Sie sind auf Seite 1von 47

COS CONSULTANCY SERVICES

GEO-TECH. ENGINEERING DIVISION

BORE LOG SHEET

Name of Project: "Doubling of track between Trivandrum and Kanyakumari-Conducting Subsoil investigation for major bridges, minor bridges and
along the proposed doubling alignment at specified locations".

Chainage: 221/300 Location BH 7 LHS

Structure & No. Major Bridge -7 RL of Water Table 5.80 m

Type of Boring Rotary Dia of Boring 150 mm

Date of
31.01.17 Total depth 21.50 m
Commencement :

Date of Completion: 01.02.17 RL of NGL 8.80 m


Depth from GL (m)

correction factor in

Due to overburden

Due to diltancy
Reduced Level

pressure in N''
pressure in N'

Type of Samples
Graphic Log

Graphical Representation
of SPT
Type

Cn
15

30

45
Visual soil N N Values
Description

Red coloured sand


5.80 m 3.00 SPT 4 7 11 18 1.20 22 18 D
Red coloured sand
4.30 m 4.50 SPT 5 9 14 23 1.06 24 20 D
Red coloured sand
2.80 m 6.00 SPT 7 9 16 25 0.96 24 20 D
Red coloured sand
1.30 m 7.50 SPT 10 12 20 32 0.89 28 22 D
Red coloured sand
-0.20 m 9.00 SPT 11 14 22 36 0.83 30 22 D
Red coloured sand
-1.70 m 10.50 SPT 15 18 26 44 0.77 34 25 D
Red coloured sand
-3.20 m 12.00 SPT 18 21 28 49 0.73 36 25 D
4 cm Penet for
Red coloured sand
-4.70 m 13.50 SPT 51 blows > 75 0.69 51 33 D
Quartz sand stone 3 cm Penet for
-5.70 m (Residual soil) 14.50 SPT 51 blows > 75 0.66 50 32 D
Quartz sand stone 3 cm Penet for
-7.70 m (Residual soil) 16.50 SPT 51 blows > 75 0.62 46 31 D
Quartz sand stone SPT Hammer
-9.45 m (Residual soil) 18.25 SPT Rebound > 75 0.58 44 29 D
Quartz sand stone SPT Hammer
-11.70 m (Residual soil) 20.50 SPT Rebound > 75 0.54 41 28 D
SPT Hammer
Hard Rock
-12.70 m 21.50 SPT Rebound D

Note :
Bore Hole is Terminated at a depth of 21.50 m Below G.L
D - Disturbed soil sample
RHS- Right Hand Side - Final corrected value after Diltancy correction N''
LHS- Left Hand Side - Observe N Value
BH - Bore Hole , NGL - Natural Ground Level
Soil Profile at Bore Hole - 7 (LHS) Location

Contractor Senior Section Engineer Executive Engineer


COS CONSULTANCY SERVICES
GEO-TECH. ENGINEERING DIVISION

BORE LOG SHEET

Name of Project: "Doubling of track between Trivandrum and Kanyakumari-Conducting Subsoil investigation for major bridges, minor bridges and along
the proposed doubling alignment at specified locations".

Chainage: 221/298 Location BH 8 RHS

Major Bridge -7(old LC


Structure & No. RL of Water Table 4.32 m
gate)
Type of Boring Rotary Dia of Boring 150 mm

Date of
02.02.17 Total depth 21.50 m
Commencement :
Date of
02.02.17 RL of NGL 7.92 m
Completion:

Depth from GL (m)

correction factor in

Due to overburden

Due to diltancy
Reduced Level

pressure in N''
pressure in N'

Type of Samples
Graphical Representation
Graphic Log

Type of SPT

Cn
15

30

45
N N Values
Visual soil Description

Red coloured Sand mixed


4.92 m with Silt & Clay 3.00 SPT 4 6 9 15 1.21 18 17 D
Red coloured Sand mixed
3.42 m with Silt & Clay 4.50 SPT 5 7 11 18 1.06 19 17 D
Red coloured Sand mixed
1.92 m with Silt & Clay 6.00 SPT 7 8 13 21 0.97 20 18 D
Light brown coloured Sand
0.42 m 7.50 SPT 7 9 14 23 0.90 21 18 D
Light brown coloured Sand
-1.08 m 9.00 SPT 18 21 26 47 0.83 39 27 D
7 cm Penet for
Light brown coloured Sand
-2.58 m 10.50 SPT 55 blows > 75 0.78 58 37 D
Quartz sand stone (Residual 6 cm Penet for
-4.08 m soil) 12.00 SPT 55 blows > 75 0.73 55 35 D
Quartz sand stone (Residual 6 cm Penet for
-5.58 m soil) 13.50 SPT 55 blows > 75 0.69 52 33 D
Quartz sand stone (Residual 5 cm Penet for
-6.58 m soil) 14.50 SPT 55 blows > 75 0.67 50 32 D
Quartz sand stone (Residual 4 cm Penet for
-8.58 m soil) 16.50 SPT 55 blows > 75 0.62 47 31 D
Quartz sand stone (Residual SPT Hammer
-10.58 m soil) 18.50 SPT Rebound > 75 0.58 44 29 D
Quartz sand stone (Residual SPT Hammer
-12.58 m soil) 20.50 SPT Rebound > 75 0.55 41 28 D
SPT Hammer
Hard Rock
-13.58 m 21.50 SPT Rebound D

Note :
Bore Hole is Terminated at a depth of 21.50 m Below G.L
D - Disturbed soil sample
RHS- Right Hand Side - Final corrected value after Diltancy correction N''
LHS- Left Hand Side - Observe N Value
BH - Bore Hole , NGL - Natural Ground Level
Soil Profile at Bore Hole - 8 (RHS) Location

Contractor Senior Section Engineer Executive Engineer


COS CONSULTANCY SERVICES
GEO-TECH. ENGINEERING DIVISION

BORE LOG SHEET

Name of Project: "Doubling of track between Trivandrum and Kanyakumari-Conducting Subsoil investigation for major bridges, minor bridges and along
the proposed doubling alignment at specified locations".

Chainage: 221/348 Location BH 9 LHS

Major Bridge -7(Pier-


Structure & No. RL of Water Table 3.31 m
1)
Type of Boring Rotary Dia of Boring 150 mm

Date of
10.02.17 Total depth 9.00 m
Commencement :

Date of Completion: 10.02.17 Depth from GL (m) RL of NGL 3.56 m

correction factor in

Due to overburden

Due to diltancy
Reduced Level

pressure in N''
pressure in N'

Type of Samples
Graphic Log

Graphical Representation
of SPT
Type

Cn
15

30

45
Visual soil N
N Values
Description

Black coloured Silt &


clay mixed with sand
2.06 m 1.50 SPT 3 3 4 7 1.42 10 10 D
Black coloured Silt &
clay mixed with sand
0.56 m 3.00 SPT 3 5 7 12 1.18 14 15 D
Black coloured Silt &
clay mixed with sand
-0.94 m 4.50 SPT 2 3 3 6 1.04 6 6 D
Black coloured Silt &
10 cm Penet for
clay mixed with sand
-2.44 m 6.00 SPT 46 blows > 75 0.95 71 43 D
Quartz sand stone 11 cm Penet for
-3.94 m (Residual soil) 7.50 SPT 51 blows > 75 0.9 65 40 D
Quartz sand stone SPT Hammer
-4.44 m (Residual soil) 8.00 SPT Rebound > 75 0.85 64 39 D

Hard Rock SPT Hammer


-5.44 m 9.00 SPT Rebound D

Note :
Bore Hole is Terminated at a depth of 9.00 m Below G.L
D - Disturbed soil sample
RHS- Right Hand Side - Final corrected value after Diltancy correction N''
LHS- Left Hand Side - Observe N Value
BH - Bore Hole , NGL - Natural Ground Level
Soil Profile at Bore Hole - 9 (LHS) Location

Contractor Senior Section Engineer Executive Engineer


COS CONSULTANCY SERVICES
GEO-TECH. ENGINEERING DIVISION

BORE LOG SHEET

Name of Project: "Doubling of track between Trivandrum and Kanyakumari-Conducting Subsoil investigation for major bridges, minor bridges and along
the proposed doubling alignment at specified locations".

Chainage: 221/337 Location BH 10 LHS

Major Bridge -
Structure & No. RL of Water Table 3.30 m
7(Pier-2)
Type of Boring Rotary Dia of Boring 150 mm

Date of
11.02.17 Total depth 9.00 m
Commencement :

Date of Completion: 11.02.17 RL of NGL 3.65 m


Depth from GL (m)

correction factor in

Due to overburden

Due to diltancy
Reduced Level

pressure in N''
pressure in N'

Type of Samples
Graphical Representation
Graphic Log

of SPT
Type

Cn
15

30

45
Visual soil N
N Values
Description

Light yellow
2.15 m coloured sand 1.50 SPT 3 2 1 3 1.44 4 4 D
Light yellow
0.65 m coloured sand 3.00 SPT 3 3 2 5 1.20 6 6 D
Light yellow
-0.85 m coloured sand 4.50 SPT 2 3 4 7 1.07 7 7 D
Light yellow 7 cm Penet for
-2.35 m coloured sand 6.00 SPT 55 blows > 75 0.97 73 44 D
Quartz sand stone 8 cm Penet for
-2.85 m (Residual soil) 6.50 SPT 51 blows > 75 0.94 71 43 D
Quartz sand stone
-4.35 m (Residual soil) 8.00 SPT SPT Hammer Rebound > 75 0.87 65 40 D

Hard Rock
-5.35 m 9.00 SPT SPT Hammer Rebound D

Note :
Bore Hole is Terminated at a depth of 9.00 m Below G.L
D - Disturbed soil sample
RHS- Right Hand Side - Final corrected value after Diltancy correction N''
LHS- Left Hand Side - Observe N Value
BH - Bore Hole , NGL - Natural Ground Level
Soil Profile at Bore Hole - 10 (LHS) Location

Contractor Senior Section Engineer Executive Engineer


COS CONSULTANCY SERVICES
GEO-TECH. ENGINEERING DIVISION

BORE LOG SHEET

Name of Project: "Doubling of track between Trivandrum and Kanyakumari-Conducting Subsoil investigation for major bridges, minor bridges and along
the proposed doubling alignment at specified locations".

Chainage: 221/336 Location BH 11 RHS

Major Bridge -
Structure & No. RL of Water Table 3.04 m
7(Pier-3)
Type of Boring Rotary Dia of Boring 150 mm

Date of
13.02.17 Total depth 10.20 m
Commencement :

Date of Completion: 14.02.17 RL of NGL 3.34 m


Depth from GL (m)

correction factor in

Due to overburden

Due to diltancy
Reduced Level

pressure in N''
pressure in N'

Type of Samples
Graphic Log

Graphical Representation
of SPT
Type

Cn
15

30

45
Visual soil N N Values
Description

Blackish white
1.84 m coloured sand 1.50 SPT 2 1 1 2 1.43 3 3 D
Blackish White
0.34 m coloured Sand 3.00 SPT 6 4 5 9 1.20 11 11 D
Light brown coloured
-1.16 m sand 4.50 SPT 2 4 8 12 1.06 13 13 D
Light brown coloured
-2.66 m sand 6.00 SPT 5 5 2 7 0.97 7 7 D
Quartz sand stone 1 cm Penet for
-3.16 m (Residual soil) 6.50 SPT 46 blows > 75 0.94 71 43 D
Quartz sand stone 11 cm Penet for
-4.16 m (Residual soil) 7.50 SPT 46 blows > 75 0.89 67 41 D
Quartz sand stone 2 cm Penet for
-5.66 m (Residual soil) 9.00 SPT 46 blows > 75 0.83 62 39 D

Hard Rock SPT Hammer


-6.86 m 10.20 SPT Rebound D

Note :
Bore Hole is Terminated at a depth of 10.20 m Below G.L
D - Disturbed soil sample
RHS- Right Hand Side - Final corrected value after Diltancy correction N''
LHS- Left Hand Side - Observe N Value
BH - Bore Hole , NGL - Natural Ground Level
Soil Profile at Bore Hole - 11 (RHS) Location

Contractor Senior Section Engineer Executive Engineer


COS CONSULTANCY SERVICES
GEO-TECH. ENGINEERING DIVISION

BORE LOG SHEET

Name of Project: "Doubling of track between Trivandrum and Kanyakumari-Conducting Subsoil investigation for major bridges, minor bridges and
along the proposed doubling alignment at specified locations".

Chainage: 221/347 Location BH 12 RHS

Major Bridge -
Structure & No. RL of Water Table 2.97 m
7(Pier-4)
Type of Boring Rotary Dia of Boring 150 mm
Date of
14.02.17 Total depth 10.50 m
Commencement :
Date of
15.02.17 RL of NGL 3.35 m
Completion:
Depth from GL (m)

correction factor in

Due to overburden

Due to diltancy
Reduced Level

pressure in N''
pressure in N'

Type of Samples
Graphic Log

Graphical Representation
of SPT
Type

Cn
15

30

45
Visual soil N N Values
Description

Brown coloured
1.85 m sand 1.50 SPT 1 3 6 9 1.44 13 13 D
Light brown
0.35 m coloured sand 3.00 SPT 7 9 10 19 1.20 23 19 D
Light brown 2 cm Penet for
-1.15 m coloured sand 4.50 SPT 40 blows > 75 1.06 80 47 D
Light brown 5 cm Penet for
-2.85 m coloured sand 6.20 SPT 39 blows > 75 0.95 71 43 D
Light brown 4 cm Penet for
-4.15 m coloured sand 7.50 SPT 51 blows > 75 0.89 67 41 D
Quartz sand stone 2 cm Penet for
-6.15 m (Residual soil) 9.50 SPT 51 blows > 75 0.81 60 38 D

Hard Rock
-7.15 m 10.50 SPT SPT Hammer Rebound D

Note :
Bore Hole is Terminated at a depth of 10.50 m Below G.L
D - Disturbed soil sample
RHS- Right Hand Side - Final corrected value after Diltancy correction N''
LHS- Left Hand Side - Observe N Value
BH - Bore Hole , NGL - Natural Ground Level
Soil Profile at Bore Hole - 12 (RHS) Location

Contractor Senior Section Engineer Executive Engineer


COS CONSULTANCY SERVICES
GEO-TECH. ENGINEERING DIVISION

BORE LOG SHEET

Name of Project: "Doubling of track between Trivandrum and Kanyakumari-Conducting Subsoil investigation for major bridges, minor bridges and along
the proposed doubling alignment at specified locations".

Chainage: 221/367 Location BH 13

Major Bridge -
Structure & No. RL of Water Table 3.97 m
7(A1)
Type of Boring Rotary Dia of Boring 150 mm

Date of
02.02.17 Total depth 19.70 m
Commencement :
Date of
03.02.17 RL of NGL 7.72 m
Completion: Depth from GL (m)

correction factor in

Due to overburden

Due to diltancy
Reduced Level

pressure in N''
pressure in N'

Type of Samples
Graphic Log

Graphical Representation
of SPT
Type

Cn
15

30

45
Visual soil N N Values
Description

Red coloured Silt &


4.72 m Clay mixed with Sand 3.00 SPT 5 5 7 D
12 1.21 15 15
Red coloured Sand
3.22 m 4.50 SPT 5 7 9 16 1.11 18 16 D
Red coloured Sand
1.72 m 6.00 SPT 7 10 12 22 1.05 23 19 D
Light yellow coloured
0.22 m sand 7.50 SPT 9 12 13 25 1.01 25 20 D
Light yellow coloured
-1.28 m sand 9.00 SPT 11 14 17 31 0.96 30 22 D
Light yellow coloured
-2.78 m sand 10.50 SPT 13 19 21 40 0.92 37 26 D
Light yellow coloured 6 cm Penet for
-4.28 m sand 12.00 SPT 51 blows > 75 0.89 67 41 D
Light yellow coloured 5 cm Penet for
-5.78 m sand 13.50 SPT 51 blows > 75 0.86 64 40 D
Quartz sand stone 5 cm Penet for
-6.78 m (Residual soil) 14.50 SPT 51 blows > 75 0.84 63 39 D
Quartz sand stone 4 cm Penet for
-7.28 m (Residual soil) 15.00 SPT 51 blows > 75 0.83 62 38 D
Quartz sand stone 4 cm Penet for
-8.78 m (Residual soil) 16.50 SPT 51 blows > 75 0.80 60 37 D
Quartz sand stone 4 cm Penet for
-10.28 m (Residual soil) 18.00 SPT 51 blows > 75 0.77 58 36 D
Quartz sand stone SPT Hammer
-11.98 m (Residual soil) 19.70 SPT Rebound > 75 0.75 56 35 D

Note :
Bore Hole is Terminated at a depth of 19.70 m Below G.L
D - Disturbed soil sample
RHS- Right Hand Side - Final corrected value after Diltancy correction N''
LHS- Left Hand Side - Observe N Value
BH - Bore Hole , NGL - Natural Ground Level
Soil Profile at Bore Hole - 13 Location

Contractor Senior Section Engineer Executive Engineer


COS CONSULTANCY SERVICES
GEO-TECH. ENGINEERING DIVISION

BORE LOG SHEET

Name of Project: "Doubling of track between Trivandrum and Kanyakumari-Conducting Subsoil investigation for major bridges, minor bridges and along
the proposed doubling alignment at specified locations".

Chainage: 221/371 Location BH 14 RHS

Structure & No. Major Bridge -7(A-2) RL of Water Table 2.11 m

Type of Boring Rotary Dia of Boring 150 mm


Date of
04.02.17 Total depth 21.30 m
Commencement :
Date of
04.02.17 RL of NGL 7.31 m
Completion:

Due to overburden
correction factor
Depth from GL

Type of Samples
Due to diltancy
Reduced Level

pressure in N''
pressure in N'
Graphic Log

Graphical Representation

in Cn
Type
(m) of SPT

15

30

45
N
Visual soil Description N Values

Red coloured Sand mixed


4.31 m with silt & clay 3.00 SPT 5 7 7 D
14 1.20 17 16
Red coloured Sand mixed
2.81 m with silt & clay 4.50 SPT 5 6 9 D
15 1.06 16 15
Light yellow coloured Sand
1.31 m mixed with silt & clay 6.00 SPT 7 8 10 D
18 0.99 18 16
Light yellow coloured Sand
-0.19 m mixed with silt & clay 7.50 SPT 9 11 13 D
24 0.95 23 19
Light yellow coloured Sand
-1.69 m mixed with silt & clay 9.00 SPT 11 12 15 D
27 0.91 25 20
Light yellow coloured Silt &
-3.19 m clay 10.50 SPT 13 16 18 D
34 0.88 30 22

Light yellow coloured Sand


-4.69 m 12.00 SPT 13 19 21 40 0.84 34 24 D

Light yellow coloured Sand


-6.19 m 13.50 SPT 15 17 21 38 0.82 31 23 D

Light yellow coloured Sand


-7.19 m 14.50 SPT 17 21 26 47 0.80 38 26 D
4 cm Penet for
Weathered Rock
-7.69 m 15.00 SPT 51 blows > 75 0.79 59 37 D
3 cm Penet for
Weathered Rock
-10.69 m 18.00 SPT 51 blows > 75 0.74 56 35 D
SPT Hammer
Weathered Rock
-12.99 m 20.30 SPT Rebound > 75 0.71 53 34
SPT Hammer
Hard Rock
-13.99 m 21.30 SPT Rebound

Note :
Bore Hole is Terminated at a depth of 21.30 m Below G.L
D - Disturbed soil sample
RHS- Right Hand Side - Final corrected value after Diltancy correction N''
LHS- Left Hand Side - Observe N Value
BH - Bore Hole , NGL - Natural Ground Level
Soil Profile at Bore Hole - 14 (RHS) Location

Contractor Senior Section Engineer Executive Engineer


COS CONSULTANCY SERVICES
GEO-TECH. ENGINEERING DIVISION

BORE LOG SHEET

Name of Project: "Doubling of track between Trivandrum and Kanyakumari-Conducting Subsoil investigation for major bridges, minor bridges and
along the proposed doubling alignment at specified locations".

Chainage: 221/380 Location BH 14A LHS

Structure & No. Major Bridge -7(A2) RL of Water Table 0.82 m

Type of Boring Rotary Dia of Boring 150 mm

Date of
06.02.17 Total depth 17.00 m
Commencement :
Date of
08.02.17 RL of NGL 5.02 m
Completion:

correction factor in

Due to overburden
Depth from GL

Due to diltancy
Reduced Level

pressure in N''
pressure in N'

Type of Samples
Graphical Representation
Graphic Log

of SPT
Type
(m)

Cn
15

30

45
Visual soil N N Values
Description

Grey coloured Sand


3.52 m 1.50 SPT 2 3 5 8 1.43 11 11 D
Grey coloured Sand
2.02 m 3.00 SPT 1 1 1 2 1.19 2 2 D
Grey coloured Sand
0.52 m 4.50 SPT 10 9 7 16 1.05 17 16 D
Grey coloured Sand
-0.98 m 6.00 SPT 6 6 6 12 0.96 12 12 D
Grey coloured Sand
-2.48 m 7.50 SPT 13 15 11 26 0.89 23 19 D
Grey coloured Sand
-3.98 m 9.00 SPT 8 5 5 10 0.83 8 8 D
Quartz sand stone 2 cm Penet for
-5.48 m (Residual soil) 10.50 SPT 41 blows > 75 0.77 58 37 D
Quartz sand stone SPT Hammer
-7.48 m (Residual soil) 12.50 SPT Rebound > 75 0.71 54 34 D
Quartz sand stone SPT Hammer
-7.98 m (Residual soil) 13.00 SPT Rebound > 75 0.70 53 34 D
Quartz sand stone SPT Hammer
-8.98 m (Residual soil) 14.00 SPT Rebound > 75 0.68 51 33 D
Quartz sand stone SPT Hammer
-10.98 m (Residual soil) 16.00 SPT Rebound > 75 0.63 47 31 D
Quartz sand stone SPT Hammer
-11.98 m (Residual soil) 17.00 SPT Rebound > 75 0.61 46 30

Note :
Bore Hole is Terminated at a depth of 17.00 m Below G.L
D - Disturbed soil sample
RHS- Right Hand Side - Final corrected value after Diltancy correction N''
LHS- Left Hand Side - Observe N Value
BH - Bore Hole , NGL - Natural Ground Level

Soil Profile at Bore Hole - 14 A Location

Contractor Senior Section Engineer Executive Engineer


COS CONSULTANCY SERVICES
GEO-TECH. ENGINEERING DIVISION

BORE LOG SHEET

Name of Project: "Doubling of track between Trivandrum and Kanyakumari-Conducting Subsoil investigation for major bridges, minor bridges and along the proposed
doubling alignment at specified locations".

Chainage: 224/115 Location BH 43 RHS

Bridge No-18
Structure & No. RL of Water Table -4.99 m
(Abutment No. 1)

Type of Boring Rotary Dia of Boring 150 mm

Date of
09.02.17 Total depth 30.00 m
Commencement:

Date of Completion: 10.02.17 RL of NGL 4.51 m

Due to diltancy pressure


correction factor in Cn
Depth from GL (m)

Due to overburden
Reduced Level

pressure in N'
Graphical Representation
Graphic Log

of SPT

Type of Samples
in N''
Type

15

30

45
N
Visual soil Description N Values

Light Brown coloured Sand


3.01 m 1.50 SPT 3 5 5 10 1.44 14 14 D
Light Brown coloured Sand
1.51 m 3.00 SPT 4 5 5 10 1.20 12 12 D
Light Brown coloured Sand
0.01 m 4.50 SPT 4 6 5 11 1.07 12 12 D
Light Brown coloured Sand
-1.49 m 6.00 SPT 6 7 7 14 0.97 14 14 D
Light Brown Coloured Silt &
-2.99 m Clay 7.50 SPT 8 9 11 20 0.89 18 16 D
Light Brown Coloured Silt &
-4.49 m Clay 9.00 SPT 7 9 13 22 0.83 18 17 D
Light Brown coloured Sand
-5.49 m 10.00 SPT 9 12 15 27 0.80 22 18 D
Quartz Sand stone (Residual
-7.49 m soil) 12.00 SPT 11 14 16 30 0.73 22 18 D
Quartz Sand stone (Residual
-8.99 m soil) 13.50 SPT 13 16 19 35 0.69 24 20 D
Quartz Sand stone (Residual
-10.49 m soil) 15.00 SPT 15 15 21 36 0.66 24 19 D
Quartz Sand stone (Residual
-11.99 m soil) 16.50 SPT 17 19 24 43 0.63 27 21 D
Quartz Sand stone (Residual
-13.49 m soil) 18.00 SPT 18 22 27 49 0.60 29 22 D
Quartz Sand stone (Residual 6 cm Penet for
-15.29 m soil) 19.80 SPT 51 blows > 75 0.56 42 29 D
Quartz Sand stone (Residual 6 cm Penet for
-16.49 m soil) 21.00 SPT 51 blows > 75 0.54 41 28 D
Quartz Sand stone (Residual 5 cm Penet for
-18.99 m soil) 23.50 SPT 51 blows > 75 0.50 38 26 D
Quartz Sand stone (Residual 4 cm Penet for
-20.49 m soil) 25.00 SPT 51 blows > 75 0.48 36 26 D
Quartz Sand stone (Residual 4 cm Penet for
-21.99 m soil) 26.50 SPT 51 blows > 75 0.46 35 25 D
Quartz Sand stone (Residual 3 cm Penet for
-22.99 m soil) 27.50 SPT 51 blows > 75 0.45 34 24 D
Quartz Sand stone (Residual
-24.29 m soil) 28.80 SPT SPT Hammer Rebound > 75 0.44 33 24 D

Hard Rock
-25.49 m 30.00 SPT SPT Hammer Rebound

Note :
Bore Hole is Terminated at a depth of 30.00 m Below G.L
D - Disturbed soil sample
RHS- Right Hand Side - Final corrected value after Diltancy correction N''

LHS- Left Hand Side - Observe N Value

BH - Bore Hole , NGL - Natural Ground Level


Soil Profile at Bore Hole - 43 (RHS) Location

Contractor Senior Section Engineer Executive Engineer


COS CONSULTANCY SERVICES
GEO-TECH. ENGINEERING DIVISION

BORE LOG SHEET

Name of Project: "Doubling of track between Trivandrum and Kanyakumari-Conducting Subsoil investigation for major bridges, minor bridges and along the
proposed doubling alignment at specified locations".

Chainage: 224/132 Location BH 44 RHS

Structure & No. Bridge No-18 Pier-1 RL of Water Table 0.48 m

Type of Boring Rotary Dia of Boring 150 mm

Date of
11.02.17 Total depth 25.00 m
Commencement :
Date of
13.02.17 RL of NGL 1.68 m
Completion:

Depth from GL (m)

correction factor in

Due to overburden

Due to diltancy
Reduced Level

pressure in N''
pressure in N'
Graphic Log

Type of Samples
Graphical Representation
of SPT
Type

Cn
15

30

45
N
Visual soil Description N Values

Light Brown coloured Sand


0.18 m 1.50 SPT 2 3 5 8 1.44 12 11 D
Light Brown coloured Sand
-1.32 m 3.00 SPT 5 5 7 12 1.20 14 14 D
Light Brown coloured Sand
-2.82 m 4.50 SPT 4 6 6 12 1.05 13 13 D
Light Brown coloured Sand
-4.32 m 6.00 SPT 5 7 9 16 0.96 15 15 D
Grey coloured Sand
-5.82 m 7.50 SPT 7 9 11 20 0.89 18 16 D
Grey coloured Sand
-7.32 m 9.00 SPT 8 12 13 25 0.82 21 18 D
Grey coloured Sand
-8.32 m 10.00 SPT 8 12 15 27 0.79 21 18 D
Quartz sand soil (Residual
-10.32 m soil) 12.00 SPT 11 13 17 30 0.72 22 18 D
Quartz sand soil (Residual
-12.32 m soil) 14.00 SPT 15 17 21 38 0.67 26 20 D
Quartz sand soil (Residual
-13.82 m soil) 15.50 SPT 13 16 19 35 0.64 22 19 D
Quartz sand soil (Residual 12 cm Penet for
-15.32 m soil) 17.00 SPT 51 blows > 75 0.61 46 30 D
Quartz sand soil (Residual 11 cm Penet for
-16.82 m soil) 18.50 SPT 51 blows > 75 0.58 44 29 D
Quartz sand soil (Residual 10 cm Penet for
-18.32 m soil) 20.00 SPT 51 blows > 75 0.55 41 28 D
Quartz sand soil (Residual 8 cm Penet for
-20.82 m soil) 22.50 SPT 51 blows > 75 0.51 38 27 D
Quartz sand soil (Residual
-22.32 m soil) 24.00 SPT SPT Hammer Rebound > 75 0.49 37 26 D
Hard Rock
-23.32 m 25.00 SPT SPT Hammer Rebound

Note :
Bore Hole is Terminated at a depth of 25.00 m Below G.L
D - Disturbed soil sample
RHS- Right Hand Side - Final corrected value after Diltancy correction N''
LHS- Left Hand Side - Observe N Value
BH - Bore Hole , NGL - Natural Ground Level
Soil Profile at Bore Hole - 44 (RHS) Location

Contractor Senior Section Engineer Executive Engineer


COS CONSULTANCY SERVICES
GEO-TECH. ENGINEERING DIVISION

BORE LOG SHEET

Name of Project: "Doubling of track between Trivandrum and Kanyakumari-Conducting Subsoil investigation for major bridges, minor bridges and along the
proposed doubling alignment at specified locations".

Chainage: 224/088 Location BH 45 LHS

Structure & No. Bridge No-18 RL of Water Table 4.72 m


Type of Boring Rotary Dia of Boring 150 mm
Date of
14.02.17 Total depth 25.60 m
Commencement:
Date of
15.02.17 RL of NGL 6.92 m
Completion:

Depth from GL (m)

correction factor in

Due to overburden

Due to diltancy
Reduced Level

pressure in N''
pressure in N'
Graphic Log

Type of Samples
Graphical Representation

Type
of SPT

Cn
15

30

45
N
Visual soil Description N Values

Brown coloured Sand


5.42 m 1.50 SPT 2 2 4 6 1.44 9 9 D
Brown coloured Sand
3.92 m 3.00 SPT 3 3 4 7 1.21 8 8 D
Brown coloured Sand
2.42 m 4.50 SPT 4 6 6 12 1.07 13 13 D
Brown coloured Sand
0.92 m 6.00 SPT 5 8 9 17 0.97 17 16 D
Brown coloured Sand
-0.58 m 7.50 SPT 7 8 11 19 0.89 17 16 D
Brown coloured Sand
-2.08 m 9.00 SPT 9 11 14 25 0.83 21 18 D
Red coloured Silt & Clay
-3.58 m mixed with Sand 10.50 SPT 9 13 16 29 0.77 22 19 D
Red coloured Silt & Clay
-5.08 m mixed with Sand 12.00 SPT 12 15 17 32 0.73 23 19 D
Red coloured Silt & Clay
-6.58 m mixed with Sand 13.50 SPT 14 18 20 D
38 0.69 26 21
Red coloured Silt & Clay
-8.08 m mixed with Sand 15.00 SPT 17 21 23 D
44 0.65 29 22
Red coloured Silt & Clay
-9.58 m with Sand 16.50 SPT 19 24 25 49 0.62 30 23 D
Red coloured Silt & Clay
-11.08 m with Sand 18.00 SPT 21 26 27 53 0.59 31 23 D
5 cm Penet for
Weathered Rock
-12.58 m 19.50 SPT 51 blows > 75 0.56 42 29 D
3 cm Penet for
Weathered Rock
-14.08 m 21.00 SPT 51 blows > 75 0.54 40 28 D
Weathered Rock
-15.58 m 22.50 SPT SPT Hammer Rebound > 75 0.52 39 27 D
Weathered Rock
-17.48 m 24.40 SPT SPT Hammer Rebound > 75 0.49 37 26 D
Hard Rock
-18.68 m 25.60 SPT SPT Hammer Rebound

Note :
Bore Hole is Terminated at a depth of 25.60 m Below G.L
D - Disturbed soil sample
RHS- Right Hand Side - Final corrected value after Diltancy correction N''
LHS- Left Hand Side - Observe N Value
BH - Bore Hole , NGL - Natural Ground Level
Soil Profile at Bore Hole - 45 (LHS) Location

Contractor Senior Section Engineer Executive Engineer


COS CONSULTANCY SERVICES
GEO-TECH. ENGINEERING DIVISION

BORE LOG SHEET

Name of Project: "Doubling of track between Trivandrum and Kanyakumari-Conducting Subsoil investigation for major bridges, minor bridges and along
the proposed doubling alignment at specified locations".

Chainage: 224/226 Location BH 46 RHS

Bridge No-18 (Abutment


Structure & No. RL of Water Table 3.53 m
No. 2)

Type of Boring Rotary Dia of Boring 150 mm

Date of
25.02.17 Total depth 24.00 m
Commencement:
Date of
28.02.17 RL of NGL 6.03 m
Completion:
Depth from GL (m)

correction factor in

Due to overburden

Due to diltancy
pressure in N''
Reduced Level

pressure in N'

Type of Samples
Graphic Log

Graphical
Type Representation of SPT

Cn
15

30

45
N
Visual soil Description N Values

Red coloured Sand mixed with


4.53 m Silt & clay 1.50 SPT 2 3 2 5 1.42 7 7 D
Red coloured Silt & clay mixed
3.03 m with Sand 3.00 SPT 3 4 5 9 1.19 11 11 D
Red coloured Silt & clay mixed
1.53 m with Sand 4.50 SPT 3 5 6 11 1.05 12 12 D
Red coloured Sand mixed with
0.03 m Silt & clay 6.00 SPT 4 6 6 12 0.95 11 12 D
Red coloured Sand mixed with
-1.48 m Silt & clay 7.50 SPT 5 5 6 11 0.88 10 10 D
Red coloured Silt & clay mixed
-2.98 m with Sand 9.00 SPT 5 6 7 13 0.82 11 10 D
Light yellow coloured sand
-4.48 m 10.50 SPT 6 7 8 15 0.77 12 11 D
Light yellow coloured sand
-5.98 m 12.00 SPT 7 8 9 17 0.72 12 12 D
Light yellow coloured sand 6 20 0.68 14 13
-7.48 m 13.50 SPT 9 11 D
7cm Penet for
Quartz sand stone (Residual soil) > 75 0.65 49 32
-8.98 m 15.00 SPT 54 blows D
9cm Penet for
Quartz sand stone (Residual soil) > 75 0.62 46 31
-10.48 m 16.50 SPT 57 blows D
8cm Penet for
Quartz sand stone (Residual soil) > 75 0.59 44 30
-11.98 m 18.00 SPT 57 blows D
7cm Penet for
Quartz sand stone (Residual soil) > 75 0.56 42 29
-13.48 m 19.50 SPT 51 blows D
4cm Penet for
Quartz sand stone (Residual soil) > 75 0.53 40 28
-14.98 m 21.00 SPT 51 blows D
3cm Penet for
Quartz sand stone (Residual soil) > 75 0.51 38 27
-16.48 m 22.50 SPT 51 blows D
3cm Penet for
Quartz sand stone (Residual soil) > 75 0.51 38 26
-16.98 m 23.00 SPT 51 blows D
SPT Hammer
Hard Rock
-17.98 m 24.00 SPT Rebound

Note :
Bore Hole is Terminated at a depth of 24.00 m Below G.L
D - Disturbed soil sample
RHS- Right Hand Side - Final corrected value after Diltancy correction N''
LHS- Left Hand Side - Observe N Value
BH - Bore Hole , NGL - Natural Ground Level
Soil Profile at Bore Hole - 46(RHS) Location

Contractor Senior Section Engineer Executive Engineer


COS CONSULTANCY SERVICES
GEO-TECH. ENGINEERING DIVISION

BORE LOG SHEET

Name of Project: "Doubling of track between Trivandrum and Kanyakumari-Conducting Subsoil investigation for major bridges, minor bridges and along
the proposed doubling alignment at specified locations".

Chainage: 224/136 Location BH 48 LHS

Bridge No-18 (Pier


Structure & No. RL of Water Table -1.08 m
No. 1)
Type of Boring Rotary Dia of Boring 150 mm

Date of
03.03.17 Total depth 21.50 m
Commencement:
Date of
04.03.17 RL of NGL - 0.83 m
Completion: Depth from GL (m)

correction factor in

Due to overburden

Due to diltancy
Reduced Level

pressure in N''
pressure in N'

Type of Samples
Graphic Log

Graphical Representation
of SPT
Type

Cn
15

30

45
Visual soil N N Values
Description

Light brown coloured


-5.33 m sand 4.50 SPT 8 11 13 24 1.06 26 20 D
Light brown coloured
-6.83 m sand 6.00 SPT 11 13 5 18 0.97 17 14 D
Light brown coloured
-8.33 m sand 7.50 SPT 13 16 18 34 0.89 30 23 D
Light brown coloured
-9.83 m sand 9.00 SPT 15 17 21 38 0.83 31 23 D
Light brown coloured
-11.33 m sand 10.50 SPT 18 22 25 47 0.78 36 26 D
Quartz sand stone 6cm Penet for
-12.83 m (Residual soil) 12.00 SPT 51 blows > 75 0.73 55 35 D
Quartz sand stone 4cm Penet for
-14.33 m (Residual soil) 13.50 SPT 51 blows > 75 0.69 52 33 D
Quartz sand stone 4cm Penet for
-15.83 m (Residual soil) 15.00 SPT 51 blows > 75 0.66 49 32 D
Quartz sand stone 3cm Penet for
-17.83 m (Residual soil) 17.00 SPT 51 blows > 75 0.61 46 31 D
Quartz sand stone 3cm Penet for
-19.33 m (Residual soil) 18.50 SPT 51 blows > 75 0.58 44 29 D
Quartz sand stone
-21.13 m (Residual soil) 20.30 SPT SPT Hammer Rebound > 75 0.55 41 28 D

Hard Rock
-22.33 m 21.50 SPT SPT Hammer Rebound

Note :
Bore Hole is Terminated at a depth of 21.50 m Below G.L
D - Disturbed soil sample
RHS- Right Hand Side - Final corrected value after Diltancy correction N''
LHS- Left Hand Side - Observe N Value
BH - Bore Hole , NGL - Natural Ground Level
Soil Profile at Bore Hole - 48(LHS) Location

Contractor Senior Section Engineer Executive Engineer


COS CONSULTANCY SERVICES
GEO-TECH. ENGINEERING DIVISION

BORE LOG SHEET

Name of Project: "Doubling of track between Trivandrum and Kanyakumari-Conducting Subsoil investigation for major bridges, minor bridges and along
the proposed doubling alignment at specified locations".

Chainage: 224/155 Location BH 49 LHS

Bridge No-18
Structure & No. RL of Water Table -1.31 m
(Pier No. 2)
Type of Boring Rotary Dia of Boring 150 mm

Date of
06.03.17 Total depth 21.30 m
Commencement:

Date of Completion: 07.03.17 Rl ground level -1.03 m


Depth from GL (m)

correction factor in

Due to overburden

Due to diltancy
Reduced Level

pressure in N''
pressure in N'

Type of Samples
Graphic Log

Graphical Representation
of SPT
Type

Cn
15

30

45
Visual soil N N Values
Description

Light brown
-5.53 m coloured sand 4.50 SPT 9 12 14 26 1.07 28 21 D
Light brown
-7.03 m coloured sand 6.00 SPT 11 14 16 30 0.97 29 22 D
Light brown
-8.03 m coloured sand 7.00 SPT 10 15 18 33 0.92 30 23 D
Light brown
-10.03 m coloured sand 9.00 SPT 15 17 20 37 0.84 31 23 D
Light brown
-11.53 m coloured sand 10.50 SPT 11 21 25 46 0.78 36 25 D

Weathered Rock
-13.03 m 12.00 SPT 18 23 27 50 0.74 37 26 D

Weathered Rock 9cm Penet for


-14.53 m 13.50 SPT 51 blows > 75 0.70 52 34 D

Weathered Rock 9cm Penet for


-16.03 m 15.00 SPT 51 blows > 75 0.66 49 32 D

Weathered Rock 6cm Penet for


-17.53 m 16.50 SPT 51 blows > 75 0.63 47 31 D

Weathered Rock 5cm Penet for


-19.03 m 18.00 SPT 51 blows > 75 0.59 45 30 D

Weathered Rock 4cm Penet for


-21.13 m 20.10 SPT 51 blows > 75 0.56 42 28 D

Hard Rock
-22.33 m 21.30 SPT SPT Hammer Rebound

Note :
Bore Hole is Terminated at a depth of 21.30 m Below G.L
D - Disturbed soil sample
RHS- Right Hand Side - Final corrected value after Diltancy correction N''
LHS- Left Hand Side - Observe N Value
BH - Bore Hole , NGL - Natural Ground Level
Soil Profile at Bore Hole - 49(LHS) Location

Contractor Senior Section Engineer Executive Engineer


COS CONSULTANCY SERVICES
GEO-TECH. ENGINEERING DIVISION

BORE LOG SHEET

Name of Project: "Doubling of track between Trivandrum and Kanyakumari-Conducting Subsoil investigation for major bridges, minor bridges and along
the proposed doubling alignment at specified locations".

Chainage: 224/176 Location BH 50 LHS

Bridge No-18 (Pier


Structure & No. RL of Water Table -1.52 m
No. 3)
Type of Boring Rotary Dia of Boring 150 mm

Date of
08.03.17 Total depth 21.30 m
Commencement:
Date of Completion: 09.03.17 RL of NGL -1.21 m
Depth from GL (m)

correction factor in

Due to overburden

Due to diltancy
Reduced Level

pressure in N''
pressure in N'

Type of Samples
Graphic Log

Graphical Representation
of SPT
Type

Cn
15

30

45
Visual soil N
Description N Values

Light brown coloured


-5.71 m sand 4.50 SPT 7 9 11 20 1.06 21 18 D
Light brown coloured
-7.21 m sand 6.00 SPT 8 11 13 24 0.97 23 19 D
Light brown coloured
-8.71 m sand 7.50 SPT 10 13 15 28 0.89 25 20 D
Light brown coloured
-10.21 m sand 9.00 SPT 12 16 17 33 0.83 27 21 D
Light brown coloured
-11.71 m sand 10.50 SPT 14 18 21 39 0.78 30 23 D
Quartz sand stone 9cm Penet for
-13.21 m (Residual soil) 12.00 SPT 51 blows > 75 0.73 55 35 D
Quartz sand stone 8cm Penet for
-14.71 m (Residual soil) 13.50 SPT 51 blows > 75 0.69 52 33 D
Quartz sand stone 8cm Penet for
-16.21 m (Residual soil) 15.00 SPT 51 blows > 75 0.65 49 32 D
Quartz sand stone 7cm Penet for
-17.71 m (Residual soil) 16.50 SPT 51 blows > 75 0.62 47 31 D
Quartz sand stone 7cm Penet for
-19.21 m (Residual soil) 18.00 SPT 51 blows > 75 0.59 44 30 D
Quartz sand stone SPT Hammer
-21.51 m (Residual soil) 20.30 SPT Rebound > 75 0.55 41 28 D

Hard Rock SPT Hammer


-22.51 m 21.30 SPT Rebound

Note :
Bore Hole is Terminated at a depth of 21.30 m Below G.L
D - Disturbed soil sample
RHS- Right Hand Side - Final corrected value after Diltancy correction N''
LHS- Left Hand Side - Observe N Value
BH - Bore Hole , NGL - Natural Ground Level
Soil Profile at Bore Hole - 50 (LHS) Location

Contractor Senior Section Engineer Executive Engineer


COS CONSULTANCY SERVICES
GEO-TECH. ENGINEERING DIVISION

BORE LOG SHEET

Name of Project: "Doubling of track between Trivandrum and Kanyakumari-Conducting Subsoil investigation for major bridges, minor bridges and
along the proposed doubling alignment at specified locations".

Chainage: 224/198 Location BH 51 LHS

Structure & No. Bridge No-18 RL of Water Table 2.94 m

Type of Boring Rotary Dia of Boring 150 mm

Date of
13.02.17 Total depth 24.00 m
Commencement:
Date of
14.02.17 RL of NGL 6.54 m
Completion:

Depth from GL (m)

correction factor in

Due to overburden

Due to diltancy
Reduced Level

pressure in N''
pressure in N'
Graphic Log

Type of Samples
Graphical Representation
of SPT
Type

Cn
15

30

45
N
Visual soil Description
N Values

Brown coloured Sand mixed


5.04 m with Silt & Clay 1.50 SPT 1 1 2 3 1.43 4 10 D
Brown coloured Sand mixed
3.54 m with Silt & Clay 3.00 SPT 2 3 3 6 1.20 7 11 D
Brown coloured Sand mixed
2.04 m with Silt & Clay 4.50 SPT 3 4 5 9 1.06 10 12 D
Brown coloured Sand mixed
0.54 m with Silt & Clay 6.00 SPT 4 5 5 10 0.97 10 12 D
Brown coloured Sand mixed
-0.97 m with Silt & Clay 7.50 SPT 5 6 7 13 0.89 12 13 D
Brown coloured Sand mixed
-2.47 m with Silt & Clay 9.00 SPT 8 11 13 24 0.83 20 17 D
Light brown coloured Sand
-3.97 m 10.50 SPT 10 13 18 31 0.78 24 20 D
Quartz sand stone (Residual 4 cm Penet for
-5.47 m soil) 12.00 SPT 51 blows > 75 0.73 55 35 D
Quartz sand stone (Residual 4 cm Penet for
-6.97 m soil) 13.50 SPT 51 blows > 75 0.69 52 33 D
Quartz sand stone (Residual 3 cm Penet for
-8.47 m soil) 15.00 SPT 51 blows > 75 0.66 49 32 D
Quartz sand stone (Residual 3 cm Penet for
-9.97 m soil) 16.50 SPT 51 blows > 75 0.62 47 31 D
Quartz sand stone (Residual 3 cm Penet for
-11.47 m soil) 18.00 SPT 51 blows > 75 0.59 44 30 D
Quartz sand stone (Residual 2 cm Penet for
-12.97 m soil) 19.50 SPT 51 blows > 75 0.56 42 29 D
Quartz sand stone (Residual SPT Hammer
-14.27 m soil) 20.80 SPT Rebound > 75 0.54 41 28 D
Quartz sand stone (Residual SPT Hammer
-14.97 m soil) 21.50 SPT Rebound > 75 0.53 40 27 D
Quartz sand stone (Residual SPT Hammer
-16.47 m soil) 23.00 SPT Rebound > 75 0.52 39 27 D
SPT Hammer
Hard Rock
-17.47 m 24.00 SPT Rebound D

Note :
Bore Hole is Terminated at a depth of 24.00 m Below G.L
D - Disturbed soil sample
RHS- Right Hand Side - Final corrected value after Diltancy correction N''
LHS- Left Hand Side - Observe N Value
BH - Bore Hole , NGL - Natural Ground Level
Soil Profile at Bore Hole - 51 (LHS) Location

Contractor Senior Section Engineer Executive Engineer


COS CONSULTANCY SERVICES
GEO-TECH. ENGINEERING DIVISION

BORE LOG SHEET

Name of Project: "Doubling of track between Trivandrum and Kanyakumari-Conducting Subsoil investigation for major bridges, minor bridges and
along the proposed doubling alignment at specified locations".

Chainage: 238/587 Location BH 145 LHS

Bridge No.74 (Pier -


Structure & No. RL of Water Table 7.74 m
1)
Type of Boring Rotary Dia of Boring 150 mm

Date of
29.03.17 Total depth 20.50 m
Commencement:
Date of
30.03.17 RL of NGL 7.94 m
Completion:

correction factor in

Due to overburden
Depth from GL

Due to diltancy
Reduced Level

pressure in N''
pressure in N'

Type of Samples
Graphic Log

Graphical Representation
Type

of SPT
(m)

Cn
15

30

45
Visual soil N
Description N Values

Light brown coloured


6.44 m sand 1.50 SPT 3 6 8 14 1.43 20 18 D
Light brown coloured
4.94 m sand 3.00 SPT 4 6 9 15 1.19 18 16 D
Light brown coloured
3.44 m sand 4.50 SPT 6 9 9 18 1.06 19 17 D
Light brown coloured
1.94 m sand 6.00 SPT 6 10 12 22 0.97 21 18 D
Light brown coloured
0.44 m sand 7.50 SPT 8 12 11 23 0.89 21 18 D
Reddish yellow
-1.06 m coloured sand 9.00 SPT 45 23 14 37 0.83 31 23 D
Reddish yellow
-2.56 m coloured sand 10.50 SPT 33 32 35 67 0.78 52 34 D
Reddish yellow
-4.06 m coloured sand 12.00 SPT 35 35 40 75 0.73 55 35 D
Reddish yellow 7cm Penet for
-5.56 m coloured sand 13.50 SPT 51 blows > 75 0.69 52 33 D
Quiartz sand stone 9cm Penet for
-7.06 m (Residual soil) 15.00 SPT 51 blows > 75 0.66 49 32 D
Quiartz sand stone 8cm Penet for
-8.56 m (Residual soil) 16.50 SPT 51 blows > 75 0.62 47 31 D
Quiartz sand stone 10cm Penet for
-10.06 m (Residual soil) 18.00 SPT 51 blows > 75 0.59 45 30 D
Quiartz sand stone 5cm Penet for
-11.56 m (Residual soil) 19.50 SPT 51 blows > 75 0.57 43 29 D
Hard Rock SPT Hammer
-12.56 m 20.50 SPT Rebound

Note :
Bore Hole is Terminated at a depth of 20.50 m Below G.L
D - Disturbed soil sample
R - RHS - Final corrected value after Diltancy correction N''
L - LHS - Observe N Value
BH - Bore Hole , NGL - Natural Ground Level
Soil Profile at Bore Hole - 145(LHS) Location

Contractor Senior Section Engineer Executive Engineer


COS CONSULTANCY SERVICES
GEO-TECH. ENGINEERING DIVISION

BORE LOG SHEET

Name of Project: "Doubling of track between Trivandrum and Kanyakumari-Conducting Subsoil investigation for major bridges, minor bridges and along
the proposed doubling alignment at specified locations".

Chainage: 238/571 Location BH 146

Bridge No.74
Structure & No. RL of Water Table 7.56 m
(Pier-2)

Type of Boring Rotary Dia of Boring 150 mm

Date of
28.03.17 Total depth 20.40 m
Commencement:
Date of
29.03.17 RL of NGL 7.82 m
Completion:

Depth from GL (m)

correction factor in

Due to overburden

Due to diltancy
Reduced Level

pressure in N''
pressure in N'

Type of Samples
Graphic Log

Graphical Representation

Type

Cn
15

30

45
N of SPT
Visual soil Description
N Values

Red coloured sand mixed


6.32 m with Silt & clay 1.50 SPT 3 4 6 10 1.44 14 14 D
Red coloured sand mixed
4.52 m with Silt & clay 3.30 SPT 3 5 6 11 1.17 13 13 D
Red coloured sand mixed
3.02 m with Silt & clay 4.80 SPT 4 7 9 16 1.05 17 16 D
Red coloured sand mixed
1.52 m with Silt & clay 6.30 SPT 4 9 12 21 0.95 20 17 D
Red coloured sand mixed
-0.08 m with Silt & clay 7.90 SPT 5 11 13 24 0.87 21 18 D
Light brown coloured sand
mixed with Silt & clay
-1.58 m 9.40 SPT 7 14 17 31 0.82 25 20 D
Light brown coloured sand
mixed with Silt & clay
-3.08 m 10.90 SPT 7 16 20 36 0.77 28 21 D
Light brown coloured sand
mixed with Silt & clay
-4.58 m 12.40 SPT 9 19 20 39 0.72 28 22 D
Light brown coloured sand
mixed with Silt & clay
-6.08 m 13.90 SPT 13 21 24 45 0.69 31 23 D
Light brown coloured sand
mixed with Silt & clay
-7.58 m 15.40 SPT 12 24 29 53 0.65 34 25 D
Quartz sand stone (Residual 7cm Penet for
-9.08 m soil) 16.90 SPT 51 blows > 75 0.62 46 31 D
Quartz sand stone (Residual 8cm Penet for
-10.58 m soil) 18.40 SPT 51 blows > 75 0.59 44 29 D
Quartz sand stone (Residual 5cm Penet for
-11.58 m soil) 19.40 SPT 51 blows > 75 0.57 43 29 D

Hard Rock SPT Hammer


-12.58 m 20.40 SPT Rebound D

Note :
Bore Hole is Terminated at a depth of 20.40 m Below G.L
D - Disturbed soil sample
R - RHS - Final corrected value after Diltancy correction N''
L - LHS - Observe N Value
BH - Bore Hole , NGL - Natural Ground Level
Soil Profile at Bore Hole - 146(LHS) Location

Contractor Senior Section Engineer Executive Engineer


COS CONSULTANCY SERVICES
GEO-TECH. ENGINEERING DIVISION

BORE LOG SHEET


Name of Project: "Doubling of track between Trivandrum and Kanyakumari-Conducting Subsoil investigation for major bridges, minor bridges and along
the proposed doubling alignment at specified locations".

Chainage: 238/590 Location BH 147

Bridge No.74
Structure & No. RL of Water Table 5.66 m
(Abutment-2)
Type of Boring Rotary Dia of Boring 150 mm
Date of
28.03.17 Total depth 20.50 m
Commencement:
Date of
29.03.17 RL of NGL 10.26 m
Completion:

correction factor
Depth from GL

Due to diltancy
Reduced Level

pressure in N''

Type of Samples
pressure in N'
Graphic Log

overburden
Due to
in Cn
Graphical Representation

Type
(m)

15

30

45
N of SPT
Visual soil Description
N Values

Red coloured sand mixed


8.76 m with Silt & clay 1.50 SPT 3 4 6 10 1.43 14 14 D
Red coloured sand mixed
7.26 m with Silt & clay 3.00 SPT 3 5 6 11 1.20 13 13 D
Red coloured sand mixed
5.76 m with Silt & clay 4.50 SPT 4 7 9 16 1.07 17 16 D
Red coloured sand mixed
4.26 m with Silt & clay 6.00 SPT 4 9 12 21 0.98 21 18 D
Red coloured sand mixed
2.76 m with Silt & clay 7.50 SPT 5 11 13 24 0.90 22 18 D
Light brown coloured sand
mixed with Silt & clay
1.26 m 9.00 SPT 7 14 17 31 0.84 26 21 D
Light brown coloured sand
mixed with Silt & clay
-0.24 m 10.50 SPT 7 16 20 36 0.79 28 22 D
Light brown coloured sand
mixed with Silt & clay
-1.74 m 12.00 SPT 9 19 20 39 0.48 19 17 D
Light brown coloured sand
mixed with Silt & clay
-3.24 m 13.50 SPT 13 21 24 45 0.32 14 14 D
Light brown coloured sand
mixed with Silt & clay
-4.74 m 15.00 SPT 12 24 29 53 0.22 11 11 D
Quartz sand stone 7cm Penet for
-6.24 m (Residual soil) 16.50 SPT 51 blows > 75 0.21 15 15 D
Quartz sand stone 6cm Penet for
-7.74 m (Residual soil) 18.00 SPT 51 blows > 75 0.20 15 15 D
Quartz sand stone 4cm Penet for
-8.94 m (Residual soil) 19.20 SPT 51 blows > 75 0.19 14 14
Hard Rock SPT Hammer
-10.24 m 20.50 SPT Rebound

Note :
Bore Hole is Terminated at a depth of 20.50 m Below G.L
D - Disturbed soil sample
R - RHS - Final corrected value after Diltancy correction N''
L - LHS - Observe N Value
BH - Bore Hole , NGL - Natural Ground Level
Soil Profile at Bore Hole - 147(LHS) Location

Contractor Senior Section Engineer Executive Engineer


COS CONSULTANCY SERVICES
GEO-TECH. ENGINEERING DIVISION

BORE LOG SHEET

Name of Project: "Doubling of track between Trivandrum and Kanyakumari-Conducting Subsoil investigation for major bridges, minor bridges and along
the proposed doubling alignment at specified locations".

Chainage: 238/923 Location BH 148 LHS

Structure & No. Bridge No-75 RL of Water Table 4.05 m

Type of Boring Rotary Dia of Boring 150 mm


Date of
28.03.17 Total depth 16.30 m
Commencement:
Date of
29.03.17 RL of NGL 8.55 m
Completion:

Due to overburden
correction factor
Depth from GL

Due to diltancy
Reduced Level

pressure in N''
pressure in N'

Type of Samples
Graphic Log

Graphical Representation

in Cn
Type
(m)

of SPT
15

30

45
Visual soil N
Description
N Values

Red coloured sand


7.05 m 1.50 SPT 3 4 6 10 1.43 14 14 UD
Red coloured sand
5.55 m 3.00 SPT 4 5 8 13 1.19 15 15 UD
Red coloured sand
4.05 m 4.50 SPT 5 7 9 16 1.05 17 16 UD
Red coloured sand
2.55 m 6.00 SPT 7 10 12 22 0.96 21 18 D
Red coloured sand
1.05 m 7.50 SPT 9 11 14 25 0.88 22 19 D
Light brown coloured
-0.45 m sand 9.00 SPT 12 15 18 33 0.82 27 21 D
Light brown coloured
-1.95 m sand 10.50 SPT 16 20 23 43 0.77 33 24 D
Light brown coloured
-3.45 m sand 12.00 SPT 23 26 29 55 0.73 40 28 D
Quartz sand stone 5cm Penet for
-4.95 m (Residual soil) 13.50 SPT 55 blows > 75 0.69 52 33 D
Quartz sand stone 4cm Penet for
-6.45 m (Residual soil) 15.00 SPT 52 blows > 75 0.65 49 32 D
Quartz sand stone 4cm Penet for
-7.75 m (Residual soil) 16.30 SPT 52 blows > 75 0.63 47 31 D

Note :
Bore Hole is Terminated at a depth of 16.30 m Below G.L
D - Disturbed soil sample UD -Un Disturbed soil sample
R - RHS - Final corrected value after Diltancy correction N''
L - LHS - Observe N Value
BH - Bore Hole , NGL - Natural Ground Level
Soil Profile at Bore Hole - 148(LHS) Location

Contractor Senior Section Engineer Executive Engineer


COS CONSULTANCY SERVICES
GEO-TECH. ENGINEERING DIVISION

BORE LOG SHEET

Name of Project: "Doubling of track between Trivandrum and Kanyakumari-Conducting Subsoil investigation for major bridges, minor bridges and
along the proposed doubling alignment at specified locations".

Chainage: 256/414 Abutment-1 Location BH 268 LHS

Structure & No. Bridge No.161 RL of Water Table 2.59 m

Type of Boring Rotary Dia of Boring 150 mm

Date of
07.05.17 Total depth 13.50 m
Commencement:
Date of
09.05.17 RL of NGL 8.59 m
Completion: Depth from GL (m)

correction factor in

Due to overburden

Due to diltancy
Reduced Level

pressure in N''
pressure in N'
Graphic Log

Graphical Representation

Type of Samples
of SPT
Type

Cn
15

30

45
N
Visual soil Description
N Values

Red coloured sand mixed


with silt & clay
7.09 m 1.50 SPT 2 2 3 5 1.43 7 7 D
Red coloured sand mixed
with silt & clay
5.59 m 3.00 SPT 5 5 6 11 1.19 13 13 D
Red coloured sand mixed
with silt & clay
4.09 m 4.50 SPT 5 6 7 13 1.06 14 14 D
Red coloured sand mixed
with silt & clay
2.59 m 6.00 SPT 6 7 4 11 0.96 11 11 D
Light yellow coloured Silt &
clay mixed with sand
1.09 m 7.50 SPT 5 6 5 11 0.88 10 10 D
Light yellow coloured Silt &
clay mixed with sand 7 12 19 0.82 16 15
-0.41 m 9.00 SPT 12 D
Quartz sand stone 5cm Penet for
-1.91 m (Residual soil) 10.50 SPT 55 blows > 75 0.77 58 36 D
Quartz sand stone 6cm Penet for
-3.91 m (Residual soil) 12.50 SPT 55 blows > 75 0.71 54 34 D

Hard Rock SPT Hammer


-4.91 m 13.50 SPT Rebound

Note :
Bore Hole is Terminated at a depth of 13.50 m Below G.L
D - Disturbed soil sample
R - RHS - Final corrected value after Diltancy correction N''
L - LHS - Observe N Value
BH - Bore Hole , NGL - Natural Ground Level
Soil Profile at Bore Hole -268 (LHS) Location

Contractor Senior Section Engineer Executive Engineer


COS CONSULTANCY SERVICES
GEO-TECH. ENGINEERING DIVISION

BORE LOG SHEET

Name of Project: "Doubling of track between Trivandrum and Kanyakumari-Conducting Subsoil investigation for major bridges, minor bridges and
along the proposed doubling alignment at specified locations".

Chainage: 256/432 Pier-1 Location BH 269 LHS

Structure & No. Bridge No.161 RL of Water Table 0.35 m

Type of Boring Rotary Dia of Boring 150 mm

Date of
07.05.17 Total depth 10.50 m
Commencement:
Date of
09.05.17 RL of NGL 6.35 m
Completion:
Depth from GL (m)

correction factor in

Due to overburden

Due to diltancy
Reduced Level

pressure in N''
pressure in N'
Graphical Representation
Graphic Log

Type of Samples
of SPT
Type

Cn
15

30

45
N
Visual soil Description N Values

Light brown coloured sand


4.85 m 1.50 SPT 2 3 2 5 1.43 7 7 D
Light brown coloured sand
mixed with Silt & clay 4 2 6 1.19 7 7
3.35 m 3.00 SPT 3 D
Light brown coloured sand
mixed with Silt & clay 3 3 4 7 1.06 7 7
1.85 m 4.50 SPT D

Light brown coloured sand


0.35 m 6.00 SPT 4 5 4 9 0.96 9 9 D

Light brown coloured sand


-1.15 m 7.50 SPT 20 23 27 50 0.88 44 30 D
Quartz sand stone (Residual 7cm Penet for
-3.15 m soil) 9.50 SPT 55 blows > 75 0.80 60 38 D

Hard Rock SPT Hammer


-4.15 m 10.50 SPT Rebound

Note :
Bore Hole is Terminated at a depth of 10.50 m Below G.L
D - Disturbed soil sample
R - RHS - Final corrected value after Diltancy correction N''
L - LHS - Observe N Value
BH - Bore Hole , NGL - Natural Ground Level
Soil Profile at Bore Hole -269(LHS) Location

Contractor Senior Section Engineer Executive Engineer


COS CONSULTANCY SERVICES
GEO-TECH. ENGINEERING DIVISION

BORE LOG SHEET

Name of Project: "Doubling of track between Trivandrum and Kanyakumari-Conducting Subsoil investigation for major bridges, minor bridges and
along the proposed doubling alignment at specified locations".

Chainage: 256/451 Pier-4 Location BH 270 LHS

Structure & No. Bridge No.161 RL of Water Table NIL

Type of Boring Rotary Dia of Boring 150 mm

Date of
27.07.17 Total depth 11.50 m
Commencement:
Date of
27.07.17 RL of NGL 7.46 m
Completion: Depth from GL (m)

correction factor in

Due to overburden

Due to diltancy
Reduced Level

pressure in N''
pressure in N'
Graphical Representation
Graphic Log

Type of Samples
of SPT
Type

Cn
15

30

45
N N Values
Visual soil Description

Light brown coloured sand


mixed with Silt & clay
5.96 m 1.50 SPT 4 5 7 12 1.43 17 16 D
Light brown coloured sand
mixed with Silt & clay
4.46 m 3.00 SPT 5 7 9 16 1.20 19 17 D
Light brown coloured sand
mixed with Silt & clay
2.96 m 4.50 SPT 3 5 9 14 1.06 15 15 D
Light brown coloured sand
mixed with Silt & clay
1.46 m 6.00 SPT 7 8 9 17 0.96 16 16 D
Light brown coloured sand
mixed with Silt & clay
-0.04 m 7.50 SPT 11 10 12 22 0.89 20 17 D
Light brown coloured sand
mixed with Silt & clay 13 15 18 33 0.82 27 21
-1.54 m 9.00 SPT D
Quartz sand stone 7cm Penet for
-3.04 m (Residual soil) 10.50 SPT 55 blows > 75 0.77 58 36 D

Hard Rock SPT Hammer


-4.04 m 11.50 SPT Rebound

Note :
Bore Hole is Terminated at a depth of 11.50 m Below G.L
D - Disturbed soil sample
R - RHS - Final corrected value after Diltancy correction N''
L - LHS - Observe N Value
BH - Bore Hole , NGL - Natural Ground Level
Soil Profile at Bore Hole -270(LHS) Location

Contractor Senior Section Engineer Executive Engineer


COS CONSULTANCY SERVICES
GEO-TECH. ENGINEERING DIVISION

BORE LOG SHEET

Name of Project: "Doubling of track between Trivandrum and Kanyakumari-Conducting Subsoil investigation for major bridges, minor bridges and
along the proposed doubling alignment at specified locations".

Chainage: 256/470 Pier-7 Location BH 271 LHS

Structure & No. Bridge No.161 RL of Water Table NIL

Type of Boring Rotary Dia of Boring 150 mm


Date of
07.05.17 Total depth 18.10 m
Commencement:
Date of
09.05.17 RL of NGL 6.99 m
Completion:

Depth from GL (m)

correction factor in

Due to overburden

Due to diltancy
Reduced Level

pressure in N''
pressure in N'
Graphic Log

Type of Samples
Graphical Representation
of SPT
Type

Cn
15

30

45
N
Visual soil Description
N Values

Light yellow coloured Silt &


clay mixed with Sand
5.49 m 1.50 SPT 5 4 6 10 1.41 14 14 D
Light yellow coloured Silt &
clay mixed with Sand
3.99 m 3.00 SPT 4 6 8 14 1.18 16 16 D
Light yellow coloured Silt &
clay mixed with Sand
2.49 m 4.50 SPT 5 7 9 16 1.04 17 16 D
Light yellow coloured Silt &
clay mixed with Sand
0.99 m 6.00 SPT 8 9 10 19 0.95 18 17 D
Light yellow coloured Silt &
clay mixed with Sand
-0.51 m 7.50 SPT 10 12 13 25 0.87 22 18 D
Light yellow coloured Sand
mixed with Silt & clay
-2.01 m 9.00 SPT 12 13 15 28 0.82 23 19 D
Light yellow coloured Sand
mixed with Silt & clay
-3.51 m 10.50 SPT 7 9 11 20 0.76 15 15 D
Light yellow coloured Sand
mixed with Silt & clay 9 12 13 25 0.72 18 17
-5.01 m 12.00 SPT D
Quartz sand stone 7cm Penet for
-7.31 m (Residual soil) 14.30 SPT 55 blows > 75 0.66 50 32 D
Quartz sand stone 6cm Penet for
-8.18 m (Residual soil) 15.17 SPT 55 blows > 75 0.64 48 32 D
Quartz sand stone 3cm Penet for
-10.11 m (Residual soil) 17.10 SPT 55 blows > 75 0.62 46 31 D

Hard Rock SPT Hammer


-11.11 m 18.10 SPT Rebound

Note :
Bore Hole is Terminated at a depth of 18.10m Below G.L
D - Disturbed soil sample
R - RHS - Final corrected value after Diltancy correction N''
L - LHS - Observe N Value
BH - Bore Hole , NGL - Natural Ground Level
Soil Profile at Bore Hole -271(LHS) Location

Contractor Senior Section Engineer Executive Engineer


COS CONSULTANCY SERVICES
GEO-TECH. ENGINEERING DIVISION

BORE LOG SHEET

Name of Project: "Doubling of track between Trivandrum and Kanyakumari-Conducting Subsoil investigation for major bridges, minor bridges and
along the proposed doubling alignment at specified locations".

Chainage: 256/489 Abutment-2 Location BH 272 LHS

Structure & No. Bridge No.161 RL of Water Table 7.43 m

Type of Boring Rotary Dia of Boring 150 mm

Date of
06.05.17 Total depth 11.50 m
Commencement:
Date of
06.05.17 RL of NGL 13.43 m
Completion:

correction factor
Depth from GL

Due to diltancy

Type of Samples
Reduced Level

pressure in N''
pressure in N'
Graphic Log

Graphical Representation

overburden
of SPT

Due to
in Cn
Type
(m)

15

30

45
N N Values
Visual soil Description

Red coloured sand mixed


11.93 m with Silt & clay 1.50 SPT 6 8 9 17 1.42 24 20 D
Red coloured sand mixed
10.43 m with Silt & clay 3.00 SPT 8 10 12 22 1.19 26 21 D
Red coloured sand mixed
8.93 m with Silt & clay 4.50 SPT 10 12 14 26 1.06 28 21 D
Red coloured sand mixed
7.43 m with Silt & clay 6.00 SPT 12 14 15 29 0.96 28 21 D
Light brown coloured Silt &
5.93 m clay mixed with sand 7.50 SPT 19 23 25 48 0.89 43 29 D
Light brown coloured Silt &
5.43 m clay mixed with sand 8.00 SPT 20 24 27 51 0.87 45 30 D
Light brown coloured Silt &
4.43 m clay mixed with sand 9.00 SPT 25 30 28 58 0.83 48 32 D
Quartz sand stone 6cm Penet for
2.93 m (Residual soil) 10.50 SPT 28 55 blows > 75 0.78 59 37 D
SPT Hammer
Hard Rock
1.93 m 11.50 SPT Rebound

Note :
Bore Hole is Terminated at a depth of 11.50 m Below G.L
D - Disturbed soil sample
R - RHS - Final corrected value after Diltancy correction N''
L - LHS - Observe N Value
BH - Bore Hole , NGL - Natural Ground Level
Soil Profile at Bore Hole -272(LHS) Location

Contractor Senior Section Engineer Executive Engineer


COS CONSULTANCY SERVICES
GEO-TECH. ENGINEERING DIVISION

BORE LOG SHEET

Name of Project: "Doubling of track between Trivandrum and Kanyakumari-Conducting Subsoil investigation for major bridges, minor bridges and
along the proposed doubling alignment at specified locations".

Chainage: 269/100 Location BH 336 RHS

Structure & No. Formation- 30 RL of Water Table 28.42 m

Type of Boring Rotary Dia of Boring 150 mm

Date of
10.06.17 Total depth 14.00 m
Commencement:
Date of
10.06.17 RL of NGL 35.22 m
Completion:
Depth from GL (m)

correction factor in

Due to overburden

Due to diltancy
Reduced Level

pressure in N''
pressure in N'
Graphic Log

Type of Samples
Graphical Representation
of SPT
Type

Cn
15

30

45
N
Visual soil Description
N Values

Quartz sand stone


(Residual soil)
3cm Penet for
21.22 m 14.00 SPT 55 blows >75 1.31 98 57 D

Note :
Bore Hole is Terminated at a depth of 14.00m Below G.L
D - Disturbed soil sample
R - RHS - Final corrected value after Diltancy correction N''
L - LHS - Observe N Value
BH - Bore Hole , NGL - Natural Ground Level
Soil Profile at Bore Hole -336(RHS) Location

Contractor Senior Section Engineer Executive Engineer


COS CONSULTANCY SERVICES
GEO-TECH. ENGINEERING DIVISION

BORE LOG SHEET

Name of Project: "Doubling of track between Trivandrum and Kanyakumari-Conducting Subsoil investigation for major bridges, minor bridges and along
the proposed doubling alignment at specified locations".

Chainage: 268/568 Location BH 337 RHS

Structure & No. Bridge No.212 RL of Water Table 48.50 m

Type of Boring Rotary Dia of Boring 150 mm

Date of
09.06.17 Total depth 15.00 m
Commencement:
Date of
09.06.17 RL of NGL 55.30 m
Completion:
Depth from GL (m)

correction factor in

Due to overburden

Due to diltancy
Reduced Level

pressure in N''
pressure in N'
Graphical Representation
Graphic Log

Type of Samples
of SPT
Type

Cn
15

30

45
N
Visual soil Description N Values

Red coloured Sand


mixed with Silt & Clay 23 1.43 33 24
53.80 m 1.50 SPT 5 8 15 D
Red coloured Sand
mixed with Silt & Clay 26 1.20 31 23
52.30 m 3.00 SPT 6 10 16 D
Red coloured Sand
mixed with Silt & Clay 33 1.07 35 25
50.80 m 4.50 SPT 8 13 20 D
Red coloured Sand
mixed with Silt & Clay 13 0.97 13 13
49.30 m 6.00 SPT 5 5 8 D
Red coloured Sand
mixed with Silt & Clay 21 0.89 19 17
47.80 m 7.50 SPT 8 10 11 D
Red coloured Sand
mixed with Silt & Clay 31 0.83 26 20
46.30 m 9.00 SPT 13 15 16 D
Red coloured Sand
mixed with Silt & Clay 39 0.78 30 23
44.80 m 10.50 SPT 15 18 21 D
Red coloured Sand
mixed with Silt & Clay 41 0.73 30 23
43.30 m 12.00 SPT 17 19 22 D

Quartz sand stone 2cm Penet


(Residual soil) for 55
41.80 m 13.50 SPT 20 25 blows >75 0.69 52 33 D

Quartz sand stone 17cm


(Residual soil) Penet for
40.30 m 15.00 SPT 55 10 65 blows >75 0.65 49 32 D

Note :
Bore Hole is Terminated at a depth of 15.00m Below G.L
D - Disturbed soil sample
R - RHS - Final corrected value after Diltancy correction N''
L - LHS - Observe N Value
BH - Bore Hole , NGL - Natural Ground Level
Soil Profile at Bore Hole -337(RHS) Location

Contractor Senior Section Engineer Executive Engineer


COS CONSULTANCY SERVICES
GEO-TECH. ENGINEERING DIVISION

BORE LOG SHEET

Name of Project: "Doubling of track between Trivandrum and Kanyakumari-Conducting Subsoil investigation for major bridges, minor bridges and
along the proposed doubling alignment at specified locations".

Chainage: 268/582 Location BH 338 RHS

Structure & No. Bridge No.212 RL of Water Table 43.01 m


Type of Boring Rotary Dia of Boring 150 mm
Date of
10.06.17 Total depth 18.00 m
Commencement:
Date of
11.06.17 RL of NGL 55.01 m
Completion:

Depth from GL (m)

correction factor in

Due to overburden

Due to diltancy
Reduced Level

pressure in N''
pressure in N'
Graphical Representation
Graphic Log

Type of Samples
of SPT

Type

Cn
15

30

45
N
Visual soil Description
N Values

Red coloured Sand mixed


with Silt & clay
53.51 m 1.50 SPT 5 7 9 16 1.45 23 19 D

Red coloured Sand mixed


with Silt & clay
52.01 m 3.00 SPT 7 18 20 38 1.21 46 31 D

Light Yellow coloured Silt


& clay mixed with Sand
50.51 m 4.50 SPT 8 19 20 39 1.07 42 28 D

Light Yellow coloured Silt


& clay mixed with Sand
49.01 m 6.00 SPT 8 13 25 38 0.96 37 26 D

Light Yellow coloured Silt


& clay mixed with Sand
47.51 m 7.50 SPT 10 12 22 34 0.89 30 23 D

Light Yellow coloured Silt


& clay mixed with Sand
46.01 m 9.00 SPT 15 21 24 45 0.82 37 26 D

Light Yellow coloured Silt


& clay mixed with Sand
44.51 m 10.50 SPT 18 22 25 47 0.77 36 26 D

Light Yellow coloured Silt


& clay mixed with Sand
43.01 m 12.00 SPT 22 27 31 58 0.72 42 28 D

Light Yellow coloured Silt


& clay mixed with Sand
41.51 m 13.50 SPT 10 12 15 27 0.68 18 17 D

Light Yellow coloured Silt


& clay mixed with Sand
40.01 m 15.00 SPT 17 36 46 82 0.65 53 34 D

Light Yellow coloured Silt


& clay mixed with Sand
38.51 m 16.50 SPT 16 30 32 62 0.62 38 27 D

Quartz sand stone


3cm Penet for
(Residual soil)
37.01 m 18.00 SPT 55 blows >75 0.59 44 30 D

Note :
Bore Hole is Terminated at a depth of 18.00m Below G.L
D - Disturbed soil sample
R - RHS - Final corrected value after Diltancy correction N''
L - LHS - Observe N Value
BH - Bore Hole , NGL - Natural Ground Level
Soil Profile at Bore Hole -338(RHS) Location

Contractor Senior Section Engineer Executive Engineer


COS CONSULTANCY SERVICES
GEO-TECH. ENGINEERING DIVISION

BORE LOG SHEET

Name of Project: "Doubling of track between Trivandrum and Kanyakumari-Conducting Subsoil investigation for major bridges, minor bridges and
along the proposed doubling alignment at specified locations".

Chainage: 268/941 Location BH 339 RHS

Structure & No. Bridge No.213 RL of Water Table 29.43 m

Type of Boring Rotary Dia of Boring 150 mm

Date of
11.06.17 Total depth 10.00 m
Commencement:
Date of
12.06.17 RL of NGL 38.23 m
Completion:
Depth from GL (m)

correction factor in

Due to overburden
Graphical Representation

Due to diltancy
Reduced Level

pressure in N''
pressure in N'
Graphic Log

Type of Samples
of SPT
Type

Cn
N Values
15

30

45
N
Visual soil Description

Red coloured Sand mixed


with Silt & clay
36.73 m 1.50 SPT 4 5 7 12 1.42 17 16 D

Red coloured Sand mixed


with Silt & clay
35.23 m 3.00 SPT 6 6 8 14 1.19 17 16 D

Yellow coloured Silt &


clay mixed with Sand
33.73 m 4.50 SPT 9 11 14 25 1.05 26 21 D

Yellow coloured Silt &


clay mixed with Sand
32.23 m 6.00 SPT 12 14 15 29 0.95 28 21 D

Yellow coloured Silt &


clay mixed with Sand
30.73 m 7.50 SPT 15 14 19 33 0.88 29 22 D

Quartz sand stone


(Residual soil) 3cm Penet for
29.23 m 9.00 SPT 55 blows >75 0.82 61 38 D

Hard Rock SPT Hammer


28.23 m 10.00 SPT Rebound

Note :
Bore Hole is Terminated at a depth of 10.00m Below G.L
D - Disturbed soil sample
R - RHS - Final corrected value after Diltancy correction N''
L - LHS - Observe N Value
BH - Bore Hole , NGL - Natural Ground Level
Soil Profile at Bore Hole -339(RHS) Location

Contractor Senior Section Engineer Executive Engineer


COS CONSULTANCY SERVICES
GEO-TECH. ENGINEERING DIVISION

BORE LOG SHEET

Name of Project: "Doubling of track between Trivandrum and Kanyakumari-Conducting Subsoil investigation for major bridges, minor bridges and along
the proposed doubling alignment at specified locations".

Chainage: 287/610 Location BH 465 LHS

Structure & No. Bridge No.307 RL of Water Table 11.23 m

Type of Boring Rotary Dia of Boring 150 mm

Date of
11.07.17 Total depth 15.50 m
Commencement:
Date of
11.07.17 RL of NGL 17.43 m
Completion:
Depth from GL (m)

correction factor in

Due to overburden

Due to diltancy
Reduced Level

pressure in N''
pressure in N'
Graphical Representation
Graphic Log

Type of Samples
of SPT
Type

Cn
15

30

45
N
Visual soil Description N Values

Light Brown coloured sand


mixed with Silt & Clay 20 1.41 28 22
15.93 m 1.50 SPT 5 9 11 D
Light Brown coloured sand
mixed with Silt & Clay 43 1.18 51 33
14.43 m 3.00 SPT 12 18 25 D
Light Brown coloured sand
mixed with Silt & Clay 56 1.05 59 37
12.93 m 4.50 SPT 15 24 32 D
Light Brown coloured sand
mixed with Silt & Clay 75 0.95 71 43
11.43 m 6.00 SPT 20 34 41 D
Light Brown coloured sand
9.93 m mixed with Silt & Clay 7.50 SPT 30 41 49 90 0.88 79 47 D
Light Brown coloured sand 16cm Penet for
8.43 m mixed with Silt & Clay 9.00 SPT 55 blows >75 0.82 62 38 D
Light Brown coloured sand
mixed with Silt & Clay 78 0.78 61 38
7.13 m 10.30 SPT 35 40 38 D
Light Brown coloured sand
mixed with Silt & Clay 72 0.73 52 34
5.43 m 12.00 SPT 28 32 40 D
Quartz sand stone (Residual
3.93 m soil) 13.50 SPT 40 43 47 90 0.69 62 38 D
Quartz sand stone (Residual 3cm Penet for
1.93 m soil) 15.50 SPT 55 blows >75 0.64 48 31 D

Note :
Bore Hole is Terminated at a depth of 15.50m Below G.L
D - Disturbed soil sample
R - RHS - Final corrected value after Diltancy correction N''
L - LHS - Observe N Value
BH - Bore Hole , NGL - Natural Ground Level
Soil Profile at Bore Hole -465(LHS) Location

Contractor Senior Section Engineer Executive Engineer


COS CONSULTANCY SERVICES
GEO-TECH. ENGINEERING DIVISION

BORE LOG SHEET

Name of Project: "Doubling of track between Trivandrum and Kanyakumari-Conducting Subsoil investigation for major bridges, minor bridges and along
the proposed doubling alignment at specified locations".

Chainage: 287/636 Location BH 466 LHS

Structure & No. Bridge No.307 RL of Water Table 10.09 m

Type of Boring Rotary Dia of Boring 150 mm

Date of
11.07.17 Total depth 15.50 m
Commencement:
Date of
11.07.17 RL of NGL 17.29 m
Completion:
Depth from GL (m)

correction factor in

Due to overburden

Due to diltancy
Reduced Level

pressure in N''
pressure in N'
Graphical Representation
Graphic Log

Type of Samples
of SPT
Type

Cn
15

30

45
N
Visual soil Description N Values

Light Brown coloured sand


mixed with Silt & Clay
15.79 m 1.50 SPT 9 12 21 33 1.43 47 31 D
Light Brown coloured sand
mixed with Silt & Clay
14.29 m 3.00 SPT 10 14 19 33 1.20 40 27 D
Yellow coloured Silt & Clay
mixed sand
12.79 m 4.50 SPT 15 21 29 50 1.07 53 34 UD
Yellow coloured Silt & Clay
mixed sand
11.29 m 6.00 SPT 20 31 40 71 0.96 68 42 UD
Yellow coloured Silt & Clay
mixed sand
9.79 m 7.50 SPT 25 34 43 77 0.89 68 42 UD
Yellow coloured Silt & Clay
mixed sand
8.29 m 9.00 SPT 30 44 55 99 0.82 82 48 UD
Yellow coloured Silt & Clay
mixed sand 40 41 47 88 0.78 69 42
6.99 m 10.30 SPT UD

Quartz sand stone (Residual


6cm Penet for
soil) >75 0.73 55 35
5.29 m 12.00 SPT 55 blows D

Quartz sand stone (Residual


3cm Penet for
soil) >75 0.67 51 33
3.29 m 14.00 SPT 55 blows D

Quartz sand stone (Residual


SPT Hammer
soil) >75 0.64 48 32
1.79 m 15.50 SPT Rebound

Note :
Bore Hole is Terminated at a depth of 15.50m Below G.L
D - Disturbed soil sample
R - RHS - Final corrected value after Diltancy correction N''
L - LHS - Observe N Value
BH - Bore Hole , NGL - Natural Ground Level
Soil Profile at Bore Hole -466(LHS) Location

Contractor Senior Section Engineer Executive Engineer


COS CONSULTANCY SERVICES
GEO-TECH. ENGINEERING DIVISION

BORE LOG SHEET

Name of Project: "Doubling of track between Trivandrum and Kanyakumari-Conducting Subsoil investigation for major bridges, minor bridges and
along the proposed doubling alignment at specified locations".

Chainage: 290/158 Location BH 483 LHS

Structure & No. Bridge No.322 RL of Water Table 6.57 m

Type of Boring Rotary Dia of Boring 150 mm

Date of
08.07.17 Total depth 13.50 m
Commencement:
Date of
09.07.17 RL of NGL 11.57 m
Completion:
Depth from GL (m)

correction factor in

Due to overburden

Due to diltancy
Reduced Level

pressure in N''
pressure in N'
Graphical Representation
Graphic Log

Type of Samples
of SPT
Type

Cn
15

30

45
N
Visual soil Description

N Values

Light Brown coloured sand


mixed with Silt & Clay
10.07 m 1.50 SPT 3 5 7 12 1.42 17 16 D

Light Brown coloured sand


mixed with Silt & Clay
8.57 m 3.00 SPT 4 6 8 14 1.19 17 16 D

Light Brown coloured sand


mixed with Silt & Clay
7.07 m 4.50 SPT 6 8 10 18 1.06 19 17 D

Light Brown coloured sand


mixed with Silt & Clay
5.57 m 6.00 SPT 4 7 8 15 0.96 14 15 D

Light Brown coloured sand


mixed with Silt & Clay
4.07 m 7.50 SPT 7 9 12 21 0.88 18 17 D

Light Brown coloured sand


mixed with Silt & Clay
2.57 m 9.00 SPT 10 12 14 26 0.82 21 18 D

Light Brown coloured sand


mixed with Silt & Clay
1.07 m 10.50 SPT 13 15 18 33 0.77 25 20 D

Light Brown coloured sand


mixed with Silt & Clay
-0.43 m 12.00 SPT 15 19 24 43 0.73 31 23 D

Quartz sand stone


(Residual soil) 5cm Penet for
-1.93 m 13.50 SPT 55 blows >75 0.69 51 33 D

Note :
Bore Hole is Terminated at a depth of 13.50m Below G.L
D - Disturbed soil sample
R - RHS - Final corrected value after Diltancy correction N''
L - LHS - Observe N Value
BH - Bore Hole , NGL - Natural Ground Level
Soil Profile at Bore Hole -482(LHS) Location

Contractor Senior Section Engineer Executive Engineer


COS CONSULTANCY SERVICES
GEO-TECH. ENGINEERING DIVISION

BORE LOG SHEET

Name of Project: "Doubling of track between Trivandrum and Kanyakumari-Conducting Subsoil investigation for major bridges, minor bridges and along
the proposed doubling alignment at specified locations".

Chainage: 290/132 Location BH 484 LHS

Structure & No. Bridge No.322 RL of Water Table 3.49 m

Type of Boring Rotary Dia of Boring 150 mm

Date of
09.07.17 Total depth 16.00 m
Commencement:
Date of
09.07.17 RL of NGL 12.09 m
Completion:
Depth from GL (m)

correction factor in

Due to overburden

Due to diltancy
Reduced Level

pressure in N''
pressure in N'
Graphical Representation
Graphic Log

Type of Samples
of SPT
Type

Cn
15

30

45
N
Visual soil Description
N Values

Light brown coloured Silt &


clay mixed with sand 8 1.40 11 11
10.59 m 1.50 SPT 4 3 5 D
Light brown coloured Silt &
clay mixed with sand 10 1.17 12 12
9.09 m 3.00 SPT 3 4 6 D
Light brown coloured Silt &
clay mixed with sand 12 1.04 12 12
7.59 m 4.50 SPT 5 5 7 D
Light brown coloured Silt &
clay mixed with sand 14 0.94 13 13
6.09 m 6.00 SPT 7 6 8 D

Light brown coloured sand


4.59 m 7.50 SPT 6 8 8 16 0.87 14 14 D
Light brown coloured Silt &
clay mixed with sand 27 0.81 22 18
3.09 m 9.00 SPT 8 18 9 D
Light brown coloured sand
mixed with silt & clay 21 0.76 16 15
1.59 m 10.50 SPT 10 11 10 D
Light brown coloured sand
mixed with silt & clay 29 0.71 21 18
0.09 m 12.00 SPT 12 14 15 D
Light brown coloured sand
mixed with silt & clay 37 0.67 25 20
-1.41 m 13.50 SPT 15 17 20 D
Light brown coloured sand
-2.91 m mixed with silt & clay 15.00 SPT 17 20 23 43 0.64 27 21 D
Quartz sand stone (Residual 4cm Penet for
-3.91 m soil) 16.00 SPT 55 blows >75 0.62 46 31 DR

Note :
Bore Hole is Terminated at a depth of 16.00m Below G.L
D - Disturbed soil sample
R - RHS - Final corrected value after Diltancy correction N''
L - LHS - Observe N Value
BH - Bore Hole , NGL - Natural Ground Level
Soil Profile at Bore Hole -484(LHS) Location

Contractor Senior Section Engineer Executive Engineer


COS CONSULTANCY SERVICES
GEO-TECH. ENGINEERING DIVISION

BORE LOG SHEET

Name of Project: "Doubling of track between Trivandrum and Kanyakumari-Conducting Subsoil investigation for major bridges, minor bridges and along
the proposed doubling alignment at specified locations".

Chainage: 290/136 Location BH 485 RHS

Structure & No. Bridge No.322 RL of Water Table 3.44 m

Type of Boring Rotary Dia of Boring 150 mm

Date of
09.07.17 Total depth 13.50 m
Commencement:
Date of
10.07.17 RL of NGL 12.04 m
Completion:
Depth from GL (m)

correction factor in

Due to overburden

Due to diltancy
Reduced Level

pressure in N''
pressure in N'
Graphical Representation
Graphic Log

Type of Samples
of SPT
Type

Cn
15

30

45
N
Visual soil Description
N Values

Light Brown coloured sand


mixed with Silt & Clay 12 1.43 17 16
10.54 m 1.50 SPT 4 5 7 D
Light Brown coloured sand
mixed with Silt & Clay 14 1.19 17 16
9.04 m 3.00 SPT 3 6 8 D
Light Brown coloured sand
mixed with Silt & Clay 16 1.06 17 16
7.54 m 4.50 SPT 5 7 9 D
Light Brown coloured sand
mixed with Silt & Clay 18 0.96 17 16
6.04 m 6.00 SPT 6 8 10 D
Brown coloured Silt & Clay
mixed with sand 22 0.89 20 17
4.54 m 7.50 SPT 8 10 12 D
Brown coloured Silt & Clay
mixed with sand 28 0.83 23 19
3.04 m 9.00 SPT 10 13 15 D
Brown coloured Silt & Clay
mixed with sand 33 0.78 26 20
1.54 m 10.50 SPT 12 15 18 D
Brown coloured Silt & Clay
0.04 m mixed with sand 12.00 SPT 15 18 26 44 0.74 32 24 D
Quartz sand stone (Residual 6cm Penet for
-1.47 m soil) 13.50 SPT 51 blows >75 0.69 52 34 D

Note :
Bore Hole is Terminated at a depth of 16.00m Below G.L
D - Disturbed soil sample
R - RHS - Final corrected value after Diltancy correction N''
L - LHS - Observe N Value
BH - Bore Hole , NGL - Natural Ground Level
Soil Profile at Bore Hole -484(LHS) Location

Contractor Senior Section Engineer Executive Engineer


COS CONSULTANCY SERVICES
GEO-TECH. ENGINEERING DIVISION

BORE LOG SHEET

Name of Project: "Doubling of track between Trivandrum and Kanyakumari-Conducting Subsoil investigation for major bridges, minor bridges and along
the proposed doubling alignment at specified locations".

Chainage: 05/433 Location BH 21A RHS

Structure & No. Bridge No.21A RL of Water Table 0.02 m


Type of Boring Rotary Dia of Boring 150 mm
Date of
15.07.17 Total depth 20.00 m
Commencement:
Date of
16.07.17 RL of NGL 1.22 m
Completion:

Depth from GL (m)

correction factor in

Due to overburden

Due to diltancy
Reduced Level

pressure in N''
pressure in N'
Graphic Log

Type of Samples
Graphical Representation
of SPT

Type

Cn
15

30

45
N
Visual soil Description N Values

Brown coloured Silt &


clay mixed with Sand 7 1.45 10 10
-0.28 m 1.50 SPT 3 4 3 UD
Brown coloured Sand
mixed with Silt & clay 9 1.21 11 11
-1.78 m 3.00 SPT 4 5 4 D
Brown coloured Sand
mixed with Silt & clay 10 1.07 11 11
-3.28 m 4.50 SPT 6 4 6 D
Brown coloured Sand
mixed with Silt & clay 13 0.97 13 13
-4.78 m 6.00 SPT 5 7 6 D
Brown coloured Sand
mixed with Silt & clay 14 0.90 13 13
-6.28 m 7.50 SPT 7 6 8 D

Light Brown coloured Sand


-7.78 m 9.00 SPT 8 7 9 16 0.83 13 13 D

Light Brown coloured Sand


-9.28 m 10.50 SPT 10 8 9 17 0.78 13 13 D

Light Brown coloured Sand


-10.78 m 12.00 SPT 12 10 11 21 0.73 15 15 D

Light Brown coloured Sand


-11.78 m 13.00 SPT 11 12 12 24 0.71 17 16 D

Light Brown coloured Sand


-13.78 m 15.00 SPT 12 13 14 27 0.66 18 16 D
Quartz sand stone
-15.28 m (Residual soil) 16.50 SPT 11 13 16 29 0.62 18 17 D
Quartz sand stone
-16.78 m (Residual soil) 18.00 SPT 15 14 17 31 0.59 18 17 D
Quartz sand stone
-17.78 m (Residual soil) 19.00 SPT 17 18 22 40 0.57 23 19 D
4cm Penet for
Hard Rock
-18.78 m 20.00 SPT 55 blows >75 0.56 42 28

Note :
Bore Hole is Terminated at a depth of 20.00m Below G.L
D - Disturbed soil sample UD - Un Disturbed soil sample
R - RHS - Final corrected value after Diltancy correction N''
L - LHS - Observe N Value
BH - Bore Hole , NGL - Natural Ground Level
Soil Profile at Bore Hole -21A(RHS) Location

Contractor Senior Section Engineer Executive Engineer


COS CONSULTANCY SERVICES
GEO-TECH. ENGINEERING DIVISION

BORE LOG SHEET

Name of Project: "Doubling of track between Trivandrum and Kanyakumari-Conducting Subsoil investigation for major bridges, minor bridges and
along the proposed doubling alignment at specified locations".

Chainage: 05/469 Location 22A RHS

Structure & No. Bridge No.21A RL of Water Table 0.71 m

Type of Boring Rotary Dia of Boring 150 mm

Date of
14.07.17 Total depth 15.00 m
Commencement:
Date of
15.07.17 RL of NGL 1.46 m
Completion:
Depth from GL (m)

correction factor in

Due to overburden

Due to diltancy
Reduced Level

pressure in N''
pressure in N'
Graphical Representation
Graphic Log

Type of Samples
of SPT
Type

Cn
15

30

45
N N Values
Visual soil Description

Brown coloured Silt &


clay mixed with Sand 7 2.22 16 15
-0.04 m 1.50 SPT 3 3 4 UD
Brown coloured Silt &
clay mixed with Sand 8 1.99 16 15
-1.54 m 3.00 SPT 5 4 4 UD
Brown coloured Silt &
clay mixed with Sand 9 1.85 17 16
-3.04 m 4.50 SPT 4 5 4 UD
Brown coloured Silt &
clay mixed with Sand 12 1.76 21 18
-4.54 m 6.00 SPT 6 6 6 UD
Brown coloured Silt &
clay mixed with Sand 16 1.68 27 21
-6.04 m 7.50 SPT 8 7 9 UD

Light Brown coloured Sand


-7.54 m 9.00 SPT 7 8 10 18 1.62 29 22 UD

Light Brown coloured Sand


-9.04 m 10.50 SPT 9 11 9 20 1.56 31 23 D

Light Brown coloured Sand


-10.54 m 12.00 SPT 8 10 13 23 1.51 35 25 D
Quartz sand stone 5cm Penet for
-12.54 m (Residual soil) 14.00 SPT 55 blows >75 1.46 109 62 D

Hard Rock SPT Hammer


-13.54 m 15.00 SPT Rebound D

Note :
Bore Hole is Terminated at a depth of 15.00m Below G.L
D - Disturbed soil sample UD - UnDisturbed soil sample
R - RHS - Final corrected value after Diltancy correction N''
L - LHS - Observe N Value
BH - Bore Hole , NGL - Natural Ground Level
Soil Profile at Bore Hole -22(RHS) Location

Contractor Senior Section Engineer Executive Engineer


COS CONSULTANCY SERVICES
GEO-TECH. ENGINEERING DIVISION

BORE LOG SHEET

Name of Project: "Doubling of track between Trivandrum and Kanyakumari-Conducting Subsoil investigation for major bridges, minor bridges and
along the proposed doubling alignment at specified locations".

Chainage: 05/450 Location BH 23 RHS

Structure & No. Bridge No.21A RL of Water Table 0.70 m

Type of Boring Rotary Dia of Boring 150 mm

Date of
14.07.17 Total depth 18.00 m
Commencement:
Date of
15.07.17 RL of NGL 1.33 m
Completion:
Depth from GL (m)

correction factor in

Due to overburden

Due to diltancy
Reduced Level

pressure in N''
pressure in N'
Graphical Representation
Graphic Log

Type of Samples
of SPT
Type

Cn
15

30

45
N N Values
Visual soil Description

Brown coloured Silt &


-0.17 m clay mixed with Sand 1.50 SPT 3 4 5 9 1.44 13 13 UD
Brown coloured Silt &
-1.67 m clay mixed with Sand 3.00 SPT 5 4 6 10 1.21 12 12 UD
Brown coloured Silt &
-3.17 m clay mixed with Sand 4.50 SPT 6 5 7 12 1.08 13 13 UD
Brown coloured Silt &
-4.67 m clay mixed with Sand 6.00 SPT 7 6 8 14 0.98 14 14 UD
Brown coloured Silt &
-6.17 m clay mixed with Sand 7.50 SPT 8 7 9 16 0.90 14 14 UD
Brown coloured Silt &
-7.67 m clay mixed with Sand 9.00 SPT 7 8 10 18 0.84 15 15 UD

Light Brown coloured Sand


-9.17 m 10.50 SPT 10 9 10 19 0.78 15 15 D
6cm Penet for
Light Brown coloured Sand
-10.67 m 12.00 SPT 55 blows >75 0.74 56 35 D
Quartz sand stone 4cm Penet for
-12.17 m (Residual soil) 13.50 SPT 55 blows >75 0.70 53 34 D
Quartz sand stone 3cm Penet for
-12.67 m (Residual soil) 14.00 SPT 55 blows >75 0.69 51 33 D
Quartz sand stone 5cm Penet for
-14.17 m (Residual soil) 15.50 SPT 55 blows >75 0.65 49 32 D
Quartz sand stone 8cm Penet for
-15.67 m (Residual soil) 17.00 SPT 55 blows >75 0.62 46 31 D
SPT Hammer
Hard Rock
-16.67 m 18.00 SPT Rebound D

Note :
Bore Hole is Terminated at a depth of 15.00m Below G.L
D - Disturbed soil sample UD - UnDisturbed soil sample
R - RHS - Final corrected value after Diltancy correction N''
L - LHS - Observe N Value
BH - Bore Hole , NGL - Natural Ground Level
Soil Profile at Bore Hole -23(RHS) Location

Contractor Senior Section Engineer Executive Engineer


COS CONSULTANCY SERVICES
GEO-TECH. ENGINEERING DIVISION

BORE LOG SHEET

Name of Project: "Doubling of track between Trivandrum and Kanyakumari-Conducting Subsoil investigation for major bridges, minor bridges and
along the proposed doubling alignment at specified locations".

Chainage: 05/860 Location BH 26 RHS

Structure & No. Bridge No.22A RL of Water Table 0.43 m

Type of Boring Rotary Dia of Boring 150 mm

Date of
23.06.17 Total depth 11.50 m
Commencement:
Date of
23.06.17 RL of NGL 1.878 m
Completion:
Depth from GL (m)

correction factor in

Due to overburden

Due to diltancy
Reduced Level

pressure in N''
Graphical Representation

pressure in N'
Graphic Log

Type of Samples
of SPT
Type

Cn
15

30

45
N N Values
Visual soil Description

Light brown coloured sand


0.38 m 1.50 SPT 9 12 15 27 1.42 38 27 D

Light brown coloured sand


-1.12 m 3.00 SPT 12 15 17 32 1.19 38 27 D

Light brown coloured sand


-2.12 m 4.00 SPT 10 17 20 37 1.10 41 28 D

Light brown coloured sand


-3.12 m 5.00 SPT 20 23 27 50 1.02 51 33 D

Light brown coloured sand


-5.62 m 7.50 SPT 23 25 27 52 0.88 46 30 D
Quartz sand stone 8cm Penet for
-6.62 m (Residual soil) 8.50 SPT 55 blows >75 0.84 63 39 D
Quartz sand stone 6cm Penet for
-7.62 m (Residual soil) 9.50 SPT 55 blows >75 0.80 60 38 D
Quartz sand stone 3cm Penet for
-8.62 m (Residual soil) 10.50 SPT 55 blows >75 0.77 58 40 D
SPT Hammer
Hard rock
-9.62 m 11.50 SPT Rebound

Note :
Bore Hole is Terminated at a depth of 11.50m Below G.L
D - Disturbed soil sample
R - RHS - Final corrected value after Diltancy correction N''
L - LHS - Observe N Value
BH - Bore Hole , NGL - Natural Ground Level
Soil Profile at Bore Hole -26(RHS) Location

Contractor Senior Section Engineer Executive Engineer


COS CONSULTANCY SERVICES
GEO-TECH. ENGINEERING DIVISION

BORE LOG SHEET

Name of Project: "Doubling of track between Trivandrum and Kanyakumari-Conducting Subsoil investigation for major bridges, minor bridges and
along the proposed doubling alignment at specified locations".

Chainage: 05/880 Location BH 27 RHS

Structure & No. Bridge No.22A RL of Water Table 1.26 m

Type of Boring Rotary Dia of Boring 150 mm

Date of
23.06.17 Total depth 14.50 m
Commencement:
Date of
24.06.17 RL of NGL 2.10 m
Completion:
Depth from GL (m)

correction factor in

Due to overburden

Due to diltancy
Reduced Level

pressure in N''
pressure in N'
Graphical Representation
Graphic Log

Type of Samples
of SPT
Type

Cn
15

30

45
N N Values
Visual soil Description

Light brown coloured Sand


0.60 m 1.50 SPT 4 5 7 12 1.42 17 16 D

Light brown coloured Sand


-0.90 m 3.00 SPT 5 8 10 18 1.18 21 18 D

Light brown coloured Sand


-2.40 m 4.50 SPT 7 9 11 20 1.05 21 18 D

Light brown coloured Sand


-3.90 m 6.00 SPT 9 11 12 23 0.94 22 18 D

Light Brown coloured Sand


-5.40 m 7.50 SPT 12 9 13 22 0.87 19 17 D

Light Brown coloured Sand


-6.90 m 9.00 SPT 10 11 13 24 0.81 19 17 D

Light Brown coloured Sand


-8.40 m 10.50 SPT 11 8 10 18 0.76 14 14 D

Light Brown coloured Sand


-8.90 m 11.00 SPT 13 20 19 39 0.74 29 22 D

Light Brown coloured Sand


-9.90 m 12.00 SPT 14 16 26 42 0.71 30 22 D
Quartz sand stone 7cm Penet for
-11.40 m (Residual soil) 13.50 SPT 55 blows >75 0.67 51 33 D

Hard rock SPT Hammer


-12.40 m 14.50 SPT Rebound 0 0 D

Note :
Bore Hole is Terminated at a depth of 14.50m Below G.L
D - Disturbed soil sample
R - RHS - Final corrected value after Diltancy correction N''
L - LHS - Observe N Value
BH - Bore Hole , NGL - Natural Ground Level
Soil Profile at Bore Hole -27(RHS) Location

Contractor Senior Section Engineer Executive Engineer


COS CONSULTANCY SERVICES
GEO-TECH. ENGINEERING DIVISION

BORE LOG SHEET

Name of Project: "Doubling of track between Trivandrum and Kanyakumari-Conducting Subsoil investigation for major bridges, minor bridges and along the proposed doubling
alignment at specified locations".

Chainage: 05/899 Location BH 28 RHS

Structure & No. Bridge No.22A RL of Water Table 0.78 m


Type of Boring Rotary Dia of Boring 150 mm
Date of
22.06.17 Total depth 22.50 m
Commencement:
Date of Completion: 23.06.17 RL of NGL 1.991 m

Due to diltancy pressure


correction factor in Cn
Depth from GL (m)

Due to overburden
Graphical Representation
Reduced Level

pressure in N'
Graphic Log

of SPT

Type of Samples
in N''
Type

15

30

45
N
Visual soil Description N Values

Brown coloured Silt & clay


0.49 m mixed with sand 1.50 SPT 4 5 3 8 1.41 11 11 UD
Brown coloured Silt & clay
-1.01 m mixed with sand 3.00 SPT 6 8 9 17 1.17 20 17 UD
Brown coloured Silt & clay
-2.51 m mixed with sand 4.50 SPT 8 10 12 22 1.04 23 19 UD
Brown coloured Silt & clay
-4.01 m mixed with sand 6.00 SPT 11 13 16 29 0.94 27 21 UD
Brown coloured Silt & clay
-5.51 m mixed with sand 7.50 SPT 6 5 7 12 0.87 10 11 UD
Brown coloured Silt & clay
-7.01 m mixed with sand 9.00 SPT 4 6 5 11 0.81 9 9 UD
Brown coloured Silt & clay
-8.51 m mixed with sand 10.50 SPT 7 8 6 14 0.76 11 11 UD
Brown coloured Silt & clay
-10.01 m mixed with sand 12.00 SPT 5 7 8 15 0.71 11 11 UD
Brown coloured Silt & clay
-11.51 m mixed with sand 13.50 SPT 6 9 8 17 0.67 11 12 UD

Light brown coloured sand


-13.01 m 15.00 SPT 10 14 18 32 0.64 20 18 D

Light brown coloured sand


-14.51 m 16.50 SPT 13 15 19 34 0.61 21 18 D

Light brown coloured sand


-16.01 m 18.00 SPT 11 11 18 29 0.58 17 16 ## ## D

Light brown coloured sand


-17.51 m 19.50 SPT 13 15 17 32 0.55 18 16 D

Quartz sand stone (Residual soil)


-18.01 m 20.00 SPT 15 18 20 38 0.55 21 18 ## ## D

Quartz sand stone (Residual soil)


-19.51 m 21.50 SPT 20 22 25 47 0.52 24 20 D

Hard Rock
-20.51 m 22.50 SPT SPT Hammer Rebound 0 0 D

Note :
Bore Hole is Terminated at a depth of 22.50m Below G.L
D - Disturbed soil sample UD - UDisturbed soil sample
R - RHS - Final corrected value after Diltancy correction N''
L - LHS - Observe N Value
BH - Bore Hole , NGL - Natural Ground Level
Soil Profile at Bore Hole -28(RHS) Location

Contractor Senior Section Engineer Executive Engineer


COS CONSULTANCY SERVICES
GEO-TECH. ENGINEERING DIVISION

BORE LOG SHEET

Name of Project: "Doubling of track between Trivandrum and Kanyakumari-Conducting Subsoil investigation for major bridges, minor bridges and
along the proposed doubling alignment at specified locations".

Chainage: 06/600 Location BH 29A RHS

Structure & No. Bridge No.26 RL of Water Table 2.99 m

Type of Boring Rotary Dia of Boring 150 mm

Date of
28.07.17 Total depth 8.20 m
Commencement:
Date of
28.07.17 RL of NGL 4.79 m
Completion:
Depth from GL (m)

correction factor in

Due to overburden

Due to diltancy
Graphical Representation
Reduced Level

pressure in N''
pressure in N'
Graphic Log

Type of Samples
of SPT
Type

N Values

Cn
15

30

45
N
Visual soil Description

Red coloured silt & clay


mixed with sand 10 1.42 14 13
3.29 m 1.50 SPT 4 5 5 UD

Red coloured sand


1.79 m 3.00 SPT 6 8 9 17 1.19 20 18 D

Red coloured sand


0.29 m 4.50 SPT 12 18 24 42 1.05 44 30 D

Red coloured sand


-1.21 m 6.00 SPT 13 20 38 58 0.96 55 35 D

Red coloured sand


-2.41 m 7.20 SPT 20 24 28 52 0.89 46 31 D

Hard Rock SPT Hammer


-3.41 m 8.20 SPT Rebound

Note :
Bore Hole is Terminated at a depth of 8.20m Below G.L
D - Disturbed soil sample UD - UnDisturbed soil sample
R - RHS - Final corrected value after Diltancy correction N''
L - LHS - Observe N Value
BH - Bore Hole , NGL - Natural Ground Level
Soil Profile at Bore Hole -29A(RHS) Location

Contractor Senior Section Engineer Executive Engineer


COS CONSULTANCY SERVICES
GEO-TECH. ENGINEERING DIVISION

BORE LOG SHEET

Name of Project: "Doubling of track between Trivandrum and Kanyakumari-Conducting Subsoil investigation for major bridges, minor bridges and
along the proposed doubling alignment at specified locations".

Chainage: 06/617 Location BH 32 RHS

Structure & No. Bridge No-26 RL of Water Table -0.12 m


Type of Boring Rotary Dia of Boring 150 mm
Date of
23.06.17 Total depth 17.50 m
Commencement:
Date of
23.06.17 RL of NGL 1.08 m
Completion:
Depth from GL (m)

correction factor in

Due to overburden

Due to diltancy
Reduced Level

pressure in N''
pressure in N'
Graphic Log

Type of Samples
Graphical Representation
Type of SPT

Cn
15

30

45
Visual soil N
Description N Values

Red coloured Silt &


-0.42 m clay mixed with sand 1.50 SPT 4 4 5 9 1.42 13 13 UD
Red coloured Silt &
#
-1.92 m clay mixed with sand 3.00 SPT 3 5 7 12 1.19 14 14 UD

Red coloured sand


-3.42 m 4.50 SPT 5 7 9 16 1.06 17 16 D

Red coloured sand


-4.92 m 6.00 SPT 4 5 6 11 0.96 11 11 D

Red coloured sand


-6.42 m 7.50 SPT 5 6 6 12 0.88 11 11 D

Red coloured sand


-7.92 m 9.00 SPT 7 8 8 16 0.82 13 13 D

Red coloured sand


-9.42 m 10.50 SPT 11 18 17 35 0.76 27 21 D

Red coloured sand


-10.92 m 12.00 SPT 15 19 21 40 0.72 29 22 D

Red coloured sand


-11.92 m 13.00 SPT 17 20 25 45 0.69 31 23 D

Red coloured sand


-12.92 m 14.00 SPT 20 23 26 49 0.67 33 24 D

Red coloured sand 7cm Penet for


-14.42 m 15.50 SPT 55 blows > 75 0.63 47 31 D
Quartz sand stone 3cm Penet for
-15.42 m (Residual Soil) 16.50 SPT 55 blows > 75 0.61 46 30 D

Hard Rock SPT hammer Rebound


-16.42 m 17.50 SPT

Note :
Bore Hole is Terminated at a depth of 17.50 m Below G.L
D - Disturbed soil sample UD - UnDisturbed soil sample
R - RHS - Final corrected value after Diltancy correction N''
L - LHS - Observe N Value
BH - Bore Hole , NGL - Natural Ground Level
Soil Profile at Bore Hole - 32(RHS) Location

Contractor Senior Section Engineer Executive Engineer


COS CONSULTANCY SERVICES
GEO-TECH. ENGINEERING DIVISION

BORE LOG SHEET

Name of Project: "Doubling of track between Trivandrum and Kanyakumari-Conducting Subsoil investigation for major bridges, minor bridges and
along the proposed doubling alignment at specified locations".

Chainage: 06/630 Location BH 33 RHS

Structure & No. Bridge No.26 RL of Water Table -0.28 m

Type of Boring Rotary Dia of Boring 150 mm

Date of
26.07.17 Total depth 13.50 m
Commencement:
Date of
26.07.17 RL of NGL 0.216 m
Completion:
Depth from GL (m)

correction factor in

Due to overburden

Due to diltancy
Reduced Level

pressure in N''
pressure in N'
Graphical Representation
Graphic Log

Type of Samples
of SPT
Type

Cn
15

30

45
N N Values
Visual soil Description

Red coloured Silt & clay


mixed with sand 9 1.42 13 13
-1.28 m 1.50 SPT 4 3 6 UD
Red coloured Silt & clay
mixed with sand 13 1.17 15 15
-2.78 m 3.00 SPT 3 6 7 UD
Red coloured Silt & clay
mixed with sand 12 1.04 12 13
-4.28 m 4.50 SPT 5 4 8 UD
Red coloured Silt & clay
mixed with sand 13 0.95 12 13
-5.78 m 6.00 SPT 4 6 7 UD

Red coloured sand


-7.28 m 7.50 SPT 7 9 10 19 0.88 17 16 D

Red coloured sand


-8.78 m 9.00 SPT 15 12 22 34 0.82 28 21 D

Red coloured sand


-10.28 m 10.50 SPT 24 28 34 62 0.78 48 32 D

Red coloured sand


-12.28 m 12.50 SPT 24 25 35 60 0.72 43 29 D

Hard Rock SPT Hammer


-13.28 m 13.50 SPT Rebound

Note :
Bore Hole is Terminated at a depth of 13.50m Below G.L
D - Disturbed soil sample UD - UnDisturbed soil sample
R - RHS - Final corrected value after Diltancy correction N''
L - LHS - Observe N Value
BH - Bore Hole , NGL - Natural Ground Level
Soil Profile at Bore Hole -33(RHS) Location

Contractor Senior Section Engineer Executive Engineer


COS CONSULTANCY SERVICES
GEO-TECH. ENGINEERING DIVISION

BORE LOG SHEET

Name of Project: "Doubling of track between Trivandrum and Kanyakumari-Conducting Subsoil investigation for major bridges, minor bridges and
along the proposed doubling alignment at specified locations".

Chainage: 06/643 Location BH 34 RHS

Structure & No. Bridge No.26 RL of Water Table -0.17 m

Type of Boring Rotary Dia of Boring 150 mm

Date of
27.07.17 Total depth 13.50 m
Commencement:
Date of
27.07.17 RL of NGL 0.28 m
Completion:
Depth from GL (m)

correction factor in

Due to overburden

Due to diltancy
Reduced Level

pressure in N''
pressure in N'
Graphical Representation
Graphic Log

Type of Samples
of SPT
Type

Cn
15

30

45
N N Values
Visual soil Description

Red coloured sand


-1.22 m 1.50 SPT 3 4 5 9 1.43 13 13 UD

Red coloured sand


-2.72 m 3.00 SPT 6 8 9 17 1.20 20 18 UD

Red coloured sand


-4.22 m 4.50 SPT 12 18 24 42 1.06 45 30 UD

Red coloured sand


-5.72 m 6.00 SPT 13 20 38 58 0.96 56 35 UD

Red coloured sand


-7.22 m 7.50 SPT 20 24 28 52 0.88 46 31 D

Red coloured sand


-8.72 m 9.00 SPT 24 24 25 49 0.82 40 28 D

Red coloured sand


-10.22 m 10.50 SPT 28 30 25 55 0.77 42 29 D
Quartz sand stone
-12.22 m (Residual soil) 12.50 SPT 18 20 23 43 0.71 31 23 D

Hard Rock SPT Hammer


-13.22 m 13.50 SPT Rebound

Note :
Bore Hole is Terminated at a depth of 13.50m Below G.L
D - Disturbed soil sample UD - UnDisturbed soil sample
R - RHS - Final corrected value after Diltancy correction N''
L - LHS - Observe N Value
BH - Bore Hole , NGL - Natural Ground Level
Soil Profile at Bore Hole -34(RHS) Location

Contractor Senior Section Engineer Executive Engineer


COS CONSULTANCY SERVICES
GEO-TECH. ENGINEERING DIVISION

BORE LOG SHEET

Name of Project: "Doubling of track between Trivandrum and Kanyakumari-Conducting Subsoil investigation for major bridges, minor bridges and
along the proposed doubling alignment at specified locations".

Chainage: 06/690 Location BH 35 RHS

Structure & No. Bridge No.26 RL of Water Table -0.18 m

Type of Boring Rotary Dia of Boring 150 mm

Date of
27.07.17 Total depth 13.00 m
Commencement:
Date of
27.07.17 RL of NGL 0.318 m
Completion:
Depth from GL (m)

correction factor in

Due to overburden

Due to diltancy
Reduced Level

pressure in N''
pressure in N'
Graphical Representation
Graphic Log

Type of Samples
of SPT
Type

Cn
15

30

45
N N Values
Visual soil Description

Red coloured sand


-1.18 m 1.50 SPT 4 5 7 12 1.42 17 16 UD

Red coloured sand


-2.68 m 3.00 SPT 6 7 7 14 1.20 17 16 UD

Red coloured sand


-4.18 m 4.50 SPT 12 14 15 29 1.07 31 23 D

Red coloured sand


-5.68 m 6.00 SPT 16 16 18 34 0.98 33 24 D

Red coloured sand


-7.18 m 7.50 SPT 21 22 23 45 0.90 40 28 D

Red coloured sand


-8.68 m 9.00 SPT 18 20 21 41 0.84 34 25 D

Red coloured sand


-10.18 m 10.50 SPT 20 22 23 45 0.78 35 25 D

Red coloured sand 30cm Penet for


-11.68 m 12.00 SPT 55 blows >75 0.73 55 35 D

Hard Rock SPT Hammer


-12.68 m 13.00 SPT Rebound

Note :
Bore Hole is Terminated at a depth of 13.00m Below G.L
D - Disturbed soil sample UD - UnDisturbed soil sample
R - RHS - Final corrected value after Diltancy correction N''
L - LHS - Observe N Value
BH - Bore Hole , NGL - Natural Ground Level
Soil Profile at Bore Hole -35(RHS) Location

Contractor Senior Section Engineer Executive Engineer


COS CONSULTANCY SERVICES
GEO-TECH. ENGINEERING DIVISION

BORE LOG SHEET

Name of Project: "Doubling of track between Trivandrum and Kanyakumari-Conducting Subsoil investigation for major bridges, minor bridges and
along the proposed doubling alignment at specified locations".

Chainage: 06/710 Location BH 37 RHS

Structure & No. Bridge No-26 RL of Water Table 2.24 m

Type of Boring Rotary Dia of Boring 150 mm

Date of
23.06.17 Total depth 16.50 m
Commencement:
Date of
23.06.17 RL of NGL 3.043 m
Completion:
Depth from GL (m)

correction factor in

Due to overburden

Due to diltancy
Reduced Level

pressure in N''
pressure in N'
Graphic Log

Graphical Representation

Type of Samples
of SPT
Type

Cn
15

30

Visual soil 45 N N Values


Description

Red coloured sand


1.54 m 1.50 SPT 4 4 6 10 1.40 14 14 UD

Red coloured sand #


0.04 m 3.00 SPT 4 6 7 13 1.18 15 15 UD

Red coloured sand


-1.46 m 4.50 SPT 5 6 8 14 1.05 15 15 D

Red coloured sand


-2.96 m 6.00 SPT 5 7 9 16 0.95 15 15 D

Red coloured sand


-4.46 m 7.50 SPT 6 7 9 16 0.88 14 14 D

Red coloured sand


-5.96 m 9.00 SPT 8 9 11 20 0.82 16 16 D

Red coloured sand


-7.46 m 10.50 SPT 7 16 19 35 0.76 27 21 D

Red coloured sand


-8.96 m 12.00 SPT 25 48 49 97 0.72 70 42 D

Red coloured sand


-10.46 m 13.50 SPT 25 36 40 76 0.68 52 33 D

Red coloured sand


-12.46 m 15.50 SPT 30 28 31 59 0.63 37 26 D

Hard Rock SPT Hammer Rebound


-13.46 m 16.50 SPT

Note :
Bore Hole is Terminated at a depth of 16.50 m Below G.L
D - Disturbed soil sample UD - UnDisturbed soil sample
R - RHS - Final corrected value after Diltancy correction N''
L - LHS - Observe N Value
BH - Bore Hole , NGL - Natural Ground Level
Soil Profile at Bore Hole - 37(RHS) Location

Contractor Senior Section Engineer Executive Engineer