90
6 107 SAH - KLV 78/6-8 3x0.90
7 108 SAH - KLV 78/24-26 1X1.68
8 109 SAH - KLV 79/6-8 1x3.05
9 110 SAH - KLV 79/20-22 2X2.97
10 111 SAH - KLV 80/6-8 1X3.05
11 112 SAH - KLV 80/20-22 1x6.02
12 113 SAH - KLV 80/30-81/2 1x1.83
13 114 SAH - KLV 81/10-12 1x3.05
Dedicated Freight Corridor alignment continued parallel to the existing lines on East
side between SAH – KLV section.
vi. REQUIRED MODIFICATION/ALTERATION AT KELVE ROAD:
As per Western Railway Working Time Table No. 87 effective from 1 st July 2012, Kelve
Road station is at 82.55 Km from Churchgate.
Makunsar has been identified between Saphale & Kelve Road stations for
construction of new station on the VR-DRD suburban corridor. Proposed alignment
shall facilitate construction of new station without any track realignment in future.
The proposed alignment on West side after Kelve Road shall infringe the existing
North Dead End Track from Point No. 113 on DN & UP Common Loop. Thus it is
proposed to dismantle the crossover Point No. 113 & Pt No. 114 on DN ML and
relocate at 73 m ahead (Towards VR End).
Dead End on North Dead End Track to be shifted towards South by 158 m and track
of 158 m to be dismantled. The length of track from the relocated SRJ of Point No.
113 to the relocated Dead End is 146m.
ii. CURVATURES:
On Kelve Road to Palghar section 16 curves are proposed on two lines (DN LL & UP
LL) and the Maximum curvature proposed is 1° (1750 m radius). Details curve are as
follows;
iii. bridges:
There are 10 Minor Bridges and 2 Major Bridges on Kelve Road - Palghar section and
the details are as follows;
MINOR BRIDGES:
Sr. Bridge
Section Location Span
No. No.
1 116 KLV-PLG 82/18-20 1x3.05
2 117 KLV-PLG 83/8-10 1x0.45
3 118 KLV-PLG 83/12-14 1x6.10
4 120 KLV-PLG 84/28-30 1x1.83
5 121 KLV-PLG 85/14-16 1x6.02
6 122 KLV-PLG 85/30-86/2 1x3.05
7 123 KLV-PLG 86/22-24 1x3.05
8 124 KLV-PLG 87/2-4 1x0.61
9 124A KLV-PLG 87/26-28 1X0.46
10 126 KLV-PLG 88/24-26 3x5.48
Extension of above bridges to accommodate the proposed DN LL & UP LL is required
and proposed.
MAJOR BRIDGES:
Sr. Between Bride Location Span Remarks
No. stations No.
1 KLV - PLG 119 83/32 – 84/2 4 x 9.14
2 KLV - PLG 125 88/2-4 1 x 18.29
Construction of new Bridge is required at the above location.
iv. LEVEL CROSSINGS:
There are Three Level Crossing Gates No. 45, 46 & 46 A between Kelve Road –
Palghar section. The details are as follows;
1. Level Crossing Gate No. 45: Located at Km. 84.640 (84/18-20) & DFCIL has
proposed RUB at this location for Dedicated Freight Corridor.
2. Level Crossing Gate No. 46: Located at Km. 87.379 (87/12 – 14) & DFCIL has
proposed RUB at this location for Dedicated Freight Corridor.
3. Level Crossing Gate No. 46A: Located at Km. 90.211 (90/2 – 4) & DFCIL has
proposed ROB at this location for Dedicated Freight Corridor.
DFCIL authorities need to be approached to keep additional space/length under
proposed ROB/RUB to accommodate two tracks of new lines between Virar to
Dahanu Road while preparing/approving GADs.
v. DEDICATED FRIEGHT CORRIDOR ALIGNMENT:
Dedicated Freight Corridor alignment continued parallel to the existing lines on East
side between KLV – PLG section.
viii. REQUIRED MODIFICATION/ALTERATION AT PALGHAR:
As per Western Railway Working Time Table No. 87 effective from 1 st July 2012,
Palghar station is at 90.92 Km from Churchgate.
FOOT OVER BRIDGE: There are Two FOBs connecting East to Platforms.
Modifications required/proposed are as follows;
1. South End FOB: Located at 58 m from south End of Platform No. 1, connecting
to Island Platform No. 2 / 3 and further extended to east side with landing. FOB
column & landing existing on Platform No. 1 is required to be dismantled &
relocated to adhere with SOD stipulation. This FOB is required to be further
extended towards West side with landing on proposed new Platform.
2. North End FOB: Located at 212 m from south End of Platform No. 1, connecting
to Island Platform No. 2 / 3 and further extended to east side with landing. FOB
column & landing existing on Platform No. 1 is required to be dismantled &
relocated to adhere with SOD stipulation. This FOB is required to be further
extended towards West side with landing on proposed new Platform.
STATION BUILDING & OTHER STRUCTRES: Station building is located on
West side of the existing Platform No. 1 and dismantling & relocation is required for
the proposed quadrupling of lines.
In addition to this, 40 structures located o west side requires dismantling &
relocation. This includes, 29 quarters, 3 Toilets, Booking Office, RPF office, 2
Temples, 2 Pumprooms and 2 stalls on Platform No.1.
vii. Yard Remodelling:
ii. CURVATURES:
On Palghar to Umroli section 11 curves are proposed on two lines (DN LL & UP LL)
and the Maximum curvature proposed is 0.88° (2000 m radius). Details curve are as
follows;
Sr. CHAINAGE RADIUS DEGREE DIRECTION TRANSITION CURVE TOTAL
No. CCG (M) LENGTH LENGTH CURVE
FROM TO IN OUT (M) LENGTH
1 91097.74 91229.91 2500 0.70 RIGHT 50 50 22.17 122.17
2 91255.35 91394.53 2000 0.88 LEFT 55 55 29.18 139.18
3 92593.50 92736.80 2000 0.88 LEFT 55 55 33.30 143.30
4 92785.29 92928.96 2000 0.88 RIGHT 55 55 33.67 143.67
5 93273.23 93417.24 2000 0.88 RIGHT 55 55 34.01 144.01
6 93468.18 93612.05 2000 0.88 LEFT 55 55 33.87 143.87
7 94378.75 94518.70 2000 0.88 LEFT 55 55 29.95 139.95
8 94551.24 94684.51 2000 0.88 RIGHT 55 55 23.27 133.27
9 94820.60 94967.12 2000 0.88 RIGHT 55 55 36.53 146.53
10 95032.73 95171.84 2250 0.78 LEFT 55 55 29.11 139.11
11 95570.91 96945.24 5125 0.34 RIGHT 25 25 1324.33 1374.33
iii. bridges:
There are 9 Minor Bridges and 2 Major Bridges on Palghar Umroi section and the
details are as follows;
MINOR BRIDGES:
Sr. Bridge
Section Location Span
No. No.
1 129 PLG-UOI 91/26-28 1X1.68
2 130 PLG-UOI 92/6-8 1X1.83
3 131 PLG-UOI 92/14-16 1X1.51
4 132 PLG-UOI 93/2-4 1X3.05
Sr. Bridge
Section Location Span
No. No.
5 133 PLG-UOI 93/16-18 2x5.99
6 134 PLG-UOI 93/22-24 1x3.02
7 137 PLG-UOI 94/30-0 1X3.05
8 138 PLG-BOR 96/6-8 1X3.00
9 139 PLG-BOR 96/16-18 3x5.33
Extension of above bridges to accommodate the proposed DN LL & UP LL is
required.
MAJOR BRIDGES:
Level Crossing Gates No. 48 is located at Km. 95.246 (95/8-10) and DFCIL has
proposed ROB at this location for Dedicated Freight Corridor. DFCIL authorities
need to be approached to keep additional space under proposed ROB to
accommodate two tracks of new lines between Virar to Dahanu Road while
preparing/approving GADs.
v. DEDICATED FRIEGHT CORRIDOR ALIGNMENT:
Dedicated Freight Corridor alignment continued parallel to the existing lines on East
side between PLG – UOI section.
vi. REQUIRED MODIFICATION/ALTERATION AT UMROLI:
As per Western Railway Working Time Table No. 87 effective from 1 st July 2012,
Umroli station is at 97.15 Km from Churchgate.
FOOT OVER BRIDGE: One FOBs connecting existing Platforms 1 & 2 is located at
194 m from south end of Platform No. 1. FOB is required to be further extended
towards West side with landing on proposed new Platform.
STATION BUILDING & OTHER STRUCTRES: Station building, booking office
cum waiting room and toilet are located on west side are to be dismantled &
relocated.
Yard Remodelling:
No interconnectivity has been proposed with the existing lines at Umroli and no
yard modification/remodelling required.
KARALE ROAD has been identified between Palghar & Umroli stations for
construction of new station on the VR-DRD suburban corridor. Proposed alignment
shall facilitate construction of new station without any track realignment in future.
The location is 33.254 Km from Virar.
On Umroli to Boisar section 9 curves are on proposed two lines (DN LL & UP LL) and
the Maximum curvature proposed is 0.88° (2000 m radius). Details curve are as
follows;
Sr. CHAINAGE RADIUS DEGREE DIRECTION TRANSITION CURVE TOTAL
No. CCG (M) LENGTH LENGTH CURVE
FROM TO IN OUT (M) LENGTH
1 97647.37 97779.62 3500 0.5 RIGHT 30 30 72.25 132.25
2 97831.99 97970.67 2250 0.78 LEFT 55 55 28.68 138.68
3 98329.64 98474.93 2000 0.88 LEFT 55 55 35.29 145.29
4 98522.43 98668.32 2000 0.88 RIGHT 55 55 35.89 145.89
5 99084.56 99176.97 5000 0.35 LEFT 25 25 42.41 92.41
6 99219.66 99309.51 4500 0.39 RIGHT 30 30 29.85 89.85
7 101235.15 101340.21 3500 0.50 LEFT 30 30 45.05 105.05
8 102073.39 102168.42 3500 0.50 LEFT 30 30 35.04 95.04
9 102544.54 102668.89 3500 0.5 RIGHT 30 30 64.35 124.35
ii. bridges:
There are 9 Minor Bridges and 2 Major Bridges on Umroli – Boisar section and the
details are as follows;
MINOR BRIDGES:
Sr. Bridge
Section Location Span
No. No.
1 140 UOI-BOR 97/4-6 1X0.76
2 144A UOI-BOR 100/18-20 1x3.05
3 145A UOI-BOR 101/6-8 1x0.23
4 145B UOI-BOR 101/18-20 1x0.30
5 145C UOI-BOR 102/6-8 1x0.53
Extension of above bridges to accommodate the proposed DN LL & UP LL is required
and proposed.
MAJOR BRIDGES:
Sr. Between Bride Location Span Remarks
No. stations No.
1 UOI-BOR 143 99.375 1 x 18.29
2 UOI-BOR 144 99.813 3 x 12.80
Construction of new Bridge is required at the above location.
There is Two Level Crossing Gates No. 49 & 50 between Umroli – Boisar section. The
details are as follows;
1. Level Crossing Gate No. 49: Located at Km. 97.618 (97/18-20) & DFCIL has
proposed RUB at this location for Dedicated Freight Corridor.
2. Level Crossing Gate No. 50: Located at Km. 99.003 (98/30 – 99/2) & DFCIL has
proposed RUB at this location for Dedicated Freight Corridor.
DFCIL authorities need to be approached to keep additional space under proposed
ROB to accommodate two tracks of new lines between Virar to Dahanu Road while
preparing/approving GADs.
iv. DEDICATED FRIEGHT CORRIDOR ALIGNMENT:
Dedicated Freight Corridor alignment continued parallel to the existing lines on East
side between UOI – BOR section.
v. REQUIRED MODIFICATION/ALTERATION AT boisar:
As per Western Railway Working Time Table No. 87 effective from 1 st July 2012,
Boisar station is at 102.86 Km from Churchgate.
PLATFORM MODIFICATIONS: The proposed new corridor at Boisar is on West
side of “UP Common Loop DN” Line. Proposed construction of new Platform and
modifications of existing Platforms are as detailed below;
The details of Platforms are as follows;
Platform No. 1: 341 m long Platform on UP Common Loop DN Line
Island Platform No. 2 & 3: 562 m Long. Platform No. 2 on DN Main Line &
Platform No. 3 on DN Main Line
FOOT OVER BRIDGE: There are two FOBs at Boisar and the details &
modification required are as follows;
1. FOB at South End: FOB is located at 227 m from South End connecting existing
Island Platforms 2 & 3 with west side with ramp on Goods shed Platform. It is
proposed to provide Ramp of 48 m from this FOB to south end of existing
Platform No. 1 after widening and making Island Platform.
2. 2nd FOB: FOB is located at 110 m from South End of existing Platform No. 1. This
FOB connects Island Platform No. 2 & 3 with East side and west side on Platform
No. 1. This FOB is required to be further extended towards West side with
landing on proposed new Platform and also the existing column & landing on
Platform No. 1 to be relocated.
STATION BUILDING & OTHER STRUCTRES: Following structures located on
Platform No. 1 are required to be dismantled & relocated.
Station Building
Ticket Office
SPM & IPS room
Waiting Room
Toilet
One store room of 4.5 m x 2.75 m
Railway quarter on west side of Platform No.1
Good shed Platform
Yard Remodelling:
Good shed line and good shed located at South End of Boisar station, is required to
be dismantled due to the proposed two lines alignment on west side of “UP
Common Loop DN” line. The existing connectivity to the good shed line is proposed
for dismantling. New Goods Shed is proposed at south end of ROB at Km. 100.773.
Interconnectivity with existing main lines provided at South End for facilitating the
movements of DN LL to DN ML & UP ML to UP LL.
At North End one siding line takes off from “UP Common Loop DN” line for Atomic
Thermal Plant, which is not in use. This connectivity is required to be dismantled.
NEW GOODS SHED FACILITY:
Due to proposed Good shed at South End of Boisar station, new goods shed with 2
new lines, is proposed on West side at south end of ROB at Km. 100.773. Proposed
length of proposed Goods Shed Lines are; Line 1: 785 M & Line No. 2 853 m.
PANCHALI has been identified between Umroli & Boisar stations for construction
of new station on the VR-DRD suburban corridor. Proposed alignment shall facilitate
construction of new station without any track realignment in future. The location is
39.000 Km from Virar.
On Boisar to Vangaon section 8 curves are on proposed two lines (DN LL & UP LL) and
the Maximum curvature proposed is 0.88° (2000 m radius). Details curve are as
follows;
ii. bridges:
There are 14 Minor Bridges on Boisar – Vangaon section and the details are as
follows;
MINOR BRIDGES:
Sr. Bridge
Section Location Span
No. No.
1 146 BOR- VGN 102/14-16 1X0.30
2 147 BOR- VGN 102/24-26 1X0.30
3 147A BOR- VGN 102/28-30 1x0.23
4 148 BOR- VGN 102/30-32 1x0.30
5 149 BOR- VGN 103/10-12 1x0.30
6 150 BOR- VGN 103/18-20 1x2.3
7 151 BOR- VGN 105/2-4 1x2.3
8 152 BOR- VGN 105/18-20 1x6.10
9 153 BOR- VGN 106/6-8 1x1.70
10 155 BOR- VGN 108/2-4 1x4.57
11 157 BOR- VGN 109/4-6 2x2.33
12 158 BOR- VGN 109/26-28 1x3.05
13 160 BOR- VGN 110/6-8 1x2.64
14 160A BOR- VGN 110/10-12 1x0.23
There is Four Level Crossing Gates No. 52, 53, 54 & 54 between Boisar – Vangoan
section. The details are as follows;
1. Level Crossing Gate No. 52: Located at Km. 102.628 (102/22 – 24) & DFCIL has
proposed ROB at this location for Dedicated Freight Corridor.
2. Level Crossing Gate No. 53: Located at Km. 105.141 (105/4 – 6) & DFCIL has
proposed RUB at this location for Dedicated Freight Corridor.
3. Level Crossing Gate No. 54: Located at Km. 107.520 (107/16 – 18) & DFCIL has
proposed RUB at this location for Dedicated Freight Corridor.
4. Level Crossing Gate No. 55: Located at Km. 110.545 (110/14 – 16) & DFCIL has
proposed ROB at this location for Dedicated Freight Corridor.
DFCIL authorities need to be approached to keep additional space/length under
proposed ROB/RUB to accommodate two tracks of new lines between Virar to
Dahanu Road while preparing/approving GADs.
iv. DEDICATED FRIEGHT CORRIDOR ALIGNMENT:
Dedicated Freight Corridor alignment continued parallel to the existing lines on East
side between BOR - VGN section.
v. REQUIRED MODIFICATION/ALTERATION AT VANGAON:
As per Western Railway Working Time Table No. 87 effective from 1 st July 2012,
Vangaon station is at 111.58 Km from Churchgate.
PLATFORM MODIFICATIONS: The proposed track at Vangoan is on West side
DN ML Line. Proposed construction of new Platform and modifications of existing
Platforms are as detailed below;
The details of Platforms are as follows;
Platform No. 1: 278 m long Platform on DN Main Line
Island Platform No. 2 & 3: 420 m Long. Platform No. 2 on “UP Common Loop
DN” Line & Platform No. 3 on UP Main Line
Temple
Yard Remodelling:
Interconnectivity with existing main lines are not proposed at Vangaon and no yard
modification proposed.
vi. LAND ACQUISITION: Land
On Vangaon – Dahanu Road section 17 curves are on proposed two lines (DN LL & UP
LL) and the Maximum curvature proposed is 0.88° (2000 m radius). Details curve are
as follows;
Sr. CHAINAGE RADIUS DEGREE DIRECTION TRANSITION CURVE TOTAL
No. CCG (M) LENGTH LENGTH CURVE
FROM TO IN OUT (M) LENGTH
1 111996.07 112066.02 7000 0.25 LEFT 15 15 39.96 69.96
2 112300.01 112394.24 4000 0.44 RIGHT 30 30 34.23 94.23
3 112463.30 112602.37 2500 0.70 RIGHT 50 50 39.07 139.07
4 112660.24 112906.87 2500 0.70 LEFT 50 50 46.62 146.62
5 113811.43 113959.52 2000 0.88 LEFT 55 55 38.09 148.09
6 113999.94 114149.99 2000 0.88 RIGHT 55 55 40.05 150.05
7 114191.12 114327.93 2000 0.88 RIGHT 55 55 26.81 136.81
8 114393.65 114534.80 2000 0.88 LEFT 55 55 31.15 141.15
9 115379.52 116399.20 3500 0.5 LEFT 30 30 959.68 1019.68
10 118043.83 118186.34 2000 0.88 LEFT 55 55 32.51 142.51
11 118230.80 118389.19 2000 0.88 RIGHT 55 55 40.40 158.40
12 118460.53 118599.98 2500 0.70 RIGHT 50 50 39.45 139.45
13 118640.41 118796.14 2500 0.70 LEFT 50 50 56.01 156.01
14 120509.29 120653.50 2000 0.88 LEFT 55 55 34.21 144.21
15 120699.09 120843.99 2000 0.88 RIGHT 55 55 34.90 144.90
16 121019.90 121097.13 5000 0.35 RIGHT 25 25 27.22 77.22
17 121687.76 121774.35 3500 0.50 RIGHT 25 25 36.59 86.59
ii. bridges:
There are 14 Minor Bridges on Boisar – Vangaon section and the details are as
follows;
MINOR BRIDGES:
Sr. Bridge
Section Location Span
No. No.
1 164 VGN-DRD 115/14-16 1x9.15
2 167 VGN-DRD 119/8-10 1x1.78
3
168
VGN-DRD 119/20-22 1x0.71
4 172 VGN-DRD 123/14-16 1x3.05
Proposed quadrupling is being terminated at Km. 121.556, Bridge No. 172 located
123/14 – 16 is not included for extension/rebuilding. Other 3 Minor bridges are
required to be extended to accommodate the proposed DN LL & UP LL is required
and proposed.
MAJOR BRIDGES:
Sr. Between Bride Location Span Remarks
No. stations No.
1 VGN – DRD 161 111/38- 112/2 2 x 6.09
2 VGN – DRD 163 113/22-26 3 x 18.29
3 VGN – DRD 166 118/2-4 3 x 18.29
4 VGN – DRD 169 120/16-20 6 x 18.29
Construction of new Bridge is required at the above location.
iii. LEVEL CROSSINGS:
Level Crossing Gates No. 55 is located at Km. 120.148 (120/1 – 3) between Vangoan –
Dahanu Road section. No proposal for construction of ROB/RUB in lieu of level
crossing made by DFCIL as the proposed alignment of DFC is parallel to existing lines
up to Km. 118.20 after that takes off towards east. As per Policy new ROB is proposed
in lieu of this level crossing No. 55.
iv. DEDICATED FRIEGHT CORRIDOR ALIGNMENT:
Dedicated Freight Corridor alignment continued parallel to the existing lines on East
side between VNG - DRD section up to Km. 118.20 and further it takes off towards
east.
v. REQUIRED MODIFICATION/ALTERATION AT DAHANU ROAD:
As per Western Railway Working Time Table No. 87 effective from 1 st July 2012,
Dahanu Road station is at 123.78 Km from Churchgate.
i. At Dahanu Road station EMU Island Platform No. 4/5 exist at East side, where
as the alignment of proposed track is on west side from Virar to Dahanu Road.
ii. South End of Dahanu Road station following loop lines exists on either side of
Main Lines;
On West side of DN ML:
1. Goods siding (98 m clear)
2. Common Goods Loop Line No. 1 (CSR 686 m)
3. Up – Down Goods Loop Line No. 2 (CSR 717 m)
On East side of UP ML:
1. Up – Down Goods Loop Line No. 3 (CSR 869 M)
2. Up – Down Goods Loop Line No. 4 (CSR 686 M)
3. Up – Down Goods Loop Line No. 5 (CSR 686 M) with Goods
Platform on East.
If the lines are taken ahead of the take off point to Reliance Energy Siding, 2 Up
– Down Goods Loop lines have to be dismantled. In addition complete yard
remodelling of required along with relocation of take off points to siding.
iii. Existing Platforms at Dahanu Road station are as follows;
Platform No. 1: Side Platform (589 M) on DN Main Line and Station building
& other structures located on Platform required to be dismantled &
relocated.
Island Platform No. 2/3: West side is Platform No. 2 (599 M) on UP ML and
East side Platform No. 3 (557 m) on Up & DN Loop Line.
Island Platform No. 4/5: This Island Platform (285 m) is being utilised for
terminating/originating the MEMU services at Dahanu Road. West side is
Platform No. 4 on Running Line No. 5 Common Loop. East side is Platform
No. 5 on Running Line No. 6 Common Loop.
Interconnectivity with existing main lines are proposed to facilitate the movement
to Island Platform No. 4/5 by insertion of 8 sets of 1 in 12 layouts ahead of the
taking off points to Reliance Energy sidings.
v. LAND ACQUISITION:
BSES COLONY has been identified between Vangoan – Dahanu Road stations for
construction of new station on the VR-DRD suburban corridor. Proposed alignment
shall facilitate construction of new station without any track realignment in future.
The location is 61.100 Km from Virar.
Stabling Siding No. 2: 533 m CSR – feasible to stable 1 Rake of 15 Car EMU. (Feasible to
stable 2 rakes of 12 Car EMU rakes)
Stabling Siding No. 3: 533 m CSR – feasible to stable 1 Rake of 15 Car EMU. (Feasible to
stable 2 rakes of 12 Car EMU rakes)