1.1. To monitor and evaluate the performance of the Regional Office Divisions on the implementation of the Programs and Projects for Basic Education.
SUB TOTAL 6 10 0 0 0 4 0 0 2 0 0 2 0
QAAD ANNUAL IMPLEMENTATION PLAN (AIP3) CY 2014
2.1. To manage Quality Management System to ensure quality education outcomes in the Region and in the schools divisions.
2.2. To quality assure that the systems and processes in the region and schools divisions complied with the standards and guidelines re: establishment, o
QAAD ANNUAL IMPLEMENTATION PLAN (AIP3) CY 2014
2.2.1. Establishment
of Private
Kindergarten, No. of private schools
Validation thru Ocular
Elementary, validated thru ocular
inspection conducted to
Secondary Schools inspection whether they 75 50 10 5 10 5 10
private schools applying for
Curriculum comply with standards to
Kinder/Elem/Sec Curriculum
operate Kinder/Elem/Sec
KRA 3: ASSESSMENT
3.1. To manage the operationalization of the national assessment framework in the region and schools divisions and oversee the regional assessment progr
No. of Room
Supervisors, Room
Examineers and Proctors
Administration of
and members of the 1 1 1
Principal's Test conducted
working committee
served during conduct of
the principla's test
QAAD ANNUAL IMPLEMENTATION PLAN (AIP3) CY 2014
Administration, distribution,
3.1.4. NAT ( Gr. 3, and retrieval of test
No. of national
6; Yr 4), NCAE materials on the conduct 6 6 3 1 1 1
assessment monitored
(June & Nov) PEPT of national assessment
monitored.
OTHER MATTERS
SUB TOTAL 24 24 2 2 2 2 2 2 2 2 2 2 2
No. of personnel
EPSs and staff cleared, performed assigned tasks
cleaned & restored the in clearing, cleaning and 7 7 7
QAAD office restoration of QAAD
office
SUB TOTAL 7 17 9 3 5 0 0 0 0 0 0 0 0
No. of orientation/meeting
Orientation/meeting on the on the roles and functions
roles and functions of the of the RO BAC members,
RO BAC members, BAC BAC secretariate, TWG
secretariate, TWG and and members of the
members of the procurement units and 1 1
procurement units and procurement procedures/
procurement procedures/ processes conducted - 26
processes pax 92 snacks 7 1 lunch
RO 8 Resources conducted/attended = handout/Phil. Govt. on
management procurement
SUB TOTAL 0 13 0 0 3 1 2 2 1 1 1 1 1
QAAD ANNUAL IMPLEMENTATION PLAN (AIP3) CY 2014
Computer ink 40 10 10 10 10
box filer 48 12 12 12 12
Resource Requirements FINANCIAL REQUIREMENT Amount & Sources
uarter 4
Others (INSET,
Othe
MOVs Matls Eqpt Quarter 1 Quarter 2 Quarter 3 Quarter 4 TOTAL Registration,
D rs
Donation, etc.)
ucation.
Meta strips,
RMEA
pentel
results/ Laptop,
1 pens, ink,
Reports, LCD
bond paper,
ACR
etc.
Resource Requirements FINANCIAL REQUIREMENT Amount & Sources
uarter 4
Others (INSET,
Othe
MOVs Matls Eqpt Quarter 1 Quarter 2 Quarter 3 Quarter 4 TOTAL Registration,
D rs
Donation, etc.)
travel
reports,
certificate of 24,500.00 24,500.00
appearance,
travel order
Resource Requirements FINANCIAL REQUIREMENT Amount & Sources
uarter 4
Others (INSET,
Othe
MOVs Matls Eqpt Quarter 1 Quarter 2 Quarter 3 Quarter 4 TOTAL Registration,
D rs
Donation, etc.)
Meta strips,
pentel
Attendance laptop,
pens, ink, 125,000.00 125,000.00
sheet, ACR lcd
bond paper,
etc.
travel
reports,
certificate of 24,500.00 24,500.00 24,500.00 73,500.00
appearance,
travel order
travel
reports,
certificate of 24,500.00 24,500.00 24,500.00 73,500.00
appearance,
travel order
Meta strips,
ACR, training
pentel
reports RM, Laptop,
pens, ink, 71,500.00 71,500.00
attendance LCD
bond paper,
sheet
etc.
travel
reports,
certificate of 24,500.00 24,500.00
appearance,
travel order
Meta strips,
pentel
Attendance laptop,
pens, ink, 125,000.00 125,000.00
sheet, ACR lcd
bond paper,
etc.
Resource Requirements FINANCIAL REQUIREMENT Amount & Sources
uarter 4
Others (INSET,
Othe
MOVs Matls Eqpt Quarter 1 Quarter 2 Quarter 3 Quarter 4 TOTAL Registration,
D rs
Donation, etc.)
Meta strips,
ACR, training
pentel
reports RM, Laptop,
pens, ink, 33,800.00 33,800.00
attendance LCD
bond paper,
sheet
etc.
Meta strips,
ACR, training
pentel
reports RM, Laptop,
pens, ink, 125,000.00 125,000.00
attendance LCD
bond paper,
sheet
etc.
blishment, operation, conversion, separation, integration and management of both public and privates schools/learning centers
Resource Requirements FINANCIAL REQUIREMENT Amount & Sources
uarter 4
Others (INSET,
Othe
MOVs Matls Eqpt Quarter 1 Quarter 2 Quarter 3 Quarter 4 TOTAL Registration,
D rs
Donation, etc.)
List of
applicant
10 schools 5,000.00 5,000.00 5,000.00 5,000.00 20,000.00
processed
GR/GP
List of
applicant
10 73,500.00 73,500.00 73,500.00 73,500.00 294,000.00
schools
inspected
List of
applicant
10 schools 5,000.00 5,000.00 5,000.00 15,000.00
issued
GR/GP
List of
applicant
schools
2,000.00 2,000.00 2,000.00 6,000.00
issued
Government
authority
List of
applicant
73,500.00 73,500.00 73,500.00 220,500.00
schools
inspected
Resource Requirements FINANCIAL REQUIREMENT Amount & Sources
uarter 4
Others (INSET,
Othe
MOVs Matls Eqpt Quarter 1 Quarter 2 Quarter 3 Quarter 4 TOTAL Registration,
D rs
Donation, etc.)
List of
applicant
2,000.00 5,000.00 5,000.00 12,000.00
schools
issued RM
List of
Elementary
Schools 73,500.00 73,500.00
validated for
Level 1
List of Level II
awardees,
Certificate of
recognition,
Broonze/ Silver
Markers
105,000.00 105,000.00
List of Level I
awardees,
Certificate of
recognition,
Broonze/ Silver
Markers
Resource Requirements FINANCIAL REQUIREMENT Amount & Sources
uarter 4
Others (INSET,
Othe
MOVs Matls Eqpt Quarter 1 Quarter 2 Quarter 3 Quarter 4 TOTAL Registration,
D rs
Donation, etc.)
List of
schools with
SBM level 3
Certification
73,500.00 73,500.00 147,000.00
Report/
ACR/pictorial
s
Checklist of
beneficiary
schools from
FAPE, Reg'l 73,500.00 73,500.00 147,000.00
Coordinator
Billing
statement
Resource Requirements FINANCIAL REQUIREMENT Amount & Sources
uarter 4
Others (INSET,
Othe
MOVs Matls Eqpt Quarter 1 Quarter 2 Quarter 3 Quarter 4 TOTAL Registration,
D rs
Donation, etc.)
List of
Principal's
test takers,
Attendance
sheet, List of
Examineers,
proctors, 20,000.00 20,000.00
Supervisors
& working
committees
Attendance
sheet, List of
Examineers,
proctors, 40,000.00 40,000.00
Supervisors
& working
committees
Resource Requirements FINANCIAL REQUIREMENT Amount & Sources
uarter 4
Others (INSET,
Othe
MOVs Matls Eqpt Quarter 1 Quarter 2 Quarter 3 Quarter 4 TOTAL Registration,
D rs
Donation, etc.)
TO, Travel
Report, Cert
24,500.00 24,500.00
of
Appearance
Monitoring
tools, Travel 24,500.00 24,500.00 24,500.00 24,500.00 98,000.00
report
Checklist, list
of recipient
schools for
tarps, cert. of 65,000.00 65,000.00
appearance,
acknowledgem
ent receipt
Minutes of
1 the 73,500.00 73,500.00 147,000.00
meetings,
1 TA reports
Pictorials,
narrative
report
Pictorials,
narrative
report
0 0 0 0 0 0 0 0 0 0 0
Resource Requirements FINANCIAL REQUIREMENT Amount & Sources
uarter 4
Others (INSET,
Othe
MOVs Matls Eqpt Quarter 1 Quarter 2 Quarter 3 Quarter 4 TOTAL Registration,
D rs
Donation, etc.)
Meta
ACR,
strips,
training
pentel Laptop,
reports RM, 17,000.00 17,000.00
pens, ink, LCD
attendance
bond
sheet
paper, etc.
List of
bidders,
1
APP, AIP,
etc.
1 - 0 0 0 17,000.00 0 0 0 17000 0
Resource Requirements FINANCIAL REQUIREMENT Amount & Sources
uarter 4
Others (INSET,
Othe
MOVs Matls Eqpt Quarter 1 Quarter 2 Quarter 3 Quarter 4 TOTAL Registration,
D rs
Donation, etc.)
Expenses:
B&L = 1,200 per
pax
Training Supplies
= 200.00 per pax
Miscellaneous
Expenses = 10%
of the total
amount
Remarks
Remarks
Remarks
Remarks
registration of pax
Remarks
expenses for
travel and hired
vehicle
Remarks
Remarks
Remarks
expenses for
travel and hired
vehicle
Remarks
Remarks
Expenses for
travel and for
Hired vehicles
Remarks
Remarks
Remarks
Remarks
PROJECT PROCUREMENT MANAGEMENT PLAN (PPMP)
CY 2018
END-USER/UNIT: RAMON D. BOTONA
Charged to MOOE
Projects, Programs and Activities (PAPs)
QUANTITY/ ESTIMATED Mode of SCHEDULE/MILESTONE OF ACTIVITIES
CODE GENERAL DESCRIPTION
BUDGET Procurement
SIZE Jan Feb Mar Apr May Jun July Aug Sept Oct Nov Dec
cement 60 sacks 13,800.00 Shopping 60
sand and gravel 9 cubic ft. 10,800.00 Shopping 9
hollow blocks 500 pieces 6,000.00 Shopping 500
corrogated bars, 9mm 30 pieces 3,600.00 Shopping 30
labor 10,260.00 Shopping
Shopping
Shopping
Shopping
Shopping
Shopping
Shopping
Shopping
44,460.00
TOTAL BUDGET:
NOTE: Technical Specifications for each Item/Project being proposed shall be submitted as part of the PPMP
Charged to MOOE
Projects, Programs and Activities (PAPs)
QUANTITY/ ESTIMATED Mode of SCHEDULE/MILESTONE OF ACTIVITIES
CODE GENERAL DESCRIPTION
BUDGET Procurement
SIZE Jan Feb Mar Apr May Jun July Aug Sept Oct Nov Dec
marine plywood, 3/4 3 3,500.00 Shopping 3
stick well 2 400.00 Shopping 3
finishing nails, #2 1 65.00 Shopping 1
common nails, # 1 1/2 1 65.00 Shopping 1
common nails, # 2 1 70.00 Shopping 1
paint brush 1 30.00 Shopping 1
3. Construction of storage cabinet paint 4L 1,000.00 Shopping 1
wood stick, 1x1 2 500.00 Shopping
NOTE: Technical Specifications for each Item/Project being proposed shall be submitted as part of the PPMP
Charged to MOOE
Projects, Programs and Activities (PAPs)
QUANTITY/ ESTIMATED Mode of SCHEDUL
CODE GENERAL DESCRIPTION
BUDGET Procurement
SIZE Jan Feb Mar Apr
epson ink, black L360 50 bots 12,500.00 Shopping 15 15
epson ink, magenta L360 50 bots 12,500.00 Shopping 5 5 10
epson ink, cyan L360 50 bots 12,500.00 Shopping 10 10
epson ink, yellow L360 50 bots 12,500.00 Shopping 10
bond paper, A4 50 reams 8,000.00 Shopping 20
bond paper, short 50 reams 7,500.00 Shopping 15
bond paper, long 50 reams 9,000.00 Shopping 10
puncher 4 pcs 850.00 Shopping 4
Submission of required scissors 4 pcs 200.00 Shopping 4
monthly, quarterly, annual &
other reports correction tape 50 pcs 5,000.00 Shopping 10 15
tape dispenser 2 pcs 150.00 Shopping
transparent tape, 24mm 30 pcs 750.00 Shopping 10
masking tape, 24mm 20 pcs 1,300.00 Shopping 10
calculator 2 pcs 1,000.00 Shopping 2
pencil 2 boxes 300.00 Shopping
ballpen 20 pcs 200.00 Shopping
sign pen 20 pcs 1,600.00 Shopping
85,850.00 10 10
air freshener, 280ml/can 8 cans 687.95 Shopping 2 2
138,239.10
224,089.10
TOTAL BUDGET:
NOTE: Technical Specifications for each Item/Project being proposed shall be submitted as part of the PPMP
SCHEDULE/MILESTONE OF ACTIVITIES
May Jun July Aug Sept Oct Nov Dec
10 10
5 5 10 10
10 10 10
10 10 10 10
10 10 10
15 10 10
10 10 10 10
5 5 5 10
2
10 10
5 5
2
10 10
2 2
10 6 10
10 20
2
6
6
2
10
100
10
100
100
100
10
2
10
20
20
50
50
20
20
20
20
120
1
10
10
100
10
GRACE E. RELLIQUETE
Secondary School Principal II
PROJECT PROCUREMENT MANAGEMENT PLAN (PPMP)
CY 2018
END-USER/UNIT: RAMON D. BOTONA
Charged to MOOE
Projects, Programs and Activities (PAPs)
QUANTITY/ ESTIMATED Mode of SCHEDULE/MILESTONE OF ACTIVITIES
CODE GENERAL DESCRIPTION
BUDGET Procurement
SIZE Jan Feb Mar Apr May Jun July Aug Sept Oct Nov Dec
G.I. pipe, # 2 3 600.00 Shopping 3
coupling, #2 3 500.00 Shopping 3
G.I pipe, 3/4 1 500.00 Shopping 1
foot valve 1 300.00 Shopping 1
3. Construction of DeepWell Water
supply system reducer, 2-3/4 1 700.00 Shopping 1
electric motor water pump, 1HP 1 7,000.00 Shopping 1
water tank, 5K Liters 1 5,000.00 Shopping 1
angle bars, 1 1/2 10 500.00 Shopping 10
Labor 2 5,000.00 Shopping 2
49,156.68
TOTAL BUDGET:
NOTE: Technical Specifications for each Item/Project being proposed shall be submitted as part of the PPMP
Charged to MOOE
Projects, Programs and Activities (PAPs)
QUANTITY/ ESTIMATED
CODE GENERAL DESCRIPTION
BUDGET
SIZE
USB 1 500.00
dictionary 1 300.00
tarpaulin 1 500.00
15,320.00
transportation 15 800.00
meals 35 1,500.00
Students participation in the
different activities / events in math
registration 15 750.00
3,050.00
18,370.00
TOTAL BUDGET:
NOTE: Technical Specifications for each Item/Project being proposed shall be submitted as part of the PPMP
Shopping
Shopping
Shopping
Shopping
Shopping
Shopping
Shopping
Shopping
Shopping
Shopping
Shopping
Shopping
Shopping
Shopping
Shopping
Shopping
Shopping
Shopping 15
Shopping 35
Shopping
15
Approved:
GRACE E. RELLIQUETE
sistant II / Bookkeeper Secondary School Principal II
IES
Oct Nov Dec
1
15
20
10
15
25
2
PROJECT PROCUREMENT MANAGEMENT PLAN (PPMP)
CY 2018
END-USER/UNIT: SHEEN Y. SALVATIERRA
NOTE: Technical Specifications for each Item/Project being proposed shall be submitted as part of the PPMP
6
2
2
2
6
2
3
3
2
2
2
2
4
2
20
2
2
4
4
4
2
5
5
2
2
2
2
2
2
QUETE
rincipal II
PROJECT PROCUREMENT MANAGEMENT PLAN (PPMP)
CY 2018
END-USER/UNIT: DEWANIE P. EVIOTA
Charged to MOOE
Projects, Programs and Activities (PAPs)
QUANTITY/ ESTIMATED Mode of SCHEDULE/MILESTONE OF ACTIVITIES
CODE GENERAL DESCRIPTION
BUDGET Procurement
SIZE Jan Feb Mar Apr May Jun July Aug Sept Oct Nov Dec
bond paper, A4 3 330.00 Shopping 3 14 packs
bond paper, short 1 115.00 Shopping 1 70 pcs
bond paper, long 1 125.00 Shopping 1 14
pentel pen 20 600.00 Shopping 20 24
Disaster management
manila paper 40 100.00 Shopping 40 310
tarpaulin 1 500.00 Shopping 1 6 boxes
expandable envelope 50 250.00 Shopping 50 15
Fastener, plastic coated 3 105.00 Shopping 3 320 pcs
2,125.00
TOTAL BUDGET:
NOTE: Technical Specifications for each Item/Project being proposed shall be submitted as part of the PPMP
Charged to MOOE
Projects, Programs and Activities (PAPs)
QUANTITY/ ESTIMATED Mode of SCHE
CODE GENERAL DESCRIPTION
BUDGET Procurement
SIZE Jan Feb Mar
manila paper 10 28.00 Shopping
1,378.00
34,600.00 6
1,995.00
37,973.00
TOTAL BUDGET:
NOTE: Technical Specifications for each Item/Project being proposed shall be submitted as part of the PPMP
SCHEDULE/MILESTONE OF ACTIVITIES
Apr May Jun July Aug Sept Oct Nov Dec
10
30
2
2
6
4
24
10
5
GRACE E. RELLIQUETE
ondary School Principal II
PROJECT PROCUREMENT MANAGEMENT PLAN (PPMP)
CY 2018
END-USER/UNIT: GEORGE D. CORNITES
39,900.00
46,095.00
TOTAL BUDGET:
NOTE: Technical Specifications for each Item/Project being proposed shall be submitted as part of the PPMP
SCHEDULE/MILESTONE OF ACTIVITIES
Apr May Jun July Aug Sept Oct Nov Dec
50
25
2
1
3
3
6
10
3
10
10
1
1
1
2
5
2
10
10
4
GRACE E. RELLIQUETE
ondary School Principal II
PROJECT PROCUREMENT MANAGEMENT PLAN (PPMP)
CY 2018
END-USER/UNIT: GEROM N. QUIÑO
Charged to MOOE
Projects, Programs and Activities (PAPs)
QUANTITY/ ESTIMATED Mode of SCHE
CODE GENERAL DESCRIPTION
BUDGET Procurement
SIZE Jan Feb Mar
Arnis padded sticks 1 1000 Shopping 1
badminton net 2 900.00 Shopping 2
badminton racket 4 4,000.00 Shopping 4
basketball 2 3,000.00 Shopping 2
basketball net 4 1,800.00 Shopping 4
catering services 15 2,700.00 Shopping 15.00
chess board 4 800.00 Shopping 4.00
football 2 4,000.00 Shopping
meter sticks 2 100.00 Shopping
rulers 5 100.00 Shopping
Conduct school-based seminar on shuttle cock 2 1,200.00 Shopping 2
sports
sipak takraw ball 2 1,300.00 Shopping
sipak takraw net 2 1000 Shopping
stop watch 2 2,500.00 Shopping
table tennis set 2 600.00 Shopping
tarpaulin 1 500.00 Shopping
volleyball 2 1,800.00 Shopping
volleyball net 2 1,000.00 Shopping
warning device, cones 4 800.00 Shopping
whistle 4 150.00 Shopping
29,250.00
epson ink, black & colored 8 1,000.00 Shopping
Engage community activities thru sports bond paper, long 2 250.00 Shopping
1,910.00
3,540.00
87,300.00
TOTAL BUDGET:
NOTE: Technical Specifications for each Item/Project being proposed shall be submitted as part of the PPMP
SCHEDULE/MILESTONE OF ACTIVITIES
Apr May Jun July Aug Sept Oct Nov Dec
2
2
5
2
2
2
2
1
2
2
4
4
8
2
10
10
6
2
GRACE E. RELLIQUETE
ondary School Principal II
PROJECT PROCUREMENT MANAGEMENT PLAN (PPMP)
CY 2018
END-USER/UNIT: WILHELMINA M. LLAMERA / SHS TEACHERS
Charged to MOOE
Projects, Programs and Activities (PAPs)
QUANTITY/ ESTIMATED Mode of SCHE
CODE GENERAL DESCRIPTION
BUDGET Procurement
SIZE Jan Feb Mar
Ballpen 15 90.00 Shopping 15
Bond Paper, A4 5 550.00 Shopping
Bond Paper, long 5 610.00 Shopping
Bond Paper, short 5 580.00 Shopping
870.00 10
cassette player 1 1,000.00 Shopping
12,673.00
320.00
4,770.00
41,587.00
2,425.00
3,250.00
91,435.00
205,088.00
TOTAL BUDGET:
NOTE: Technical Specifications for each Item/Project being proposed shall be submitted as part of the PPMP
SCHEDULE/MILESTONE OF ACTIVITIES
Apr May Jun July Aug Sept Oct Nov Dec
5
5
5
3
5
2
2
20
12
1
3
12
10
5
10
10
1
1
4
1
1
1
2
2
2
10
10
10
6
20
10
5
1.00
8.00
2.00
2.00
2.00
2.00
5
10
10
1
2
1
1
2
15
3
3
3
25
10
20
10
10
200
1500
10
10
3
4
15
10
15
15
15
12
10
12
12
15
12
10
1
24
10
40
50
12
24
12
25
20
20
8
10
15
12
10
20
20
20
150
40
30
12
20
2
2
100
20
40
70
70
GRACE E. RELLIQUETE
ondary School Principal II
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF EDUCATION
Caraga Administrative Region
Division of Surigao del Norte
MAINIT NATIONAL HIGH SCHOOL
Mainit, Surigao del Norte
SCHEDULE/MILESTO
UNIT QUANTITY/ ESTIMATED
PROCUREMENT PROGRAM/PROJECT GENERAL DECRIPTION SIZE BUDGET JAN FEB MAR APR MAY JUN
KRA 1: Instructional Leadership
Delivery of the Curriculum
Ballpen pieces 12 90.00
Bond Paper, A4 ream 3 325.00
Bond Paper, Long ream 3 365.28
Bond Paper, Short ream 3 345.00
Cannon Paper, Short (assorted color) pack 1 36.00
Construction Paper (assorted color) pack 3 150.00
Expandable Envelope pieces 6 30.00
Implementation of School Initiative like Read Fastener, plastic coated box 2 70.00
and Drink, and #rs.
Ink refill (3 colors & 1 black) bottle 1 1,227.00
Manila Paper sheet 60 165.00
Paste bottle 12 100.00
Tarpaulin pieces 1 500.00
Skimmed Milk kilos 10 1,500.00
White Board Eraser pieces 2 60.00 3
White Board Pen pieces 12 624.00 3
Ballpen (Black) pieces 30 225.00
Bond Paper, A4 ream 4 434.00
Bond Paper, Long ream 5 608.00
Bond Paper, Short ream 2 230.00
Brown Envelope, Long pieces 24 129.00
SCHEDULE/MILESTO
UNIT QUANTITY/ ESTIMATED
PROCUREMENT PROGRAM/PROJECT GENERAL DECRIPTION SIZE BUDGET JAN FEB MAR APR MAY JUN
Cartolina sheet 30 111.00
Catering Services pax 94 16,920.00 32
Construction Paper (assorted color) pack 5 250.00
Elmers Glue bottle 10 518.00
2. Localization of the curriculum
Manila Paper sheet 80 220.00
Meter stick pieces 5 250.00 5
Pencil pieces 20 500.00
Pentil Pen (Pilot Black) pieces 30 900.00
Presenter pointer pieces 1 1,350.00 1
Projector (1 set) unit 1 15,000.00 1
Scotch Tape pieces 4 137.00
Tarpaulin sheet 1 500.00
White Board pieces 1 2,000.00 1
Lesson Plan pieces 1 60.00 1
Bond Paper, A4 ream 2 217.00 1 1
Bond Paper, Long ream 2 243.00 1 1
Bond Paper, Short ream 2 230.00 1 1
Ballpen pieces 15 112.00 5 10
Cannon Paper (Assorted Color) pack 10 360.00 10
3. Contextualization & Localization of IM's Chalk box 2 54.00 2
Envelope, Expandable pieces 10 50.00 10
Fastener plastic coated box 6 210.00 3 3
Manila Paper sheet 60 132.00 48 12
Pencil pieces 10 50.00 10
Pentil Pen (Pilot Black) pieces 5 150.00 5
Tarpaulin sheet 1 500.00 1 1
Ink refill (3 colors & 1 black) bottle 1 1,636.00 1
Bond Paper, A4 ream 1 107.94 1
Bond Paper, Long ream 1 121.76 1
Bond Paper, Short ream 1 115.00 1
4. Indigenizationof instructional materials Expandable Envelope pieces 2 10.00 2
SCHEDULE/MILESTO
UNIT QUANTITY/ ESTIMATED
PROCUREMENT PROGRAM/PROJECT GENERAL DECRIPTION
4. Indigenizationof instructional materials SIZE BUDGET JAN FEB MAR APR MAY JUN
Ballpen pieces 5 37.50 5
Manila Paper sheet 10 27.50 10
Construction Paper (assorted color) pack 10 500.00 10
Tarpaulin sheet 1 500.00 1
5. Early registration for Grades 6-9 Paper, Multi-copy, legal ream 2 320.00 1
Short Bond paper 2 230.00 2
6. Registration of JHS & SHS Steel Cabinet 1 5,000.00 1
Banner 1 250.00
Short Bond paper 2 230.00 2
expandable envelop 13 234.00 13
7. Profiles of the students
fastener 3 65.00 3
Steel Cabinet 1 5,000.00 1
8. Walk-in student/client Short Bond paper 1 115.00 1
Short Bond paper 1 115.00
9. Career guidance week for G10
Steel Cabinet 1 5,000.00 1
Video Clip CD 3 150.00
10. Collage Making Manila Paper 50 137.50
Paste 12 100.00
A4 Bond Paper 3 325.59
Short Bond Paper 1 115.00
Long Bond Paper 1 121.76
Pentel Pen 20 600.00
11. Disaster Management
Manila Paper 48 132.00
Tarpaulin 1 500.00
Expandable Envelop 50 250.00
Fastener (Plastic Coated) 3 105.00
Banner 2 500.00
12. GSP & BSP Conference manila paper 100 275.00
Cartolina 8 29.84
Hair Steamer unit 2 8,000.00
Infrared Iron unit 2 5,000.00 5
SCHEDULE/MILESTO
UNIT QUANTITY/ ESTIMATED
PROCUREMENT PROGRAM/PROJECT GENERAL DECRIPTION SIZE BUDGET JAN FEB MAR APR MAY JUN
Modular Mirror set 1 800.00 5
Shampoo Bowl set 1 1,000.00 2
Thinning Scissor for Hair pieces 2 500.00 2
Teeth Scossor for Hair pieces 2 500.00 2
Smock Gown set 2 300.00 3
13. Hairdressing & Wellnes Massage tools,
equipment and supplies for learning process Curling Iron set 2 2,200.00 4
and implementation for Senior High
Cutting Scissor pieces 2 300.00 2
Foot SPA Machine unit 1 2,800.00
Manicurist Chair, Stool set 1 4,500.00 4
Manicure Table set 1 3,000.00 1
Trolley unit 1 3,000.00 1
Foot SPA Basin pieces 2 500.00 2
Cabinet unit 1 3,500.00
Basketball Buzzer unit 1 2,000.00 4
Badminton Net pieces 4 1,800.00 2 2
Badminton Racket pieces 12 12,000.00 6 6
Basketball pieces 4 3,400.00 1 3
Basketball Net pieces 4 1,800.00 2 2
Catering services pieces 25 3,750.00
Chess board pieces 7 1,400.00 5 2
Football pieces 2 4,000.00 2
Meter Sticks pieces 5 250.00 5
Rulers pieces 10 100.00 10
14. Conduct school-based Sportfest.
Shuttle cock pieces 4 2,324.00 2 2
Sipak Takraw Ball pieces 4 2,600.00 2 2
Sipak Takraw Net pieces 4 2,000.00 2 2
Stop watch pieces 5 4,750.00 5
Table Tennis Set pieces 2 600.00 2
Tarpaulin pieces 1 500.00 1
Volleyball pieces 4 3,400.00 2 2
Volleyball Net pieces 4 2,000.00 2 2
SCHEDULE/MILESTO
UNIT QUANTITY/ ESTIMATED
PROCUREMENT PROGRAM/PROJECT GENERAL DECRIPTION SIZE BUDGET JAN FEB MAR APR MAY JUN
Warning Device (cones) pieces 10 2,000.00 10
Whistle pieces 5 250.00 5
15. Evaluate students learning through oral Bond Paper, A4 ream 12 1,301.77 1 1 1 1 1 1
recitations, quizzes and periodic examinations
Bond Paper, Long ream 12 1,461.12 1 1 1 1 1 1
Bond Paper, Short ream 12 1,380.00 1 1 1 1 1 1
Ballpen pieces 12 90.00 1 1 1 1 1 1
Epson L800 Ink Refill (Black) bottle 4 1,636.00 1 1
Epson L800 Ink Refill (Colored) bottle 4 4,908.00 1 1
Epson L800 Ink Refill (Black) bottle 12 4,908.00 3 3
Epson L800 Ink Refill (Colored) bottle 12 14,724.00 3 3
16. Submission of required monthly, quarterly, Bond Paper, A4 ream 12 1,301.77 1 1 1 1 1 1
annual & other reports
Bond Paper, Long ream 12 1,461.12 1 1 1 1 1 1
Bond Paper, Short ream 12 1,380.00 1 1 1 1 1 1
Continuing professional development and support
manila paper sheet 20 55.00 10
Construction Paper (assorted color) pack 3 150.00
ballpen (blue, black) pieces 4 boxes 600.00 2
Frames for Certificates pieces 4 400.00 2
1. Training and tutoring for GAS Senior High
Token pieces 4 400.00 2
Ink refill (3 colors & 1 black) bottle 4 1,636.00 2
Token pieces 4 400.00
A4 Bond paper ream 4 433.53 2
Ink refill (black) bottle 3 1,000.00 3
expandable envelope pieces 50 250.00 50
Intermediate paper pad 3 100.00 3
2. Coaching and Mentoring
ballpen pieces 50 375.00 50
Paper, Multi-copy, legal ream 5 155.00 5
manila paper sheet 48 132.00 48
KRA 2: Learning Environment
Reading Materials pieces 2 2,000.00 2
Journal/columnar/worksheets sheet 24 600.00 12 12
SCHEDULE/MILESTO
UNIT QUANTITY/ ESTIMATED
PROCUREMENT PROGRAM/PROJECT GENERAL DECRIPTION SIZE BUDGET JAN FEB MAR APR MAY JUN
Scotch tape 1"& 2" pieces 4 110.00 4
stapler heavy duty(Max HD-50DF) pieces 1 1,000.00 1
staple wire no. 15 pieces 1 60.00 1
1. Basic approaches on the core subject for
GAS Senior High A4 Bond paper ream 4 434.12 4
Colored bond paper (yellow, pink, blue, green, pack 4 1,000.00 2 2
orange)
Folder (short & Long) pieces 24 120.00 12 12
ballpen (blue, black) pieces 80 600.00 2
Pencil Mongol No. 2 pieces 24 180.00 12 12
manila paper sheet 20 55.00 10
colored bond paper (yellow, pink, blue, green, ream 3 750.00
orange)
ballpen (blue, black) pieces 80 600.00 2
Implementation of Failure Rate (Tuldokan Frames for Certificates pieces 4 400.00 2
Estudyante Alalayan)
Token pieces 4 400.00 2
Ink refill (3 colors & 1 black) bottle 1 3,200.00 1
Token pieces 4 400.00
A4 Bond paper ream 4 434.12 2
3. Implementation of Monthly Feeding Tarpaulin sheet 1 500.00 1
Program Weighing Scale unit 3 3,000.00 3
Bolos pieces 6 300.00
Cyclone Wire 5ft. pieces 6 3,600.00 6
Grab Hoe pieces 5 700.00 5
Grass Cutter, motorized pieces 1 20,000.00 1
Greenhouse plastic film (2.7m x 100m) pieces 1 4,200.00
Hand Sprayer pieces 5 600.00 5
Hand trowel pieces 5 300.00 5
Knapsack sprayer pieces 3 4,500.00
Nails # 2 pieces 5 500.00 5
Nails # 3 pieces 5 500.00 5
4. Procument of gardening tools and Nails # 4 pieces 5 500.00 5
equipment and Implementation of Gulayan sa
Paaralan Pick Mattock pieces 5 700.00 5
4. Procument of gardening tools and SCHEDULE/MILESTO
UNIT QUANTITY/
equipment and Implementation of Gulayan sa ESTIMATED
PROCUREMENT PROGRAM/PROJECT GENERAL DECRIPTION
Paaralan SIZE BUDGET JAN FEB MAR APR MAY JUN
Picking knife pieces 1 500.00
Polyethylene bag pieces 1 150.00
Pruning shear pieces 3 600.00 3
Rake pieces 3 500.00 3
Seed bed pieces 2 800.00
Seeds of Different Veg. Crops pieces 20 5,000.00 20
Shovel pieces 7 5,000.00 7
Sprinkler pieces 10 1,500.00 10
Ladder, pieces 1 4,500.00
Straw pieces 2 200.00 2
Apron pieces 10 1,000.00
Gas Tank can 2 5,000.00 2
Butcher Knife pieces 5 1,500.00
Cake decorating Airbrush w/ compressor set 2 3,000.00
Caldron pieces 5 4,000.00
Certificate pieces 30 400.00
Chopping Board pieces 5 1,000.00
Colander pieces 5 1,000.00
Commercial Mixer with attachments unit 1 15,000.00
Cutleries pieces 3 1,500.00 3
Double boiler pieces 5 3,500.00 2
Face Mask pieces 10 500.00 10
Filleting knife pieces 5 1,500.00 5
Frying Pan pieces 5 1,750.00 5
Gas range unit 2 34,000.00 1
Glasswares pieces 4 3,840.00 4
Hair Net pieces 10 350.00 10
5. Cookery tools & equipment for learning Hand Towel pieces 5 350.00 5
process and annual cooking contest
Laddle pieces 10 2,500.00 10
Mechanical Dough roller unit 1 25,000.00
Mixing Bowl Set pieces 10 10,000.00
process and annual cooking contest
SCHEDULE/MILESTO
UNIT QUANTITY/ ESTIMATED
PROCUREMENT PROGRAM/PROJECT GENERAL DECRIPTION SIZE BUDGET JAN FEB MAR APR MAY JUN
Pie cutter pieces 10 1,200.00
Plates (Assorted) pieces 100 7,500.00 100
Rectangular pan 8, 10, 12 pieces 5 5,000.00
Refrigerator unit 1 18,000.00
Small Bowl pieces 2 1,000.00
Soup Bowl pieces 4 3,200.00 4
Strainer pieces 5 750.00
Straw pieces 4 400.00 4
Tarpaulin pieces 1 500.00
Token pieces 5 1,000.00
Upright freezer unit 1 22,000.00
Water Goblets pieces 3 1,350.00
Weighing Scale 10kgs unit 3 3,000.00
Wine Glasses pieces 3 1,350.00
6. Table Cloth Cloth for Skirting of tables 30 m 3,000.00
SCHEDULE/MILESTONE OF ACTIVITIES
JUL AUG SEPT OCT NOV DEC
12
3
3
3
1
3
6
2
3
10
12
1
10
3 3
30
2
2 3
3
24
SCHEDULE/MILESTONE OF ACTIVITIES
JUL AUG SEPT OCT NOV DEC
30
62
5
5
30 50
20
10 20
4
1
SCHEDULE/MILESTONE OF ACTIVITIES
JUL AUG SEPT OCT NOV DEC
3
50
12
3
1
1
20
48
1
50
3
1
50
4
10
SCHEDULE/MILESTONE OF ACTIVITIES
JUL AUG SEPT OCT NOV DEC
30
1 10
30
SCHEDULE/MILESTONE OF ACTIVITIES
JUL AUG SEPT OCT NOV DEC
1 1 1 1 1 1
1 1 1 1 1 1
1 1 1 1 1 1
1 1 1 1 1 1
1 1
1 1
3 3
3 3
1 1 1 1 1 1
1 1 1 1 1 1
1 1 1 1 1 1
10
3
2
2
2
4
4
2
SCHEDULE/MILESTONE OF ACTIVITIES
JUL AUG SEPT OCT NOV DEC
10
2
2
2
4
2
3
SCHEDULE/MILESTONE OF ACTIVITIES
JUL AUG SEPT OCT NOV DEC
1
1
10
5
1 1
5
30
5
5
1
1
10
SCHEDULE/MILESTONE OF ACTIVITIES
JUL AUG SEPT OCT NOV DEC
5 5
2 1 2
1
2
1
5
1
2 1
3
2 1
1
1
2
5
5
11
11
11
11
11
2
SCHEDULE/MILESTONE OF ACTIVITIES
JUL AUG SEPT OCT NOV DEC
12
12
1
3
3
12
1
12
12
12
1
3
3
3
1
3
10
1
12
2
10
5
12
3
1
1
1
SCHEDULE/MILESTONE OF ACTIVITIES
JUL AUG SEPT OCT NOV DEC
4
1
1
1
1
3
45
10
10
45
40
15
10
20
20
3
3
30
1
3
3
1
SCHEDULE/MILESTONE OF ACTIVITIES
JUL AUG SEPT OCT NOV DEC
15
20
12
10
5
5
3
10
2
3
3
3
1
3
12
50
2
5
5
50
20
1
30
50
SCHEDULE/MILESTONE OF ACTIVITIES
JUL AUG SEPT OCT NOV DEC
1
3
3
45
10
1
1
10
45
40
15
27
70
25
20
2
10
50
SCHEDULE/MILESTONE OF ACTIVITIES
JUL AUG SEPT OCT NOV DEC
5
5
5
5
1 1
5
1 1 1
2 3
5
5
1 1
10
10
1
10
5 5
2 1 2
1
10
1
2 1
3
2 1
SCHEDULE/MILESTONE OF ACTIVITIES
JUL AUG SEPT OCT NOV DEC
3 2
1
1
1
3
3
45
10
1
10
45
40
30
230
30 30 30 30 30
SCHEDULE/MILESTONE OF ACTIVITIES
JUL AUG SEPT OCT NOV DEC
1
3
3
40
10
40
40
1
3
3
40
10
40
40
3
12
12
3
4
43
1
48
SCHEDULE/MILESTONE OF ACTIVITIES
JUL AUG SEPT OCT NOV DEC
2 2 2 2 2 2
SCHEDULE/MILESTONE OF ACTIVITIES
JUL AUG SEPT OCT NOV DEC
2 2 2 2 2 2
2 2 2 2 2 2
2 2 2 2 2 2
2 2 2 2 2 2
3 3
1 1
3 3
6 6
1 1
6 6
2 2
2 2
3 3
3 3
12 12
5 5
10 10
24 24
3 3
1 1
6 6
6 6
12
SCHEDULE/MILESTONE OF ACTIVITIES
JUL AUG SEPT OCT NOV DEC
2 2 2 2 2 2
2
1
1
1
1
1
5
3
1
1
50
3 3 3 3 3 3
100
1 1 1
1 1 1
1 1 1
1 1 1
2 2 2 2 2 2
12 12
1
3
1
400
1
10
1
2
SCHEDULE/MILESTONE OF ACTIVITIES
JUL AUG SEPT OCT NOV DEC
2
2
8
1
2
5
5
1
6
1
1
2
1
20
15
1
50
5
2
2
5
3
2
1500
3
10
1
SCHEDULE/MILESTONE OF ACTIVITIES
JUL AUG SEPT OCT NOV DEC
1
1
1
1
20
1
1
2
1
50
1
500
4
3
1
6
4 4
6 6
2 2 2 2 2 2
2 2
3 3 3 3 3 3
5 5
1 1
SCHEDULE/MILESTONE OF ACTIVITIES
JUL AUG SEPT OCT NOV DEC
1 1
1 1 1
1 1 1 1 1
6 6
1
SCHEDULE/MILESTONE OF ACTIVITIES
JUL AUG SEPT OCT NOV DEC
1 1
NOTED:
SCHEDULE/MILESTO
UNIT QUANTITY/ ESTIMATED
PROCUREMENT PROGRAM/PROJECT GENERAL DECRIPTION SIZE BUDGET JAN FEB MAR APR MAY JUN
KRA 1: Instructional Leadership
Delivery of the Curriculum
Ballpen pieces 12 90.00 12
Bond Paper, A4 ream 3 325.00 3
Bond Paper, Long ream 3 365.28 3
Bond Paper, Short ream 3 345.00 3
Cannon Paper, Short (assorted color) pack 1 36.00 1
Construction Paper (assorted color) pack 3 150.00 3
1. Significance in the integration of the core Expandable Envelope pieces 6 30.00 6
subject (GAS-Senior High) Fastener, plastic coated box 2 70.00 2
Ink refill (3 colors & 1 black) bottle 1 1,227.00 3
Manila Paper sheet 60 165.00 10
Paste bottle 12 100.00
Tarpaulin pieces 1 500.00 1
White Board Eraser pieces 2 60.00 3
White Board Pen pieces 12 624.00 3 3
Ballpen (Black) pieces 30 225.00
Bond Paper, A4 ream 4 434.00
Bond Paper, Long ream 5 608.00
Bond Paper, Short ream 2 230.00
Brown Envelope, Long pieces 24 129.00
Cartolina sheet 30 111.00
SCHEDULE/MILESTO
UNIT QUANTITY/ ESTIMATED
PROCUREMENT PROGRAM/PROJECT GENERAL DECRIPTION SIZE BUDGET JAN FEB MAR APR MAY JUN
Catering Services pax 94 16,920.00 32
Construction Paper (assorted color) pack 5 250.00
Elmers Glue bottle 10 518.00
2. Localization of the curriculum
Manila Paper sheet 80 220.00
Meter stick pieces 5 250.00 5
Pencil pieces 20 500.00
Pentil Pen (Pilot Black) pieces 30 900.00
Presenter pointer pieces 1 1,350.00 1
Projector (1 set) unit 1 15,000.00 1
Scotch Tape pieces 4 137.00
Tarpaulin sheet 1 500.00
White Board pieces 1 2,000.00 1
Lesson Plan pieces 1 60.00 1
Bond Paper, A4 ream 2 217.00 1 1
Bond Paper, Long ream 2 243.00 1 1
Bond Paper, Short ream 2 230.00 1 1
Ballpen pieces 15 112.00 5 10
Cannon Paper (Assorted Color) pack 10 360.00 10
3. Contextualization & Localization of IM's Chalk box 2 54.00 2
Envelope, Expandable pieces 10 50.00 10
Fastener plastic coated box 6 210.00 3 3
Manila Paper sheet 60 132.00 48 12
Pencil pieces 10 50.00 10
Pentil Pen (Pilot Black) pieces 5 150.00 5
Tarpaulin sheet 1 500.00 1 1
Ink refill (3 colors & 1 black) bottle 1 1,636.00 1
Bond Paper, A4 ream 1 107.94 1
Bond Paper, Long ream 1 121.76 1
Bond Paper, Short ream 1 115.00 1
4. Indigenizationof instructional materials Expandable Envelope pieces 2 10.00 2
Ballpen pieces 5 37.50 5
4. Indigenizationof instructional materials SCHEDULE/MILESTO
UNIT QUANTITY/ ESTIMATED
PROCUREMENT PROGRAM/PROJECT GENERAL DECRIPTION SIZE BUDGET JAN FEB MAR APR MAY JUN
Manila Paper sheet 10 27.50 10
Construction Paper (assorted color) pack 10 500.00 10
Tarpaulin sheet 1 500.00 1
5. Early registration for Grades 6-9 Paper, Multi-copy, legal ream 2 320.00 1
Short Bond paper 2 230.00 2
6. Registration of JHS & SHS Steel Cabinet 1 5,000.00 1
Banner 1 250.00
Short Bond paper 2 230.00 2
expandable envelop 13 234.00 13
7. Profiles of the students
fastener 3 65.00 3
Steel Cabinet 1 5,000.00 1
8. Walk-in student/client Short Bond paper 1 115.00 1
Short Bond paper 1 115.00
9. Career guidance week for G10
Steel Cabinet 1 5,000.00 1
Video Clip CD 3 150.00
10. Collage Making Manila Paper 50 137.50
Paste 12 100.00
A4 Bond Paper 3 325.59
Short Bond Paper 1 115.00
Long Bond Paper 1 121.76
Pentel Pen 20 600.00
11. Disaster Management
Manila Paper 48 132.00
Tarpaulin 1 500.00
Expandable Envelop 50 250.00
Fastener (Plastic Coated) 3 105.00
Banner 2 500.00
12. GSP & BSP Conference manila paper 100 275.00
Cartolina 8 29.84
Hair Steamer unit 2 8,000.00
Infrared Iron unit 2 5,000.00 5
Modular Mirror set 1 800.00 5
SCHEDULE/MILESTO
UNIT QUANTITY/ ESTIMATED
PROCUREMENT PROGRAM/PROJECT GENERAL DECRIPTION SIZE BUDGET JAN FEB MAR APR MAY JUN
Shampoo Bowl set 1 1,000.00 2
Thinning Scissor for Hair pieces 2 500.00 2
Teeth Scossor for Hair pieces 2 500.00 2
Smock Gown set 2 300.00 3
13. Hairdressing & Wellnes Massage tools,
equipment and supplies for learning process Curling Iron set 2 2,200.00 4
and implementation for Senior High
Cutting Scissor pieces 2 300.00 2
Foot SPA Machine unit 1 2,800.00
Manicurist Chair, Stool set 1 4,500.00 4
Manicure Table set 1 3,000.00 1
Trolley unit 1 3,000.00 1
Foot SPA Basin pieces 2 500.00 2
Cabinet unit 1 3,500.00
Basketball Buzzer unit 1 2,000.00 4
Badminton Net pieces 4 1,800.00 2 2
Badminton Racket pieces 12 12,000.00 6 6
Basketball pieces 4 3,400.00 1 3
Basketball Net pieces 4 1,800.00 2 2
Catering services pieces 25 3,750.00
Chess board pieces 7 1,400.00 5 2
Football pieces 2 4,000.00 2
Meter Sticks pieces 5 250.00 5
Rulers pieces 10 100.00 10
14. Conduct school-based seminar on sports
Shuttle cock pieces 4 2,324.00 2 2
Sipak Takraw Ball pieces 4 2,600.00 2 2
Sipak Takraw Net pieces 4 2,000.00 2 2
Stop watch pieces 5 4,750.00 5
Table Tennis Set pieces 2 600.00 2
Tarpaulin pieces 1 500.00 1
Volleyball pieces 4 3,400.00 2 2
Volleyball Net pieces 4 2,000.00 2 2
Warning Device (cones) pieces 10 2,000.00 10
SCHEDULE/MILESTO
UNIT QUANTITY/ ESTIMATED
PROCUREMENT PROGRAM/PROJECT GENERAL DECRIPTION SIZE BUDGET JAN FEB MAR APR MAY JUN
Whistle pieces 5 250.00 5
15. Evaluate students learning through oral Bond Paper, A4 ream 12 1,301.77 1 1 1 1 1 1
recitations, quizzes and periodic examinations
Bond Paper, Long ream 12 1,461.12 1 1 1 1 1 1
Bond Paper, Short ream 12 1,380.00 1 1 1 1 1 1
Ballpen pieces 12 90.00 1 1 1 1 1 1
Epson L800 Ink Refill (Black) bottle 4 1,636.00 1 1
Epson L800 Ink Refill (Colored) bottle 4 4,908.00 1 1
Epson L800 Ink Refill (Black) bottle 12 4,908.00 3 3
Epson L800 Ink Refill (Colored) bottle 12 14,724.00 3 3
16. Submission of required monthly, quarterly, Bond Paper, A4 ream 12 1,301.77 1 1 1 1 1 1
annual & other reports
Bond Paper, Long ream 12 1,461.12 1 1 1 1 1 1
Bond Paper, Short ream 12 1,380.00 1 1 1 1 1 1
Continuing professional development and support
manila paper sheet 20 55.00 10
Construction Paper (assorted color) pack 3 150.00
ballpen (blue, black) pieces 4 boxes 600.00 2
Frames for Certificates pieces 4 400.00 2
1. Training and tutoring for GAS Senior High
Token pieces 4 400.00 2
Ink refill (3 colors & 1 black) bottle 4 1,636.00 2
Token pieces 4 400.00
A4 Bond paper ream 4 433.53 2
Ink refill (black) bottle 3 1,000.00 3
expandable envelope pieces 50 250.00 50
2. Coaching and Mentoring Intermediate paper pad 3 100.00 3
ballpen pieces 50 375.00 50
manila paper sheet 48 132.00 48
KRA 2: Learning Environment
Reading Materials pieces 2 2,000.00 2
Journal/columnar/worksheets sheet 24 600.00 12 12
Scotch tape 1"& 2" pieces 4 110.00 4
stapler heavy duty(Max HD-50DF) pieces 1 1,000.00 1
SCHEDULE/MILESTO
UNIT QUANTITY/ ESTIMATED
PROCUREMENT PROGRAM/PROJECT GENERAL DECRIPTION SIZE BUDGET JAN FEB MAR APR MAY JUN
Ink refill (3 colors ) bottle 12 1,000.00
pentel pen pieces 10 300.00
glue gun pieces 5 200.00
cloth for decoration meter 5 500.00
CD pieces 3 100.00
Journals/Reading Materials pieces 10 4,000.00
USB pieces 2 1,000.00
A4 Bond paper ream 3 325.59
Short Bond paper ream 3 345.00
Long Bond paper ream 3 365.28
Stapler heavy duty(Max HD-50DF) piece 1 1,000.00
Staple wire no. 15 box 3 180.00
Ink refill (3 colors ) bottle 12 1,000.00
ballpen (Pilot) pieces 50 375.00
20. Pahayagang Pangkampus
puncher pieces 2 300.00
correction fluid bottle 5 200.00
yellow pad paper pad 5 200.00
pencil pieces 50 500.00
Frames for Certificates pieces 20 1,000.00
tarpaulin sheet 1 500.00
manila paper sheet 30 82.50
Long Brown Envelop pieces 50 200.00
Scotch Tape 1" and 2" pieces 4 220.00
21. Information and education campaign Staple Wire no. 15 pieces 3 180.00
Manila Paper sheet 48 132.00
A4 Bond Paper ream 1 108.53
Photo Paper pack 12 500.00
SCHEDULE/MILESTONE OF ACTIVITIES
JUL AUG SEPT OCT NOV DEC
12
3 3
30
2
2 3
3
24
30
SCHEDULE/MILESTONE OF ACTIVITIES
JUL AUG SEPT OCT NOV DEC
62
5
5
30 50
20
10 20
4
1
SCHEDULE/MILESTONE OF ACTIVITIES
JUL AUG SEPT OCT NOV DEC
3
50
12
3
1
1
20
48
1
50
3
1
50
4
10
SCHEDULE/MILESTONE OF ACTIVITIES
JUL AUG SEPT OCT NOV DEC
30
1 10
30
SCHEDULE/MILESTONE OF ACTIVITIES
JUL AUG SEPT OCT NOV DEC
1 1 1 1 1 1
1 1 1 1 1 1
1 1 1 1 1 1
1 1 1 1 1 1
1 1
1 1
3 3
3 3
1 1 1 1 1 1
1 1 1 1 1 1
1 1 1 1 1 1
10
3
2
2
2
4
4
2
SCHEDULE/MILESTONE OF ACTIVITIES
JUL AUG SEPT OCT NOV DEC
10
2
2
2
4
2
1
1
SCHEDULE/MILESTONE OF ACTIVITIES
JUL AUG SEPT OCT NOV DEC
10
5
1 1
5
30
5
5
1
1
10
5 5
SCHEDULE/MILESTONE OF ACTIVITIES
JUL AUG SEPT OCT NOV DEC
2 1 2
1
2
1
5
1
2 1
3
2 1
1
1
2
5
5
11
11
11
11
11
2
SCHEDULE/MILESTONE OF ACTIVITIES
JUL AUG SEPT OCT NOV DEC
12
12
1
3
3
12
1
12
12
12
1
3
3
3
1
3
10
1
12
2
10
5
12
3
1
1
1
4
1
SCHEDULE/MILESTONE OF ACTIVITIES
JUL AUG SEPT OCT NOV DEC
1
1
1
3
45
10
10
45
40
15
10
20
20
3
3
30
1
3
3
1
15
20
SCHEDULE/MILESTONE OF ACTIVITIES
JUL AUG SEPT OCT NOV DEC
12
10
5
5
3
10
2
3
3
3
1
3
12
50
2
5
5
50
20
1
30
50
SCHEDULE/MILESTONE OF ACTIVITIES
JUL AUG SEPT OCT NOV DEC
1
3
3
45
10
1
1
10
45
40
15
27
70
25
20
2
10
50
5
5
5
SCHEDULE/MILESTONE OF ACTIVITIES
JUL AUG SEPT OCT NOV DEC
5
1 1
5
1 1 1
2 3
5
5
1 1
10
10
1
10
5 5
2 1 2
1
10
1
2 1
3
2 1
SCHEDULE/MILESTONE OF ACTIVITIES
JUL AUG SEPT OCT NOV DEC
3 2
1
1
1
3
3
45
10
1
10
45
40
30
230
30 30 30 30 30
SCHEDULE/MILESTONE OF ACTIVITIES
JUL AUG SEPT OCT NOV DEC
1
3
3
40
10
40
40
1
3
3
40
10
40
40
3
12
12
3
4
43
1
48
SCHEDULE/MILESTONE OF ACTIVITIES
JUL AUG SEPT OCT NOV DEC
2 2 2 2 2 2
2 2 2 2 2 2
2 2 2 2 2 2
2 2 2 2 2 2
2 2 2 2 2 2
3 3
SCHEDULE/MILESTONE OF ACTIVITIES
JUL AUG SEPT OCT NOV DEC
1 1
3 3
6 6
1 1
6 6
2 2
2 2
3 3
3 3
12 12
5 5
10 10
24 24
3 3
1 1
6 6
6 6
12
2 2 2 2 2 2
2
SCHEDULE/MILESTONE OF ACTIVITIES
JUL AUG SEPT OCT NOV DEC
1
1
1
1
1
5
3
1
1
50
3 3 3 3 3 3
100
1 1 1
1 1 1
1 1 1
1 1 1
2 2 2 2 2 2
12 12
1
3
1
400
1
10
1
2
2
2
8
1
2
SCHEDULE/MILESTONE OF ACTIVITIES
JUL AUG SEPT OCT NOV DEC
5
5
1
6
1
2
1
2
1
20
15
1
50
5
2
2
5
3
2
1500
3
10
1
1
1
1
1
20
1
1
2
SCHEDULE/MILESTONE OF ACTIVITIES
JUL AUG SEPT OCT NOV DEC
1
50
1
500
4
3
1
6
4 4
6 6
2 2 2 2 2 2
2 2
3 3 3 3 3 3
5 5
1 1
1 1
1 1 1
1 1 1 1 1
6 6
SCHEDULE/MILESTONE OF ACTIVITIES
JUL AUG SEPT OCT NOV DEC
1 1
NOTED:
SCHEDULE/MILESTONE OF ACTIVITIES
JUL AUG SEPT OCT NOV DEC
GRACE E. RELLIQUETE PRESCILA P. BESARIO
Secondary School Principal II PSDS
DEPARTMENT OF EDUCATION
Division of Surigao del Norte
3
TONE OF ACTIVITIES
AUG SEPT OCT NOV DEC
2
2
1
3
40
TONE OF ACTIVITIES
AUG SEPT OCT NOV DEC
3
2
4
43
DEPARTMENT OF EDUCATION
Division of Surigao del Norte
PRECILA P. OLARIO
SST-II/ TLE TEACHER
RECEL S. RAZON
SST-1/ TLE TEACHER
NOV DEC
NOV DEC
2
NOV DEC
NOV DEC
NOV DEC
NOV DEC
ENDA S. LISBOS
PSDS
P ROJEC T PROCUREMENT MANAGEMEN T PLAN (PPMP )
CY 2018
EN D-U SER/U NIT : P lanning & Res earch Unit
5. Early regis tration for Grade short bond paper 1 120.00 Shopping 6
11 & 12
Shopping 40
Arnis padded sticks 1 1000 Shopping 1
badminton net 2 900.00 Shopping 3
badminton racket 4 4,000.00 Shopping 3
basketball 2 3,000.00 Shopping 40
basketball net 4 1,800.00 Shopping 10
catering services 15 2,700.00 Shopping 40
chess board 4 800.00
football 2 4,000.00 Shopping 300
meter sticks 2 100.00 Shopping 5
14. Cond uct school-bas ed s emi nar o n rulers 5 100.00 Shopping 2
s ports shuttle cock 2 1,200.00 Shopping 20
sipak takraw ball 2 1,300.00 Shopping 20
sipak takraw net 2 1000 Shopping
stop watch 2 2,500.00
table tennis set 2 600.00 Shopping 30 30 30 30
tarpaulin 1 500.00 Shopping 30 30
volleyball 2 1,800.00 Shopping 2 2 2 2
volleyball net 2 1,000.00 Shopping 1 1
warning device, cones 4 800.00 Shopping 1 1
whistle 4 150.00 Shopping 1 1 1
bond paper, A4 5 550.00 Shopping 3 3 3 1
bond paper, long 5 610.00 Shopping 2 2 2 2
bond paper, short 5 580.00 Shopping 32 32 32 32
1 2. Nati onal savi ngs cons ci ousnes s frames for certificates 5 500.00 Shopping
week celebratio n
epson ink, black L360 2 500.00 Shopping
14. Information and education campaign staple wire no.15 1 60.00 Shopping
2. Traini ng a nd de ve lopme nt of te ac he rs /
token 1 1,000.00 Shopping
coac he s / sports c oordinator
catering services 15 3,000.00 Shopping
1. Class officers / club organization ( GAS) ballpen / sign pen 12 460.00 Shopping
Shopping
Shopping
Shopping
Shopping
Shopping
Shopping
Shopping
Shopping
Shopping
Shopping
Shopping
Shopping
Shopping
Shopping
Shopping
Shopping
Shopping 1
460,495.42
TOTAL BUDGET:
NOTE: Technical S pecifications for each Item/Project being proposed shal l be submi tted as part of the PPMP
VILMA O. JUANITE JUANITA J. LEGASPI JULIETA R. VIRTUDAZO, PhD LEILA F. DANAQUE, PhD NELIA S. LOMOCSO