TOT 5.33333333
TOTAL
LABOR RATE UOM VALUE AMT
CEMENT POUR 500 CUM #REF! #REF!
#REF!
TOT TOT # Rebars TOTAL LEN
VOL LEN CEMENT SAND GRAVEL / Col / COL ALL COL
0.54 6 4.86 0.27 0.54 6 6.00 36.00
1 6 5 0.27 0.54
2 0 PLANTED COL
0
0
2 0 GF - RB
0
0
6.666667
6.3
LENGTH TOT TOT
FOOTING S L THICK VOLUME QTY AREA VOL CEMENT
F1 1.2 1.2 0.3 0.432 6 8.6 2.592 24
TOTAL 24
TOTAL
LABOR RATE UOM VALUE AMT
CEMENT POURING 500 CUM 2.59 1,296.00
1,296.00
REBAR
SPACING QTY TOTAL LENGTH TOTAL LENGTH
SAND GRAVEL S L S L S L PER FTG FOR ALL FTG 20 mm
1.296 2.592 0.13 0.13 9 9 10.8 11 22 131
0
TIE WIRE 50 PC/KG
JOINTS
81 1.62
0.3
2 3
18 mm 16 mm 12 mm 10 mm
22
23
23
TOT Tile Size
LOCATION Length Width Area QTY AREA Length Width
Ground Floor
entire 112.23 1 112.23 0.6 0.6
Stairs 2.1 2 4.2 1 4.2 0.3 0.3
Toilet - flr 2.5 2.15 5.375 1 5.375 0.3 0.3
Toilet - wall 13.6 2 27.2 1 27.2 0.3 0.3
2nd floor
entire 9.7 4.8 46.56 1 46.56 0.6 0.6
Toilet - flr 2.5 2.15 5.375 1 5.375 0.3 0.3
Toilet - wall 13.6 2 27.2 1 27.2 0.3 0.3
TOTAL 228.14
441
0
771
23.4
COMPONENT LOCATION SPECIFIC AREA LENGTH HEIGHT
LABOR UOM
CHB LAYOUT SQM
PLASTERING SQM
CORNER FINISHING LM
TOTAL 3.556
QTY AMT
1 59595.8
2 158922
218518 10 mm rebar #REF!
tie wire
ORDER QUANTITY
EXT CHB 4966
CEMENT 566
SAND 17.88
10 MM REBAR 1490
VALUE
#REF!
#REF!
#REF!
SAND 27
CUM
0.0438
0.0844
0.125
PERIMETER
7.2
5.7
TOTAL 2.8
AMT
#REF!
#REF!
#REF!
#REF!
80 @ 3 layer
HORIZONTAL QTY 20 mm 18 mm
(10MM) REBAR 0
49 14
51 15
0 0
110 32
80 23
62 18
167 49
335 97
854 187
16 mm 12 mm 10 mm
CLASS CEMENT SAND GRAVEL
AA 12 0.5 1
A 9 0.5 1
B 7.5 0.5 1
C 6 0.5 1
MORTAR CEMENT
SIZE OF CHB CM # / SQM B C
10 x 20 x 40 12.5 0.525 0.394
15 x 20 x 40 12.5 1.013 0.759
20 x 20 x 40 12.5 1.5 1.125
40 kg. CEMENT
PLASTERING 16 mm 20 mm 25 mm
A 0.268 0.36 0.45
B 0.192 0.24 0.3
SAND 0.016 0.02 0.025
ROOF FRAMING
ROOF TRUSS MARK MEMBERS
R1 RAFTER
PURLINS
COM. QTY
HORIZONTAL
C- PURLINS VERTICAL
HORIZONTAL
TOTAL WEIGHT KG
KN
(M) TOTAL
LENGTH QTY LENGTH
42.17 0 0
0 0 0
7.91 0 0
5.51 0 0
TOTAL 0
0
PRESSURE 12.49427
1.82
6
TOTAL TUBULAR
WEIGHT 4" X 4" X 1.5 mm
299.25 0 10
535.5 2" X 4" X 1.5" mm
834.75 46 0
22.5
2.95
1035.00 4.21
10.15 6 2.54 4.41
15.24 4.41
1
TUBULAR 16.98
4" X 4" X 1.5 mm
0
KG PER MTR 3
0
0.00
KG PER MTR 2
0
0.00
1035.00
OPENING 0 0
AREA
WIDTH QTY AREA NET
4.24 1 7.632 82.838 SQM
KN PER SQM
TOTAL
1,401.75
PRIMARY TRUSS
PRIMARY TRUSS
SECONDARY TRUSS
SECONDARY TRUSS
Rebars Qty 10 MM STIRRUPS TOTAL LENGTH
12 mm 16 mm PERIM LEN QTY TOTAL LEN 12 MM 16 MM
GRAVEL / Beam segment
2.81 4 0 1 208 208 124.6 0
124.6 20.77 0 35
TOT VOL DENSITY CONCRETE TOTAL WEIGHT
KG/M
FOOTING 15.552 2500 38880
BEAM 2.8035 2500 7008.75
SLAB #REF! 2500 #REF!
WALL #REF! 2500 #REF!
STEEL COL 1119 1119
ORDER QUANTITY
HARD LIGHTS 39 PCS
METAL FURRINGS 155 PCS
GYPSUM BD QTY QTY FURRNG QTY
WIDTH AREA GB / SQM FURRING
9,526.91
A. 10mm Rebars
10 MM REBAR 8.00
12 MM REBAR 6.00
TOT CEMENT SAND GRAVEL REBAR
Vol DIAG RUN COVER TOTAL LENGTH
10mm Thread
Tot Len Hor Vert Hor Vert
32
CEMENT 220.00
SAND 12.12 449.63
GRAVEL 24.23
12 mm 57 449.63
10 mm 55
0.80 m x 0.6 mm STEEL DE 0 4.8 0 LM
10 2.54
3.937008
QTY TOTAL LENGTH HOR VERT STEEL DECKING
HOR VERT HOR VERT QTY QTY S-LEN L-LEN PAN WIDTH
12 mm 10 mm
13.63 33.00 174.40 166.65 203
#REF!
50
STEEL DECK ESTIMATE
S-LENGTH 0
L-LENGTH 0
WIDTH OF PANEL 0.8
8.9925 KG QTY 1
TOTAL LENGTH 0 LM
ECKING
QTY TOT LEN
PROJECT FISHER MALL HOUSE TOTAL FLOOR AREA 192.665
LOCATION HEROES HILLS SUBDIVISION, QUEZON CITY AVERAGE COST PER SQM 10576.7640211697
OWNER MR. ERMIN GARCIA
ROOF FRAME Materials 23 PCS 2" X 2" X 3/16" ANGLE BAR 850 19550
21 PCS 1 1/2" X 1 1/2" X 3/16" ANGLE BAR 650 13650
36 PCS 2" X 4" X 1.5 mm PURLINS 700 25200
1 SET Acetylene & gas 1100 649
1 GAL Primer paint 600 354
1 LOT Misc Accessories 7522.5 7523
Labor 59 KG Fabrication and installation 15 885
SUB-TOTAL 67811
SLAB Materials 220 BAGS Portland Cement 220 48400 GRND FLR, 2ND FLOOR
12.12 CUM SAND 900 10905 PORCH, LAUNDRY,GARAGE
24.23 CUM GRAVEL 1400 33927
57 PCS 12 mm rebar 152 8611
55 PCS 10 mm rebar 152 8355
21 KG TIE WIRE 70 1470
0 LM 0.80 X0 .6 Steel Deck 600 0
1 LOT Miscellaneous accessories 3000 3000
Labor 24.2 CUM Concrete pouring 550 13328
0 SQM Formworks 150 0
SUB-TOTAL 242663
WALLS Materials 566 BAGS Portland Cement 220 124555 INTERIOR & EXTERIOR
18 CUM SAND 900 16091
1490 PCS 10 mm REBAR 120 178787
4966 PCS 4" CHB 13 64562
15 KG TIE WIRE 70 1050
Labor 397 SQM CHB Laying 150 59596
795 SQM Plastering 200 158922
SUB-TOTAL 603563
SUMMARY
PREPARED BY
PLASTERING
ITEM LENGTH WIDTH AREA THICKNESS VOLUME CEMENT
40 kg. CEMENT
PLASTERING 16 mm 20 mm 25 mm
A 0.268 0.36 0.45
B 0.192 0.24 0.3
SAND 0.016 0.02 0.025
60 @ 2 layer PLASTER AREA
CEMENT SAND GRAVEL VERTICAL HORIZONTAL QTY
12 MM 12 MM
26.208 1.092 2.184 36 55 15
11.232 0.468 0.936 72 72 24
11.232 0.468 0.936 72 72 24
SAND
3.42
3.42
3 0.6
3 0.6
2 2
2 2
10 5.2
16,140.00
BEAM MARK MEMBERS
GRID BEAM BEAM QTY TOT LEN WEIGHT
COORDINATE WF LENGTH KG/M
A1-A2 8 x 24 5 2 10 35.72
B1-B2 8 x 24 5 2 10 35.72
C1-C2 8 x 24 5 2 10 35.72
A1-C1 8 x 24 9.15 1 9.15 35.72
A1-C'1 8 x 24 10.6 1 10.6 35.72
A2-C'2 8 x 24 10.6 1 10.6 35.72
A1.5-C1.5 8 x 24 9.15 1 9.15 35.72
A1.5-C'1.5 8 x 24 10.6 1 10.6 35.72
A2-C2 8 x 24 9.15 1 9.15 35.72
A1-C1 6 x 15 9.15 1 9.15 22.3
A1.5-C1.5 6 x 15 9.15 1 9.15 22.3
A2-C2 6 x 15 9.15 1 9.15 22.3
A1-A2 6 x 15 5 1 5 22.3
B1-B2 6 x 15 5 1 5 22.3
C1-C2 6 x 15 5 1 5 22.3
C'1-C'2 6 x 15 5.22 1 5.22 22.3
TOTAL 121.92 19 136.92 477.58
2404.087
TOTAL
LABOR RATE UOM VALUE AMT
FABRICATION 100 KG 2404.09 240,408.70
240,408.70
0.3
TOT WT TOT WT
PER WF
357.2 8 x 24 3188.01
357.2 6 x 15 1063.041
357.2
326.838
378.632
378.632
326.838
378.632
326.838
204.045
204.045
204.045
111.5
111.5
111.5
116.406
4251.051
9.21 7.61
9.21 7.71
29 4.51 3.1
4.51 9.21
7.71 1.5
ORDER QTY 7.71 4.51
4.55 33.64
QTY TOT WT 7.71
6 x 15 8 1694.914 7.61
6 x 12 10 2143.2 3.1
3.1
68.93 137.86
LOCATION MARK SECTION GRID HEIGHT WT/M COL QTY
KG/M
GRD FLR TO 3RD FLR C1 W6X20 ALL 6 30 6
3RD FLR TO ROOF FRAME C2 W6X15 ALL 2.75 22.3 6
2ND FLR TO ROOF FRAME C2 W6X15 B-C 5.7 22.3 3
COMMERCIAL QTY
TOTAL
LABOR UOM RATE VALUE AMT
FABRICATION KG 100 1829.28 182,928.00
182,928.00
749.28
TOT LEN TOT WT OVERALL WT
69.6 1829.28
12
STEEL DECK
LOCATION LEN WIDTH AREA QTY TOT LEN
TOTAL
LABOR RATE UOM VALUE AMT
FABRICATION 100 LM #REF! #REF!
#REF!
0
CLASS CEMEN SAND GRAVEL
AA 12 0.5 1
A 9 0.5 1
B 7.5 0.5 1
C 6 0.5 1
USING CLASS A MIXTURE
VOLUME 10.4625
ASSUME
WIDTH OF STEEL DECK 0.4
HOR LEN 9
QTY OF STEEL DECK 23.5
AVE DIAGONAL 5.64
SAY 6
TOT LEN OF STEEL DECK 141
TOTAL FLOOR AREA #REF!
2000
200
1800
3 16 48
1752
2
876
w1 0.3 0.2 2.33 2500 9.81 3428.595
w2 0.3 0.2 1.75 2500 9.81 2575.125
6003.72
6 KN-M
C1 0.4 0.2 1.75 2500 9.81 3433.5
MM CM 1
MM 10
8.7 CM 1 IN 3.425197
2.54 CM
MATERIALS PRICE LIST
UPDATED AS OF : FEB 3, 2015
REFERENCE JS VEGA
UOM DESCRIPTION
BAGS CEMENT
CUM SAND
CUM GRAVEL
PCS 5" CHB
PCS 10 mm REBAR
PCS 16 mm rebar
PCS 12 mm rebar
PCS 2" X 2" X 3/16"
PCS 2" X 2" X 1/4"
KG TIE WIRE
GAL Epoxy Primer Paint
PCS W 12 X 12 x 45 (COLUMNS)
PCS W 12 X 6 X 45 (BEAMS)
LM .4 x 2.0 mm flat steel deck
PCS 6" X 6" X 1/4" MS PLATE
PCS 2 1/2" GI PIPE
ALLOWANCE 1.05
ALLOWANCE
PRICE
225 1.2
900 1.2
1200 1.05
13 1.2
120 1.1
270 1.05
152 1.05
520 1.1
650 1.1
70 1.05
635 1.05
1700 1.05
435 1.05
6000 1.05
5000 1.05
400 1.05
300 1.05
1900 1.05
STEPS
1 DEAD LOAD
DUE TO SELF WEIGHT
1. SLAB 1
2 LIVE LOAD q
3 DEAD LOAD
LOAD SUMMARY
SECTION BEAM
GRID
1D-3D
3D-4D
STEPS
1 DEAD LOAD
DUE TO SELF WEIGHT
1. SLAB 1
2 LIVE LOAD q
3 DEAD LOAD
LOAD SUMMARY
SECTION BEAM
GRID
1D-2D
2D-3D
3D-4D
PARAMETERS GIVEN SYMBOL UNITS DATA
@ SECTION D--D
Slab Dimentions UNITS BEAM TRIBUT
1D-3D AREA
Depth d meter 0.15
1D-D.5
3D - 3d5
Width (TRIBUTARY AREA) w meter 2.74
Length L meter 5.11
I-Beam Parameters
Size WF 6 X 16
Length meter 0.00
Unit Weight 16 Lbs per ft
23.85 kg per meter
LOAD SUMMARY
@ SECTION D--D
Slab Dimentions UNITS BEAM TRIBUT
1D-2D AREA
Depth d meter 0.15
1E-1D
1D - 1C
Width (TRIBUTARY AREA) w meter 0.00
Length L meter 3.00
I-Beam Parameters
Size WF 6 X 16
Length meter 0.00
Unit Weight 16 Lbs per ft
0.00 kg per meter
LOAD SUMMARY
0.40 0.40
0.20 0.20
1.40 3.40
1.40
1.962 1.962
0.00 0.00 0.00
0.40 0.40
0.20 0.20
1.40 3.40
0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
1.962 1.962
0.00 0.00
1.96 1.96
0.00 0.00
DIV BY 2
4.49 2.245
3.3 1.65
3.895
3.89 2.25
6.84 1.45
6.84 1.45
0.58 0.34
14310.34 8277.19
14.31 8.28
8.17 4.73
22.48 13.00
7.39 4.28
0.00 0.00
22.48 13.00
7.39 4.28
unit CONVERSION UNITS
Acceleration due to gravity 9.81 mtr per sec sqr
Weight of concrete 2500 kg per cu mtr QTY
1
1
VERSION UNITS Wide Flange Beam STANDARDLBS PER KG PER KN PER
SIZE LENGTH WEIGHT MTR METER
UNIT EQ QTY UNIT 6 X 16 6 16 23.85 0.23
6 X 14 6 14 20.87 0.20
MTR 3.28 FT 6 X 12 6 12 17.89 0.18
KG 2.2 LBS 4 X 13 4 13 19.38 0.19
6X9 6 9 13.42 0.13
25 X 25 X 3 mm - 6 M 6.72 kg
25 X 25 X 5 mm - 6 M 10.6 kg
30 X 30 X 3 mm - 6 M 8.16 kg
40 X 40 X 3 mm - 6 M 11 kg
40 X 40 X 4 mm - 6 M 14.5 kg
40 X 40 X 5 mm - 6 M 18 kg
45 X 45 X 4 mm - 6 M 16.44 kg
45 X 45 X 5 mm - 6 M 20.5 kg
50 X 50 X 4 mm - 6 M 18.4 kg
50 X 50 X 5 mm - 6 M 22.5 kg
50 X 50 X 6 mm - 6 M 27.58 kg
60 X 60 X 5 mm - 6 M 27.3 kg
60 X 60 X 6 mm - 6 M 32.52 kg
65 X 65 X 6 mm - 6 M 35.46 kg
70 X 70 X 6 mm - 6 M 38.28 kg
70 X 70 X 7 mm - 6 M 44.28 kg
75 X 75 X 6 mm - 6 M 41.22 kg
75 X 75 X 7 mm - 6 M 45 kg
75 X 75 X 8 mm - 6 M 54.18 kg
75 X 75 X 9 mm - 6 M 59.8 kg
80 X 80 X 8 mm - 6 M 57.96 kg
.1875 .3125 .3750
9.42 27.59 58.1
3/16 5/16 3/8
.2500 .3750 .5000
12.21 32.58 76.07
1/4 3/8 1/2
.3125 .5000 .6250
14.83 42.05 93.34
5/16 1/2 5/8
.3750 .6250 .3125
17.27 50.79 14 x 14 57.36
3/8 5/8 5/16
.5000
21.63
1/2
3 2 in 2.54 cm 5.08 cm
16 1 in
LOAD COMPUTATIONS FOR STAAD FRAME ANALYSIS
2
AT BEAM DEAD LIVE TRIBUTARY AREA
SECTION GRID LEN LOAD LOAD DIM LEFT DIM RIGHT Eff Width (w)
D-D 5D-6D 2 4.67 2.475 1.65 0 0.825
6D - 7D 2 4.67 2.475 1.65 0 0.825
9.35 4.95
7.95 42.02
7.95 42.02
4.05 31.03
6.3 37.37
2.25 25.96
7.5 21.13
3.57 10.06
4.2 11.83
7.2 20.29
4.2 11.83