Sie sind auf Seite 1von 47

XINWEI (Cambodia) McWiLL® Construction Project

XINWEI(CAMBODIA) TELECOM Co., Ltd.

Project Document

Version: 1 of 1

Project Name: XINWEI (Cambodia) McWiLL® Construction Project

Site Name:

Operator: XINWEI (CAMBODIA) TELECOM Co., Ltd.

Constructor: XINWEI (CAMBODIA) TELECOM Co., Ltd.

Region: Cambodia

Date:

版本:XW-CAM-201501
XINWEI (Cambodia) McWiLL® Construction Project

版本:XW-CAM-201501
XINWEI (Cambodia) McWiLL® Construction Project

版本:XW-CAM-201501
Project Name: XINWEI (Cambodia) McWiLL® Construction Project
Site Name: 0
Operator: XINWEI (CAMBODIA) TELECOM Co., Ltd.
Constructor: XINWEI (CAMBODIA) TELECOM Co., Ltd.

PAT Contents Pass Fail


Antenna installation should be fixed stably and within 45 °protection space of
1
lightning rod

2 Antenna installation location complaince with drawings.

3 Antenna mounting is firm enough.

4 Antenna direction and down tilt should be correct

5 Pole is mounted firmly and Vertically

6 Pole and mounting accessories should do anti-Rust processing

7 Tower/pole should have reliable grounding (including lightning rod)

Connector between antenna, feeders and tower amplifiers should be firm without
8
loose

Waterproof should be applied at connector between antenna, feeders, and tower


10
amplifiers.

11 Laying of feeder and power cord should be neatly without damage

12 Labels of cables should be neat and accurate

13 WWRU and tower amplifiers should be well fixed and grounded reliable

Outdoor cable tray has reliable grounding. Grounding bar should be reliably
14
connected with earthing cord

15 Feeder should have waterproofing bent before entering equipment room

版本:XW-CAM-201501
16 GPS installation should be solid and aesthetic, no block within 45 °angle above side.

17 GPS bracket should be fixed well, and connector should have reliable waterproofing.

18 Outdoor cable tray has reliable grounding

19 Outdoor earthing bar has reliable grounding

20 The laying fiber jumper should comply with specifications

21 Fiber jumper interface should be Reliable and aethetic

22 Fiber jumper waterproofing should comply with specifications

Remarks:

PAT representative of constructor PAT representative of operator


(signature): (signature):

Date: ___________________________ Date: ___________________________

版本:XW-CAM-201501
版本:XW-CAM-201501
XINWEI (Cambodia) McWiLL® Construction Project

Project Name: P.O No.


Site Name: PPF076 ( PTPP )
Operator: XINWEI (CAMBODIA) TELECOM Co., Ltd.
Constructor:

Actual
Penalty
BTS PAT Contents PASS FAIL
($)
Penalty
($)
The expansion bolts Expanding should not be higher than the
surface
Cabinet should be perpendicular, the vertical error should be ≤
3mm.
Cabinet should be horizontal, the horizontal level error should be ≤
3mm.

Gap between cabinet should be ≤ 5mm.

Cabinet feet should be cope insulation.

Cabinet installation location shall be conducive to normal operation


of the equipment and maintenance; but shall not effect the operation
Cabinet and maintenance of the existing equipment.
1 Installation
3
Cabinet appearance shall be clean, no scratches and peeling paint,
etc. phenomenon.

Without any copper scrap crumbs, line leather and waste material
inside and top of the cabinet.

Cabinet installation should be solid and reliable without shaking.

The air inlet of the cabinet is not facing the battery bank.

Cabinet shell and indoor ground bar should be reliable connected.

Cabinet grounding cable should be short and straight.

Equipment installation shall be firm and reliable.

Grounding of equipment shell shall be reliable.

Equipment appearance shall be clean, no scratches and peeling paint,


WBBU etc.
2 Installation
2

版本:XW-CAM-201602
XINWEI (Cambodia) McWiLL® Construction Project
WBBU
2 Installation
2
Equipment grounding cable should be short and straight.

Equipment installation location shall be conducive to normal


operation of the equipment and maintenance; but shall not effect the
operation and maintenance of the existing equipment.

The feeder window installation should be solid and reliable, feeder


Feeder window surrounded by silica gel or foaming agent seal.
3 Window 1
Installation The remaining feeder holes shall be block by the fireproof mud.

The different types of cables should not be lashing in the same


harness.

The laying of the cable should be straight and smooth no cross.

Cable bend should be uniform and smooth.

The bending radius of optical cable shall be bigger than its diameter
20 times.

Fiber tail bending radius ≥ 3cm.

The appearance of cable shall not have damage or aging.

Shall be banding every cable rungs, moderate intensity

Cable bending distance shall not be bigger than 40cm, need to add
cabling rack crosspiece if more than 40cm.
Power cable and Grounding cable continuse connect is strictly
prohibited.
Cable Laying
4 Process
3
Protective earth terminal should not be multiplexed

Cable laying strictly prohibited fly line.

Do the necessary protection of cable when cable cross holes or


corners, (especially fiber optic cable and fiber tail)

Cable tie clasp should be neat in a straight line, tie clasp spacing and
tied port direction shall be consistent.

Cable tie of cable should be cut flat, no sharp corner.

AC power cord and DC power cord or metal signal line should be


separate laying by channel, when condition limited can laying on the
same channel but the space between it not less than 15cm.

Fiber tail strictly prohibited banding by cable tie.

The length of grounding cable between cabinet to indoor grounding


bar is in 5m.
The length of cable beyond the copper nose cap shall not be more
than 2mm.

版本:XW-CAM-201602
Cable
5 Connection
2
XINWEI (Cambodia) McWiLL® Construction Project

Cable connection location shall be accurate

Cable
5 Connection
Cable connection shall be solid reliable no loose. 2

GPS lightning arrester shall be connect to the outdoor grounding bar.

GPS lightning arrester cell shall be insulation with equipment rack,


equipment and indoor cabling rack and other.

Label letter clear, no modify.

Label paste in the same direction, easy watch.


6 Label 2
Label attach position shall be consistent, paste beautiful.

Power cabinet strictly prohibited to use metal tag.

Construction completed, should be clean the room.

Outstanding After construction completed, feeder window and other holes must
7 Work block.
2

Need to do the equipment cleanning work after construction


completed.

Antenna surface have no bump, scrathes, etc.

Antenna Installation location shall be compliance with the Planning.

Error of direction antenna azimuth ≤ ± 5o

Error of direction antenna down tilt = 0


Antenna
8 Installation Antenna installation shall be solid and reliable. 4

Antenna installation location in 45o protection area of lightning


rod.
The top of the pole is higher than direction antenna top 10cm ~
20cm.
Distance between direction antenna and the tower is ≥ 1m.
Omni antenna top shall be lower than the next platform of the install
platform.
WRRU surface have no bump, scrathes, etc.

WRRU installation location is easy to operate and maintenance the


equipment, and don’t effect other equipment’s operation and
maintenance.
WRRU
9 Installtion WRRU installation shall be solid and reliable.
5

WRRU installation location in 45o protection area of lightning


rod.

版本:XW-CAM-201602
WRRU
9 Installtion
5

XINWEI (Cambodia) McWiLL® Construction Project

WRRU cell shall be connected to the grounding, grounding cable


shall be short and straight.

GPS installation location in 45o protection area of lightning rod.

GPS Antenna
10 Installtion GPS Installation location shall be proper and lolid.

GPS installation shall be solid and reliable.


2
Laying of antenna to WRRU jumper shall be neat appearance no
cross.

Jumper from antenna to WRRU shall be solid and reliable

Power cable and fiber optic cable laying neat appearance, fix each
rung.
Outdoor cable strictly prohibited to hung with the grounding
protection area or grounding network cable.
Outdoor cable ties should not shear flat root, should be keep 2 to
Outdoor 3mm, and no sharp.
11 Cable Laying Outdoor cable tie shall use black cable tie, strictly prohibited to use
4
white.
Laying of cable should be moderately elastic, the corner shall be
satisfied with the minimum bending radius.

Notice on the cable protection, cable jacket shall no damage.

Cable fixing card installation should be solid and reliable in a


straight line.
Cable run intor feeder window shall do the backwater bend, shall be
lower than the feeder window along 20cm.

Grounding cable of grounding bar shall be connected the nearest, the


grounding cable shall be short and straight

Multiple cables at the same location with the groudning bar


installation should be neat and beautiful.
Grounding
Angle tilt between grounding cable of the grounding bar and the
12 Bar
main cable shall be less than 15 degree.
3
Installation
Grounding lead terminal of the grounding bar shall not be
multiplexed.

Grounding lead cable of the grounding bar shall be connect down to


the ground along the lightning direction, strictly prohibited reverse.

The direction of connector waterproof enclosure tightening card slot


should be consistent

The location of connector waterproof enclosure shall be consistent


and neat appearance.
Waterproof
13 treatment
5
Waterproof of grounding bar must compliance with the technical
requirement.

版本:XW-CAM-201602
Waterproof
13 treatment
5
XINWEI (Cambodia) McWiLL® Construction Project

Waterproof encapsulation of grounding bar no exposed tendons


phenomenon

Fiber Transmission PAT Contents


① Floow EDC's request,remark the laying route details on google-
earth ,show details like which road side we run the cable;show the
cable crossing road location .
Cable
1 Laying
1.5
② Using xinwei fixing device;

③ The height: follow EDC'rule and should be a safety level for our
cable.

① 15M coiling/400m(around 8pole's distance);


2 Coiling 1.5
② Make it smoothly.

① Splicing full core at each closure;

3 Closure ② Cap type Closure:the head must be upturned,strictly sealed. 1.5

③ Horizontal Closure:must be strictly sealed.

① Make coiling before accessing to the site.

4 Site&ODF ② Put ODF in each accessing site ,splicing full core by core order. 1.5

③ Remark the label which core is using in ODF example:From


siteA To siteB

① Cable height:safety for passing any kinds of car.


Cable
5 Crossing ② Fixing device:using xinwei fixing device fix steel wire on each 1.5
road pole,tighten it.

③ No big reason, Can't always cross the road .

① Splicing loss :≤0.02db [closure、site ODF];


Splicing&O
6 TDR Test
1.5
② OTDR test result :optical core no bending curve.

① Backbone along national road ,1Label/200M.


7 Label 1.5
② Right side face to the road.

① The items below need record GPS location [Every


closure、coiling、cable corner(change road side\cross
river)、accessing site].
8 GPS Info 1.5

版本:XW-CAM-201602
XINWEI (Cambodia) McWiLL® Construction Project

8 GPS Info ② record GPS location example:


1.5
[ClosureA:11.565097;104.911566]
[coilingA:11.565110;104.991212]
[Corssing road locationA:11.58511;104.97712]

Wireless Transmission PAT Contents


. It must be applicable with planning if the space of tower is
available.
Antenna
1 Height
. In case, it is difference abit from planning but it is OK in term of 2
Line of sight
2.1. ODU Grounding properly terminated to the ground bar.

2.2. ODU Grounding properly terminated to the ground bar on the tower.

2.3. Hybrid connector is properly connected to the horn & protected


with water proof.

2.4. Hybrid cable: run properly from antenna to ODU and lock
Full view stable or not.
2 ODU &
Antenna 2.5. ODU is properly locked with ODU bracket. 2

2.6. Polarization Horizontal or Vertical based on Planning Criteria.

2.7. The connector of IF cable from ODU to IDU must be properly


connected & protected with water proof.

2.8. IF Cable must properly lock with tower from top until inlet.

3.1.The antenna must be locked stable with bracket and mounting


Full view of that collocated with tower
Antenna with
3 Bracket &
2
3.2 You must use the compass at parallel with the antenna in order to
Line of Sight verification the Azimuth is properly with planning.

1.1.IDU must be terminated properly in the rack

1.2. The LAN must be connected properly from IDU to Switch.

IDU Full 1.3. IF Connector must be properly connected to IDU.


4 View
2
1.4. Power must be terminated properly from IDU to Power Source
Supply.

1.5. All Cable that connected with IDU must be properly & nice
decorated with rack.

2.1. All Cable that connected with IDU must be have clear labeling
5 Labeling
with letter.
2

3.1. Check the LED color (Green or Red) & Please confirm with
6 IDU Status
Planning & NOC to verification.
2

Total 62 0
Remark :

版本:XW-CAM-201602
XINWEI (Cambodia) McWiLL® Construction Project
Remark :

Project Management Team Maintenance Team


(signature): (signature):

Date:______________________ Date:_____________________

版本:XW-CAM-201602
XINWEI (Cambodia) McWiLL® Construction Project

Sheet 7: Equipment Photos

1. Site View.
Site Code:

版本:XW-CAM-201501
XINWEI (Cambodia) McWiLL® Construction Project

2. Antenna Installation

Site Code:

版本:XW-CAM-201501
XINWEI (Cambodia) McWiLL® Construction Project

Site Code:-Cell-2

版本:XW-CAM-201501
XINWEI (Cambodia) McWiLL® Construction Project

Site Code: -Cell-3

版本:XW-CAM-201501
XINWEI (Cambodia) McWiLL® Construction Project

Site Code: -Cell-1

版本:XW-CAM-201501
XINWEI (Cambodia) McWiLL® Construction Project

Site Code: -Cell-2

版本:XW-CAM-201501
XINWEI (Cambodia) McWiLL® Construction Project

Site Code: -Cell-3

版本:XW-CAM-201501
XINWEI (Cambodia) McWiLL® Construction Project

Site Code: -Cell-1

版本:XW-CAM-201501
XINWEI (Cambodia) McWiLL® Construction Project

Site Code: -Cell-2

版本:XW-CAM-201501
XINWEI (Cambodia) McWiLL® Construction Project

Site Code: -Cell-3

版本:XW-CAM-201501
XINWEI (Cambodia) McWiLL® Construction Project

WRRU Installation
Site Code: -Cell-1 Site Code: -Cell-2

版本:XW-CAM-201501
XINWEI (Cambodia) McWiLL® Construction Project

Site Code: -Cell-3

GPS Installation

版本:XW-CAM-201501
XINWEI (Cambodia) McWiLL® Construction Project

Water proof bend

Indoor/Cabinet
AC box and Electric meter

版本:XW-CAM-201501
XINWEI (Cambodia) McWiLL® Construction Project

BBU and LAN Switch View

版本:XW-CAM-201501
XINWEI (Cambodia) McWiLL® Construction Project

Equipment Rack Front View

版本:XW-CAM-201501
XINWEI (Cambodia) McWiLL® Construction Project

Batteries View

版本:XW-CAM-201501
XINWEI (Cambodia) McWiLL® Construction Project

Sheet 7: Equipment Photos

1. Site View.
Site Code: KD015R1

版本:XW-CAM-201501
XINWEI (Cambodia) McWiLL® Construction Project

2. Antenna Installation

Site Code: KD015R1-Cell-1

版本:XW-CAM-201501
XINWEI (Cambodia) McWiLL® Construction Project

Site Code: KD015R1-Cell-2

版本:XW-CAM-201501
XINWEI (Cambodia) McWiLL® Construction Project

Site Code: KD015R1-Cell-3

版本:XW-CAM-201501
XINWEI (Cambodia) McWiLL® Construction Project

Site Code: KD015R1-Cell-1

版本:XW-CAM-201501
XINWEI (Cambodia) McWiLL® Construction Project

Site Code: KD015R1-Cell-2

版本:XW-CAM-201501
XINWEI (Cambodia) McWiLL® Construction Project

Site Code: KD015R1-Cell-3

版本:XW-CAM-201501
XINWEI (Cambodia) McWiLL® Construction Project

Site Code: KD015R1-Cell-1

版本:XW-CAM-201501
XINWEI (Cambodia) McWiLL® Construction Project

Site Code: KD015R1-Cell-2

版本:XW-CAM-201501
XINWEI (Cambodia) McWiLL® Construction Project

Site Code: KD015R1-Cell-3

版本:XW-CAM-201501
XINWEI (Cambodia) McWiLL® Construction Project

WRRU Installation
Site Code: KD015R1-Cell-1 Site Code: KD015R1-Cell-2

版本:XW-CAM-201501
XINWEI (Cambodia) McWiLL® Construction Project

Site Code: KD015R1-Cell-3

GPS Installation

版本:XW-CAM-201501
XINWEI (Cambodia) McWiLL® Construction Project

Outdoor/Cabinet
AC box and Electric meter

版本:XW-CAM-201501
XINWEI (Cambodia) McWiLL® Construction Project

BBU and LAN Switch View

PowerCube

版本:XW-CAM-201501
XINWEI (Cambodia) McWiLL® Construction Project

Outdoor Cabinet

版本:XW-CAM-201501
XINWEI (Cambodia) McWiLL® Construction Project

Battery

版本:XW-CAM-201501
XINWEI (Cambodia) McWiLL® Construction Project

版本:XW-CAM-201501
2013 XINWEI (Cambodia) McWiLL® Construction Project

Project Name: XINWEI (Cambodia) McWiLL® Construction Project


Site Name: 0
Operator: XINWEI (CAMBODIA) TELECOM Co., Ltd.
Constructor: XINWEI (CAMBODIA) TELECOM Co., Ltd.

No. List of assets Unit Quantity


1 Installation of Antenna including GPS Set 3
2 Install WRRU Set 3
3 Install WBRU Set 3
4 Wire install Set 3
5 Install Antenna mount Set 3
6 BTS rack Set 1
7 AC/DC and Switch Set 1
8 Battery Pcs 4
9 Power supply from meter to site Site 1
.
.
.

Authorized representative of Operator Authorized representative of Constructor


(signature): (signature):

Operator (Seal): Constructor (Seal):

Date:_____________________ Date:______________________

版本:XW-CAM-201501