Sie sind auf Seite 1von 17

Stormwater Management Plan S/D No.

: 0

0 Date: 12/30/1899

0 Designer: 0

SUMMARY INFORMATION

Site Data
Total Area: 0 acres
Zoning: 0
Number of Lots: 0
Percent Impervious: #DIV/0! %

Volume Management Calculations


Target Curve Number: 0
Proposed Curve Number: 0
Total Volume Required: #DIV/0! ft3
Total Volume Provided: 0 ft3

Nitrogen Calculations
TN Loading from Site: #DIV/0! lbs/ac/yr
Buy-down (if in NRB): #DIV/0!
0

Peak Flow Management Calculations:


Pre-Development Peak Flow: #DIV/0! cfs
Post-Development Peak Flow: #DIV/0! cfs

Wake County Stormwater Tool 12/07/2021 15:54:31


Version 2.2
Stormwater Management Plan S/D No.:
Date:

Designer:

TARGET CURVE NUMBER CALCULATION


S=
Q*=
Wake County Target Curve Numbers

Zoning District A B C D
R-80W and R-80 37 60 73 79
R-40W and R-40 41 62 75 80
R-30, R-20, R-15, R-5 43 63 76 81

Site Data:
Total Site Area: acres **Excludes Area of Exisitng Lakes or Ponds on site
Existing Lake/Pond Area: acres
Area used for Overall Density Calcs: 0 acres
Zoning District:

Soil Composition:
Hydrologic Soil Group Site Area % Target CN
A #DIV/0! 43
B #DIV/0! 63
C #DIV/0! 76
D #DIV/0! 81
100%

Target Curve Number: 0

Runoff (inches) = Q* = 0.00 inches

Wake County Stormwater Tool 12/07/2021 15:54:31


Version 2.2
0
W

Stormwater Management Plan S/D No.: 0 a


n
0 Date: 12/30/1899 d

0 Designer: 0 R
-
PRELIMINARY PLAN SUBMITTAL 8
0
R
Site Data: -
Total Site Area: 0 acres 3
(Excluding Area in Existing Water Bodies) 0
Zoning District: 0
Number of Lots:
Total Area in R/W: acres
Impervious Area in R/W: acres
Preserved Wooded Area:
(Common Open Space to remain woods
acres
or be reforested; Stream Buffers not on
lots.)

Managed Open Space: acres


(Grassed Common Open Space)
Other Impervious Surface: acres
(Impervious not on lots or in R/W)
Percent of Total Impervious
that is Disconnected: %
(50% is default. See Table 3.3.)
R-20
Lot Data:
Total Lot Acreage: 0 acres
Impervious Area per Lot: sf R-5
Assumed Wooded Area:
(Design Manual Table 3.1) 0 %
Additional Wooded Area:
(Stream Buffer or Additional wooded area on lots.
Must be recorded on Plat.) acres S target=
Average Lot Size: #DIV/0! sf Q target=
Average Percent Impervious per Lot: #DIV/0! % S post=
Percent Impervious for site*: #DIV/0! %
*Using total site area plus existing lakes/ponds

Stormwater Calculations:
Weighted CN1
Woods #DIV/0! #DIV/0! Woods
Grass/Lawn #DIV/0! #DIV/0! A
Impervious #DIV/0! #DIV/0! B
C
Proposed Curve Number:1 #DIV/0! D
WCN
Target Curve Number: 0
1
Weighted CN method represents the CN when the landuse is evenly distributed among all on-site soils (w/exemption of R/W which is D soils); It is an approximate
curve number for Post-development and should be treated as such.

Results:
Storage Volume Required: #DIV/0! cf
(Approximate locations shown on Preliminary Plan) CNc=CNp+(
Preliminary Total Nitrogen
Loading from Site:2 #DIV/0! lbs/ac/yr CNp=
2
Preliminary nitrogen loading does not include any reductions by BMPs. If loading is above
3.6 lbs/ac/yr - BMPs or a buydown will be required. R=

Wake County Stormwater Tool 12/07/2021 15:54:31


Version 2.2
Stormwater Management Plan S/D No.:

0 Date:

0 Designer:

POST-DEVELOPMENT CALCULATIONS

CURVE NUMBER:
Is Data from Preliminary Plan Still Valid?
Total Area of Lots: acres
Number of Lots:
Impervious Area per Lot: sf
% Impervious on Lots: #DIV/0! %
% Woods on Lots: %
% Impervious in R/W: %
Percent Impervious for Site*: #DIV/0! %
*Using total site area plus existing lakes/ponds

Percent of Total Disconnected Impervious: 50 % (50% is Default. See Table 3.3)

HSG Land-use CN Area (acres) %


0 #DIV/0!
0 #DIV/0!
0 #DIV/0!
0 #DIV/0!
0 #DIV/0!
0 #DIV/0!
0 #DIV/0!
0 #DIV/0!
0 #DIV/0!
0 #DIV/0!
0 #DIV/0!
0 #DIV/0!
0 #DIV/0!
0 #DIV/0!
0 #DIV/0!
0 #DIV/0!
Totals: 0 #DIV/0!

Post-Development CN = 0 % R/W Dis?

Runoff (inches) = Q* = 0.00 inches

Warnings/Notes:

#DIV/0!

Wake County Stormwater Tool 12/07/2021 15:54:31


Version 2.2
Wake County Stormwater Tool 12/07/2021 15:54:31
Version 2.2
R
/
W
R
0/
w
W
12/30/1899 /
D
w
0 /i
t
C
cu
h
rC
b
L
Yes S
o
Noe &
tc
st
G
Woods
iu (C.O.S. or Off-Lot Buffer)
S=
o
t
Q*=
tn
se
r

%impR/W=

Soil Type
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
Totals

% R/W Dis?

A
###
###
Impervious
###

###

Wake County Stormwater Tool 12/07/2021 15:54:31


Version 2.2
Stormwater Management Plan S/D No.: 0 S
e
0 Date: 12/30/1899 l
e
0 Designer: 0 c
t
PRE-DEVELOPMENT CALCULATIONS
H
S
CURVE NUMBER: G

HSG Land-use CN Area (acres) % A


98 #DIV/0! ###
98 #DIV/0! ###
98 #DIV/0! ###
98 #DIV/0! ###
98 #DIV/0! ###
98 #DIV/0! ###
98 #DIV/0! ###
98 #DIV/0! ###
98 #DIV/0! ### P
98 #DIV/0! ### a
98 #DIV/0! ### v
e
98 #DIV/0! ### d
User Defined #DIV/0!
User Defined #DIV/0! o
r
User Defined #DIV/0!
User Defined #DIV/0! B
Totals: 0 #DIV/0! a
r
e
Pre-development CN = #DIV/0!
S
o
Runoff (inches) = Q* = #DIV/0! inches iW
lo
TIME OF CONCENTRATION: o
d
Length (ft) Slope (ft/ft) Surface Cover Tt (hrs) s
Sheet Flow: ###
Sheet Flow: ###
Shallow Flow:
Shallow Flow:

Flow
Length (ft) Slope (ft/ft) n-value Area (ft2) Wetted Perimeter (ft) Tt (hrs)
Channel Flow: ###
Channel Flow: ###

Pre-development Tc = 0.08 hrs (Minimum 5 minutes) ###

Wake County Stormwater Tool 12/07/2021 15:54:31


Version 2.2
o
r
Stormwater Management Plan S/D No.: 0 B
a
0 Date: 12/30/1899 r

0 Designer: 0 e

POST-DEVELOPMENT CALCULATIONS S
o
i
W
l
o
TIME OF CONCENTRATION: o
d
Length (ft) Slope (ft/ft) Surface Cover Tt (hrs) s
Sheet Flow: ###
Sheet Flow: ###
Shallow Flow:
Shallow Flow:

Flow
Length (ft) Slope (ft/ft) n-value Area (ft2) Wetted Perimeter (ft) Tt (hrs)
Channel Flow: ###
Channel Flow: ###

Post-development Tc = 0.08 hrs (Minimum 5 minutes) ###

###

###
###

Wake County Stormwater Tool 12/07/2021 15:54:31


Version 2.2
Stormwater Management Plan S/D No.: 0

0 Date: 12/30/1899

0 Designer: 0

PEAK FLOW CALCULATIONS

CURVE NUMBER: Pre Q*

Pre-development CN = #DIV/0! Post Q*

Post-Development CNadj = #DIV/0!

TIME OF CONCENTRATION:
Pre-development Tc = 0.08 hrs

Post-development Tc = 0.08 hrs


Ia/P
PEAK FLOW: Post:
Method: TR-55 Graphical Peak Discharge Method for Type II Distribution Ia=.2*S
Qp = quAmQ* Ia/P
Where: ###
Qp = Peak Discharge (cfs) log(qu)=
qu = Unit peak discharge (csm/in) TR-55 Appendix F Qp=
Am = Drainage Area (mi2) Pre:
Q* = runoff (inches) Ia=.2*S
Pre-development Ia/P
qu = #DIV/0! csm/in ###
Am = 0.00 mi 2
log(qu)=
Q* = #DIV/0! inches Qp=
Q1-year = #DIV/0! cfs

Post-development
qu = #DIV/0! csm/in
Am = 0.00 mi2
Q* = #DIV/0! inches
Q1-year = #DIV/0! cfs

#DIV/0!

Wake County Stormwater Tool 12/07/2021 15:54:31


Version 2.2
Stormwater Management Plan S/D No.:

0 Date:

0 Designer:

PROPOSED STORAGE DEVICES


Enter only runoff volume below that will be infiltrated or drawn down over 2 to 5 days. Additional
volume provided in devices should not be entered in this worksheet.
Storage Volume
Name/Location Type of Device Provided (ft3) Additional Comments
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20

Total Volume Provided: 0 ft3


#DIV/0! #DIV/0! #DIV/0!
Volume Required by Wake
County Ordinance: 0 ft3

Minimum Volume Required to Meet Peak


Flows for Neuse Rules: #DIV/0! ft3 #DIV/0!

Total Volume Required: #DIV/0! ft3

Post-Development Curve Number Adjustment based on Volume Provided


Source: "Modeling Infiltration Practices Using TR-20", October, 1983, Maryland Department of the Environment
200
CNadj =
(P+2Q+2) - (5PQ+4Q2)1/2
Where:
P = Rainfall (inches) = 3 inches
Q = Runoff Depth for Proposed CN (Q*) - Volume Provided (inches)

Volume Provided (Inches) = #DIV/0! inches


Q* = 0.00 inches
Q= #DIV/0! inches
Post-Development CNadj = #DIV/0!
Wake County Stormwater Tool 12/07/2021 15:54:31
Version 2.2
Wake County Stormwater Tool 12/07/2021 15:54:31
Version 2.2
0

12/30/1899

ays. Additional
.

omments

#DIV/0!

Wake County Stormwater Tool 12/07/2021 15:54:31


Version 2.2
Wake County Stormwater Tool 12/07/2021 15:54:31
Version 2.2
Stormwater Management Plan S/D No.:

0 Date:

0 Designer:

NITROGEN CALCULATIONS

TN export TN export
coefficient from use
Type of Land Cover Area (acres) (lbs/ac/yr) (lbs/yr)
Permanently protected undisturbed open
space (forest, unmown meadow) 0.00 0.60 0.00
Permanently protected managed open
space (grass, landscaping, etc.) #DIV/0! 1.20 #DIV/0!

Impervious surfaces (roads, parking lots,


driveways, roofs, etc.) #DIV/0! 21.20 #DIV/0!
TOTAL 0.00 #DIV/0!
Nitrogen Loading w/out BMP Reductions: #DIV/0! lbs/ac/yr
Neuse Buy-down w/out BMP Reductions: #DIV/0!

Nitrogen Loading with BMP Reductions


See Wake County Stormwater Design Manual Chapter 4 for Details

Drainage Area 1:
TN coeff. TN export
Type of Land Cover Area (acres) (lbs/ac/yr) (lbs/yr)
Permanently protected open space 0.60 0.00
Managed open space 1.20 0.00
Impervious surfaces 21.20 0.00
TOTAL 0.00 0.00
Nitrogen Removal Efficiency of BMP(s) %
Nitrogen Loading for DA 1: 0.00 lbs/ac/yr
Drainage Area 2:
TN coeff. TN export
Type of Land Cover Area (acres) (lbs/ac/yr) (lbs/yr)
Permanently protected open space 0.60 0.00
Managed open space 1.20 0.00
Impervious surfaces 21.20 0.00
TOTAL 0.00 0.00
Nitrogen Removal Efficiency of BMP(s) %
Nitrogen Loading for DA 2: 0.00 lbs/ac/yr
Drainage Area 3:
TN coeff. TN export
Type of Land Cover Area (acres) (lbs/ac/yr) (lbs/yr)
Permanently protected open space 0.60 0.00
Managed open space 1.20 0.00
Impervious surfaces 21.20 0.00
TOTAL 0.00 0.00
Nitrogen Removal Efficiency of BMP(s) %
Nitrogen Loading for DA 3: 0.00 lbs/ac/yr

Final Nitrogen Loading from Site: #DIV/0! lbs/ac/yr

Wake County Stormwater Tool 12/07/2021 15:54:31


Version 2.2
Buy-down (Neuse Only): #DIV/0!

Wake County Stormwater Tool 12/07/2021 15:54:31


Version 2.2
0

12/30/1899

###
###
###
###

Wake County Stormwater Tool 12/07/2021 15:54:31


Version 2.2
Wake County Stormwater Tool 12/07/2021 15:54:31
Version 2.2

Das könnte Ihnen auch gefallen