Beruflich Dokumente
Kultur Dokumente
PROJECT : BALANCE WORK MAKE UP WATER & DRINKING WATER SYSTEM FOR 7
MTPA EXPANSION STEEL AUTHORITY OF INDIA LIMITED BHILAI STEEL PLANT ( BSP )
BHILAI_Pkg.078A
15.01.18
15.01.18
P1 P3
X
3x 1x X 2x
Factored Factored Factored
P1x P2x P3x BM1x BM2x SF3x Load
Node Load Combination 2 2 2
BM1x BM2x SF3x
(T/m ) (T/m ) (T/m ) (T-m) (T-m) (T) Factor
(T-m) (T-m) (T)
1 All 4.41 4.41 4.41 0.13 0.13 0.21 1.5 0.20 0.20 0.32
2
Design punching shear stress = (6x10000/1.0998/10^6)= 0.055 N/mm
2
P1z = pressure at face of pedestal at section 1z-1z in T/m
2 3x 1x 2x
P2z = pressure at face of pedestal at section 2z-2z in T/m
2
P3z = pressure at a distance d from face of pedestal at section 3z-3z in T/m
BM1z = Moment at face of pedestal at section 1z-1z in T-m/m
BM2z = Moment at face of pedestal at section 2z-2z in T-m/m 3z 3z
SF3z = Oneway shear at a distance d from face of pedestal at section 3z-3z in T/m
1z 1z Z
2z 2z
3x 1x X 2x
2
Design punching shear stress = (6x10000/1.036/10^6)= 0.058 N/mm
Minimum eccentricity,
ex = l/500+B/30 = 87 mm, Mux = 0.78 T-m
ey = l/500+D/30 = 26.00 mm, Muy = 0.23 T-m
Pu/fckBD = 0.00563
From Chart 83 of SP16,
Mu/fckBD = 0.01
Muz = 4.7925 T-m
Calculation of Puz
Puz = 0.45fckAc + 0.75fyAs = 753.74 T
Pu/Puz = 0.01194 ɲn = 1
So, (Mx/Mux)^ɲn+(Mz/Muz)^ɲn = 0.0718 ok
Provide 24Nos 10ƷT Asc = 1884 mm2
ok
Check for shear
Vu/bd = 1.5x0x10^4/(2130x245) = 0 N/mm2
Percentage of reinforcement provided = 0.07% (in one direction)
Allowable shear stress = 0.15 N/mm2 , From Table 61 of SP16
Design shear = -78277.5 N Minimum shear reinforcement required
Spacing of shear reinforcement considered = 200 mm
Shear reinforcement required = -119.97 mm2
Minimum shear reinforcement = 0.4x2130x200/(0.87x500)= 391.72 mm2
Provide 8 legged 8ƷT @200C/C (Asv provided = 401.92 mm2)
ok
Result
24 Nos. 10ƷT +
8 legged 8ƷT @200C/C
DESIGN OF FOUNDATION MARKED PD2
P1 P3
X
3x 1x X 2x
Factored Factored Factored
P1x P2x P3x BM1x BM2x SF3x Load
Node Load Combination 2 2 2
BM1x BM2x SF3x
(T/m ) (T/m ) (T/m ) (T-m) (T-m) (T) Factor
(T-m) (T-m) (T)
1 All 1.92 1.92 1.92 0.05 0.05 0.09 1.5 0.08 0.08 0.13
2
Design punching shear stress = (0.5x10000/0.6552/10^6)= 0.008 N/mm
2
P1z = pressure at face of pedestal at section 1z-1z in T/m
2 3x 1x 2x
P2z = pressure at face of pedestal at section 2z-2z in T/m
2
P3z = pressure at a distance d from face of pedestal at section 3z-3z in T/m
BM1z = Moment at face of pedestal at section 1z-1z in T-m/m
BM2z = Moment at face of pedestal at section 2z-2z in T-m/m 3z 3z
SF3z = Oneway shear at a distance d from face of pedestal at section 3z-3z in T/m
1z 1z Z
2z 2z
3x 1x X 2x
2
Design punching shear stress = (0.5x10000/0.6142/10^6)= 0.008 N/mm
Minimum eccentricity,
ex = l/500+B/30 = 49 mm, Mux = 0.07 T-m
ey = l/500+D/30 = 26.00 mm, Muy = 0.04 T-m
Pu/fckBD = 0.00199
From Chart 83 of SP16,
Mu/fckBD = 0.01
Muz = 2.2275 T-m
Calculation of Puz
Puz = 0.45fckAc + 0.75fyAs = 350.33 T
Pu/Puz = 0.004207 ɲn = 1
So, (Mx/Mux)^ɲn+(Mz/Muz)^ɲn = 0.027 ok
Provide 16Nos 10ƷT Asc = 1256 mm2
ok
Check for shear
Vu/bd = 1.5x0x10^4/(990x245) = 0 N/mm2
Percentage of reinforcement provided = 0.11% (in one direction)
Allowable shear stress = 0.15 N/mm2 , From Table 61 of SP16
Design shear = -36382.5 N Minimum shear reinforcement required
Spacing of shear reinforcement considered = 200 mm
Shear reinforcement required = -55.759 mm2
Minimum shear reinforcement = 0.4x990x200/(0.87x500)= 182.07 mm2
Provide 4 legged 8ƷT @200C/C (Asv provided = 200.96 mm2)
ok
Result
16 Nos. 10ƷT +
4 legged 8ƷT @200C/C
DESIGN OF FOUNDATION MARKED PD3
P1 P3
X
3x 1x X 2x
Factored Factored Factored
P1x P2x P3x BM1x BM2x SF3x Load
Node Load Combination 2 2 2
BM1x BM2x SF3x
(T/m ) (T/m ) (T/m ) (T-m) (T-m) (T) Factor
(T-m) (T-m) (T)
1 All 3.91 3.91 3.91 0.12 0.12 0.19 1.5 0.18 0.18 0.28
2
Design punching shear stress = (6x10000/1.3221/10^6)= 0.045 N/mm
2
P1z = pressure at face of pedestal at section 1z-1z in T/m
2 3x 1x 2x
P2z = pressure at face of pedestal at section 2z-2z in T/m
2
P3z = pressure at a distance d from face of pedestal at section 3z-3z in T/m
BM1z = Moment at face of pedestal at section 1z-1z in T-m/m
BM2z = Moment at face of pedestal at section 2z-2z in T-m/m 3z 3z
SF3z = Oneway shear at a distance d from face of pedestal at section 3z-3z in T/m
1z 1z Z
2z 2z
3x 1x X 2x
2
Design punching shear stress = (6x10000/1.2469/10^6)= 0.048 N/mm
Minimum eccentricity,
ex = l/500+B/30 = 106 mm, Mux = 0.95 T-m
ey = l/500+D/30 = 26.00 mm, Muy = 0.23 T-m
Pu/fckBD = 0.00444
From Chart 83 of SP16,
Mu/fckBD = 0.01
Muz = 6.075 T-m
Calculation of Puz
Puz = 0.45fckAc + 0.75fyAs = 955.45 T
Pu/Puz = 0.00942 ɲn = 1
So, (Mx/Mux)^ɲn+(Mz/Muz)^ɲn = 0.056 ok
Provide 28Nos 10ƷT Asc = 2198 mm2
ok
Check for shear
Vu/bd = 1.5x0x10^4/(2700x245) = 0 N/mm2
Percentage of reinforcement provided = 0.07% (in one direction)
Allowable shear stress = 0.15 N/mm2 , From Table 61 of SP16
Design shear = -99225 N Minimum shear reinforcement required
Spacing of shear reinforcement considered = 200 mm
Shear reinforcement required = -152.07 mm2
Minimum shear reinforcement = 0.4x2700x200/(0.87x500)= 496.55 mm2
Provide 10 legged 8ƷT @200C/C (Asv provided = 502.4 mm2)
ok
Result
28 Nos. 10ƷT +
10 legged 8ƷT @200C/C