Sie sind auf Seite 1von 156

SCFT Procedure

Prepared by:
Samsung
Course Name: SCFT Procedure
Course Objective Who should attend
This module will enable participants to Field engineers
understand how to conduct SCFT
Drive test Engineers
This module will also help to understand
the Work Flow Management for
RF Leads / Area Managers
SCFT(WAS-SCFT)using online portal
SITFORGE.
Session -1 Session -2
• SCFT Tests •SCFT -S4 Mini/ troubleshooting Guide

Lunch break
• SCFT Tool • Important Notes
(XCAL mobile - software version • Hands on exercises
Day 1 Operational Process
• SCFT WAS Workflow
•SCFT Siteforge module
Document History

Edition Date of Issue Author Remarks

SCFT Drive test is to be done only within Best server plot


Samsung
Ver 5.0 14Aug2014 of the site and only a single
Training Team
road towards neighbor site is to be driven

Samsung Merged SCFT process and WAS into one slide


Ver 6.0 15 Oct 2014 Training Team Updates : Merged SCFT process and added siteforge
(HD) WAS

Samsung Updated the SCFT issues as per guidelines for Solpars


Ver 7.0 28 Oct 2014 Training team Updates : As per solpar field issues listed added and or
(HD) modified slides #11, 37, 38, 39
Updated the SCFT issues as per guidelines for Solpars
Samsung
Updates : As per solpar field issues listed added and or
Ver 8.0 01 Nov 2014 Training team
modified slides #40, 52, 53
(HD)
Samsung
Training team Accelerating SCFT Process change recommendation
Ver 8.1 13 Jan 2015
Ashish Shukla From Slides 84 to 107
Good to know
Keep your mobile phone in the silent mode during the session

Need to sign attendance sheet at the start and end of each day

At the end of each training post test will be conducted

Stick to break timings

Your valuable feedback will be taken at the end to enhance training experience

For logistics support contact the co-ordinator


Agenda
Health & Safety Requirements

Introduction to SCFT
 What is SCFT
 Overview of SCFT Process
 SCFT Workflow
 Roles & Responsibilities

SCFT Requirements
 Lead time
 Tools

Preparations for SCFT


 TSSR Review
 eNB Parameter Review
 Drive Route
 Checklists
Agenda
Physical Site Check
 Measurements of height, azimuth, tilt

Drive Test
 SCFT Stationary test
 SCFT Moving test
 Checklist during drive
 Post SCFT Drive

SCFT Tool(XCAL mobile - software version v4.09.139 ) Operational Process


 Stationary test
 Moving test

SCFT S4 Mini Trouble shooting guide


Important Notes
Introduction to SCFT
Single Cell Functional Test (SCFT)

Verification of
 Availability and performance of
desired services
 Physical configuration of the eNodeB
for each sector
 Correct installation and configuration
((( ((( of the eNodeB

Testing specific services at the site and


while driving around the site
SCFT Process
Instruction from SOLPAR
Preparation for SCFT
Project Manager

Physical checks of eNB site

No Adjust Antenna
Pass Parameter and
SOLPAR
etc.
Scope Yes

Drive Test

Submit SCFT report to RJIL


SCFT Team Composition

SOLPAR PM

DT Engineer
DT Engineer
Roles & Responsibilities – SOLPAR Project Manager
Daily tracking of progress status

Extend support to circle SCFT Team for their minor & critical issues.

Interact with Samsung on Progress Management: Daily, Weekly,


Monthly basis.

SCFT Team Management and site allocation to DT Engineers,


Riggers & Car drivers.

Validation of drive routes, discussion of issues, site performance


analysis

Support field team for troubleshooting and any other support


during SCFT activity

Prepare the RF Database and data backup of all drive related tests
( including any snaps) and provide to Samsung
Roles & Responsibilities – SOLPAR DT Engineer
Perform Field Test: DT testing and data collection during -
SCFT/Cluster Optimization

Check site information & change Ant. Parameters

Carry all the necessary tools in field

Rigger will check site as per the checklist

Rigger will make corrections on site and inform Drive Test Engineer

Drive Test Engineer will create the drive routes & configure the
Smart S4 mini as per defined test scenarios

Drive Test Engineer will save the log file. In case of handoff fail, bad
RSRP, call drop etc., inform respective teams immediately
Summary
Strictly follow all the health & safety guidelines

SCFT verifies the availability and desired performance of a site

SCFT involves physical & parameter check of eNodeB, corrections if needed,


followed by a drive test around the site

SCFT team consists of an DT engineer, Rigger and Car driver with well-defined
roles and responsibilities for all
Quiz
You find that the antenna azimuth is incorrect. You will _________

• Correct it, log and report the error and then proceed with drive test
• Proceed with the drive test and report it later
• Cancel the drive test

During the drive test, handover fails. You will _______

• Continue with the drive test as it is


• Report it to the respective team before continuing
• Cancel the drive test

EMF survey is conducted by rigger_______

• Before the SCFT drive


• After completion of the SCFT drive
• In parallel with the SCFT drive
SCFT Requirements
Tools Required
S.No Tool Name Description Specification
Must have cigarette lighter point for
1 Vehicle with AC Driving test & power supply
connecting the power inverter
2 Power inverter DC to AC Over 500W

Need 2 test mobile phones


- DL, UL and VoLTE test
Smart phone (with D - SIM card to support from RJIL
3 UE with XCAL
M application) - 2 EA Charger
- 2 EA Extra battery (Optional)
- 2 EA Smart phone holder

4 Compass Measurement of antenna azimuth

5 Tilt Measure Measure the antenna tilt


Laser meter or measu If using measuring tape, above 50 m
6 Require to check the antenna height
ring tape eters
Multi tab Extension cable for connections of lap
7 Over 5 Ports
(Power extension) top etc.

8 Spanner Adjustable spanner 1 set

9 Handset S4 Mini 2 nos

10 Tool kit Rigger tool kit, for physical changes 1 set


UE (Smart phone) Testing
Check performance of the smart tool DM at least twice a month, e.g. in the 2nd
and 4th week of the month

Check at a location where following coverage criteria are met

• RSRP : better than -70dBm


• SINR : better than 23 dB

Check based on RF parameters RSRP, SINR, Throughput, MCS, CQI etc

Maintain a detailed sheet to identify the best performing Smart DM tools

Maintain performance check records with history as per the attached sheet

Appendex-Smart DM
performance management.xls
Preparations for SCFT
Preparations for SCFT
S4 mini mobiles should be ready with
Get Site Access Confirmation from SOLAPR fully charged condition along with
PM mobile charger, Mobile holder,
Inverter, 4 points spike guard

Check the alarm status from LSMR engineer


and ensure not to have any service affected Rigger readiness along with tool kit
alarm on site and safety Kit (Safety belt, Safety
Shoes & Helmet)

7)
SOLPAR Engineer will collect the TSSR Report
If wall mount antenna or
& Cell ref file from SOLPAR PM who in-turn
Highway/Flyover mount site, then
shall collect the TSSR report & Cell ref file
accordingly arrange extra wall
from Samsung circle RF Lead
mount rigger with rope etc and
hydraulic vehicle (by informing
SOLPAR PM and Samsung area
Check other tools readiness like magnetic manager) in advance respectively
compass, tilt meter and laser meter Important:
no Test can be carried out if the handset. Is less
than 10% charged
Preparations for SCFT…

eNB Parameter
TSSR/Cellref
Verification Drive Route Checklist
Review
from LSM-R
Preparations for SCFT…
Technical Site Survey Report (TSSR)/ Cell ref info

Ensure that the site is verified as per TSSR/Cell ref file, any deviation need to
report Samsung immediately
Attached annexure-1 for the same to be filled up and handed over to SOLPAR
PM, who later sends it over to Samsung RF manager.
In case of any deviation in the same it needs to be corrected in cell ref file/field
before proceeding for the drive.
If it’s a RP1 site and On field data does not match with cell ref file then no need
to rectify physical parameter at field but need to correct only cell ref file.
Preparations for SCFT…
Technical Site Survey Report (TSSR/Cell ref)

• Site Name, and Site Address


• Site location in terms of LAT/LON
• PCI
Site information

• Antenna Azimuth, Antenna Height, Antenna Tilt(electrical tilt)


• Antenna physical blockage in main/side lobe (if any)
Antenna • Tower type (RTT, Wall mount, Pole mount, GBT) in case of wall mount arrange extra wall mount rigger with rope
parameters

• Outdoor Analysis of signal strength for outdoor coverage


• Indoor Analysis of signal strength for indoor including penetration loss
Simulation • Worst Area Analysis by Simulation Plot
(Coverage Statistics
– RSRP)

Important: Check alarms before moving to site for SCFT


Preparations for SCFT…
Technical Site Survey Report (TSSR/Cellref)…

• Satellite map: Pre analysis for service area. Google earth snapshots of actual locations and
populated areas
• Vector Map: Refer during drive test.
Satellite &
Vector maps

• eNB installation information such as Antenna Pole Location


• Antenna direction in terms of Azimuth
• Location of ODU (outdoor unit) or shelter room of eNB
Site drawing • Location of other operator Antenna Pole & Shelter room
map
Preparations for SCFT…

eNB Parameter
TSSR /Cell
Verification Drive Route Checklist
refReview
from LSM-R
Preparations for SCFT…
eNB Parameter Verification from LSM-R

SOLPAR Project Manger instructs solpar Field engi


SOLPAR PM OPT Engr neer to collect eNB parameters from LSM-R engin
eer(Samsung)

SOLPAR DT engineer will act accordingly and reque


SOLPAR DT st status of eNB parameters from LSM-R engineer
Engineer (for alarms and site readiness verification)

LSM-R engineer will instruct DT Engineer (SOLPAR)


If site has service impacting alarm that need site
visit by deployment team, then the DT Engineer sh
all move over to the next site as assigned by
SOLPAR Project manager.
SOLPAR Project Manager has to keep
Samsung circle RF lead in loop for all
communication
Preparations for SCFT…
Line items to be checked by LSMR engineer before the SCFT are as follows:

Site operational status (Site should be ON)


Site should be free from service affecting alarms (like VSWR etc.)
Identify and inform the latest PCI for both the test site and the neighbor sites
(if the cluster is already launched) with LSMR engineer before moving to the
site. Neighbor site PCI can be taken from LSMR engineer.
SCFT site vital parameter needs to be checked like ANR enabled, Handover
defined etc.
PCI,Cell,TAC
ID
Smart
TX power
scheduler
from LSMR
OFF

Configuration
MIMO Type Parameters SON, ANR
(2x2, 4x2)
features
from LSM-R

MIMO
Access class
Mode
barred for
(TM3/TM4)
other UEs
from LSM-R
Preparations for SCFT…
eNB Parameter Verification from LSM-R

• Site down
• High drop Rate
Service Affecting • Low Tx Power
Alarms • GPS Alarm

• VSWR should be <1.5

VSWR values

• Tx Power is transmitted power from eNB station, measured Watts or dBm. Typical
value is 10W or 40dBm
Tx Power
Preparations for SCFT…
eNB Parameter Verification from LSM-R

RF Parameters eNB Installation Information

Handoff Parameters, PCI Parameters, ANR List -


eNB installation ATP completed
Neighbor List.
Preparations for SCFT…

eNB Parameter
TSSR Review Verification Drive Route Checklist
from LSM-R
Drive Route Basics

All sectors to be covered during the test

Carry a hardcopy of the drive route direction, while DT reaches the

Instruct the driver to follow the drive route


Drive Route Guidelines
Best server plot Drive route to be collected by SOLPAR DT engineer from Circle RF
Lead before he reaches the site.
All motorable roads covering all three sectors of the site are to be driven. The
motorable roads which are not accessible or can’t be driven due to any blockage
should be captured with a snapshot for proof.
If SCFT is performed on a standalone site then each sector to be driven up to serving
cell RSRP as per morphology in the main lobe as defined in under mentioned table:

Morphology Type Coverage Threshold (RSRP dBm)


Dense Urban -107
Medium Urban -110
Suburban -113
Rural -116

Morphology RSRP levels


Drive Route Guidelines..
If SCFT is done on a site that is not a standalone site and the neighbor site is radiating
then the drive route should be done until the handover happens with the neighbor site,
but if the Neighbor site is not radiating then the drive should be done until neighbor site.
The stationary test should only be done in the main lobe of serving antenna
DT Engineer will instruct the car driver for the direction to be followed based on pre-
defined drive route based on GPS location in drive test tool. Engineer will carry the drive
route handmade copy, during the SCFT test.

Drive Test Route Sample


Drive Route Example

Minor
Major Road
Road

More than one


One lane
lane

Important road A side road may


that leads from be a narrow
one town or street off a
city to another major street
Preparations for SCFT

eNB Parameter
TSSR Review Verification Drive Route Checklist
from LSM-R
Check list for DT Engineer

Site access confirmation to be done in advance via Samsung area manager and
DT should get in touch directly with the person having key to the site.
Confirmation from Samsung area manager for eNB Commissioning (ATP–11B)
to be passed without any punch points before going for SCFT.
Two S4 mini mobile phones fully charged and mobile chargers should be ready.
DT and rigger ID proof and Reliance representative authorization letter
(multiple photo copies) of the DT and rigger having permission from RJIL to
conduct DT on behalf of RJIL (letter should not be site specific rather it should
be in general so that the same can be used in all sites). This letter to taken
from SOLPAR project manager who will get this letter from Samsung Area
Manager.
Site TSSR/Cell ref to be checked in advance, orientation and lat/long of site and
antenna location type (in case of wall mount antenna, extra riggers to be
arranged one day in advance, prior to the test)
Check list for DT Engineer…
Site access confirmation to be done in advance via Samsung area manager and
DT engineer should get in touch directly with the site owner
Magnetic compass to measure azimuth
Laser meter or measuring tape to measure antenna height
Tilt meter to measure the antenna tilt.
S4 mini should have adequate space to store snaps taken by mobile in case of
drive getting obstructed.
Car with Cigarette lighter Inverter, spike guard and mobile holder for the
mobile to stick on dashboard over the holder
Hydraulic vehicle in case of highway/road/Flyover mounted sites, request
should go over to SOLPAR PM and Samsung area manager a day in advance
who will gets in touch with Reliance area manager for the same.
Fill up the attached Annexure (Total 3) as in check list and handed over to
SOLPAR PM, who sends it over to Samsung RF manager.
Handset should be fully charged else no Test can be carried out by the handset
Check list for Rigger

Weather proofing kit.


Tool Kit (Spanners/Knife/Hammer/Cable Tie etc.)
Connector making tools for loose connectorization.
Safety belts
Safety shoes
Helmet
Rope with board and extra riggers (with full protective gear) in case of wall
mount sites.
First aid box
Attached annexure 3 for the same to be filled up and handed over to SOLPAR
PM, who sends it over to Samsung RF manager.
Check FTP Connectivity

FTP server
Connectivity

Check FTP server


connectivity before SOLPAR RF engineer to has confirm
leaving the site FTP server connectivity before leaving
to the site

No
OK

Contact Circle Yes


Samsung RF lead
team for the Proceed to the site
resolution
SOLPAR RF engineer to has confirm
Check FTP server FTP server connectivity upon reaching
Yes to the site
Resolved connectivity on site

Yes
No
OK

Yes

Start testing
Summary
Perform regular testing of drive-test UE’s

Preparations for SCFT consist of TSSR review, eNB parameter verification from
LSM-R, availability of drive route and checklists. Before proceeding to the site
make sure you have these

TSSR gives details about eNB physical parameters such as antenna height,
azimuth, tilt, pictures of obstruction, site drawings and map views

LSM-R parameters include details such as VSWR, Tx power and PCI

Ensure FTP connectivity before proceeding to site

Cover all sectors during the drive


Physical Checks at Site
Physical checks during site survey
Physical verification of site with respect to data given in TSSR/Cell ref. Need to
check under mentioned points.
Once DT engineer reaches the site he should validate the PCI as seen on field
with cell ref file and then perform a walk test around the site in clockwise and
anticlockwise direction for checking the inter-sector handover and correct PCI
as seen in cell ref: file.
Site location in terms of Lat/Long, Site name and address, Antenna azimuth,
Antenna height, Antenna Tilt (Mechanical Tilt), Antenna physical blockage in
main/side lobe (if any) & Tower type.
If there is any deviation in actual versus TSSR/Cell ref then SOLPAR engineer
will try to rectify it on field with due permission from Samsung RF lead and if
he is unable to do so then the same shall be informed to Samsung and the DT
should move over to the next site.
If the deviation cannot be corrected as confirmed by Samsung RF lead, then
the same has to be updated in site forge by the DT engineer.
Physical checks during site survey
Only after completing physical verification and passing the same SOLPAR
engineer will start performing SCFT activity.
In case of tower/antenna access issue from bird nests, honeybees comb etc.
the corresponding Samsung area manager should be informed and DT should
move to the next site.
SCFT once started should be completed within the same day, until and unless
there is some constraint that is making the process shift to other day.
Physical blockage in direction of serving antenna should be noted and
snapshot should be taken. The same comment with snaps has to be updated in
the SCFT report by SOLPAR project manager. The SCFT has to be carried on
however.
Measuring Site Co-ordinates
Check the battery of GPS (72 channel GPS)
Point GPS towards clear, open skies for accuracy
GPS Setting time >5 min & GPS number of satellites > 4
Low Battery voltages and rare Geomagnetic storms may result in erroneous
GPS readings
GPS should not be used for Ground Elevation readings as the inaccuracy can
be well over 30m
Stand in the center of the site location (GBM, RTT,RTP)
Once the satellites are acquired, note co-ordinates for N & W in degree - de
cimal format.
Update this information into check list for pre-post comparison and for data
base tracking
Checking Antenna Azimuth
Stand in front of the Antenna
When taking compass readings, keep at least 8m distance from any magnetic,
metal, or current carrying structures such as towers, vehicles, or cables for
correct readings
Open compass and wait a moment till the compass needle is stationary
Check the antenna azimuth with reference to North & measure the value in
degrees
Compare the observed value with the one in the TSSR
In case a mismatch is detected, make corrections on site
Mention the values in the check list for pre-post comparison and for database
tracking
Check Azimuth – marking on map
Check the service direction of the antenna
Mark the main serving direction of the antenna on the map
Tower Height Measurement – Laser Meter

Stand on the edge of tower

Press start button and then press “measure” button

Wait for 2-3 minutes or check the ground or building


from the built-in binoculars in the laser meter

Press the “measure” button again

Take pictures of the value in meters


Tower Height Measurement - Tape
Drop the measuring tape from the edge of the tower platform
Team member at the ground end will record the value
Antenna Height – RTP / RTT
Antenna Height – GBT / GBM
Compare the value on TSSR with actual
result
Correct the Antenna Height if mismatch
with TSSR Report
Antenna Mechanical Tilt Measurement
Bring tilt measure in contact with antenna on the back side & center(①)
Adjust the tilt measure (②) to level off (③)
Check tilt of antenna (④), as per the picture red line is on 3rd mark from zero, w
hich means that the tilt is 6 degrees {one mark = 2 degree and consider the bott
om scale}
Compare the value on TSSR with actual result
Correct the Mechanical Tilt in case of mismatch with the TSSR Report
Mention the values into check list for pre-post comparison and for database trac
king
To change tilt, loosen all nuts, adjust tilt as desired and then tighten them
Drive Test
SCFT Drive Test
After completing physical verification, SOLPAR engineer will start performing
drive test.
Drive test to be performed on all motorable roads.
The mobiles need to be attached on car dashboard while doing drive test.
Check FMS server connectivity to site by downloading test scenarios on “XCAL
Auto Mobile” over mobile.
SCFT drive test activity has two type of tests.

1. Stationary Test
a. Attach
b. VOLTE Short call

2. Moving Test
a. FTP -DL
b. FTP -UL
Stationary Test ( Alpha Sector)
Stationary Test Procedure:

Drive test engineer will start the drive test activity with stationary test.
Move over to Alpha sector and perform following activities
Latch on alpha sector PCI and RSRP, it should have a stable dominant RSRP
level from serving cell, and neighbor cells should not be dominant.
Check GPS status and select destination value of co-ordinates from map
window.
Assign “Stationary-1” call setting with Cycle information & site details, (CYCLE
should remain the same until the complete SCFT test (STATIONARY & MOVING)
ends), if you have to restart the test cause of any issue then issue new and
different cycle number, but it should be same for stationary and moving test
(ideally it should be incremented by 1, every time you repeat the test on same
site), cycle is a reference for naming the log files.
Stationary Test( Alpha Sector)…

Perform under mentioned test by pressing “AUTO CALL” over the s4 mini
phone.
. Stationary Test
a. Attach
b. VOLTE Short call

At the end of “Auto call” press status as “In Progress”.


Press “Auto DRM/DRX Upload” button which is popped up & wait for upload to
finish.
Stationary Test(Beta Sector)

Drive test engineer now moves over towards Beta sector and
performs the following activities during stationary test:
 Check PCI
 Assign “Stationary-2” call setting with cycle information & site details
 Perform under mentioned test by pressing “AUTO CALL” over s4 mini
handset.
a. Attach
b. VOLTE Short call

 At the end of Auto call press status as “In Progress”.


 Press “Auto DRM/DRX Upload” button which is popped up & wait
for upload to finish.
Stationary Test( Gamma Sector)

Drive test engineer shall move over towards Gamma sector and perform the
following activities during the stationary test
 Check PCI and latch to it.
 Assign “Stationary-3” call setting with cycle information & site details
 Perform under mentioned test by pressing “AUTO CALL” over s4 mini
handset.
a. Attach
b. VOLTE Short call
 At the end of “Auto call” presses status as “Completed”.
 Press “Auto DRM/DRX Upload “button which is popped up & wait for
upload to finish
Moving Test
After completion of “Stationary” test now the DT has to go for the “Moving test”, drive test
engineer will use two S4 mini handsets.
There will be two different tests that shall be performed on these handsets.
 One handset for DTDL
 One handset for DTUL
“Moving test” call logging should start by performing a walk test around the site in clockwise and
anticlockwise direction for checking the inter-sector handover within the SCFT site and checking
the correct PCI as seen in cell reference file.
Drive test engineer will carry out the remaining part of moving test while in car in a continuous
log.
Keep checking the PCI of serving cell so as to confirm handover between neighbors of same site.
 Move from Alpha sector to Beta sector to check handover between them.
 Move from Beta sector to Gamma sector to check handover between them.
 Move from Gamma sector to Alpha sector to check handover between them.
 Move from Alpha sector to Gamma sector to check handover between them.
 Move from Gamma sector to Beta sector to check handover between them.
 Move from Beta sector to Alpha sector to check handover between them.
 Make “Coverage footprint” of each sector in all possible drive routes based on Morphology based RSRP
Levels.
 After finishing the clockwise / anti-clockwise routes, You must run through DTR (Drive test route) provided
to you by Samsung RF lead

 NOTE : Samsung RF lead has to provide DTR based on best server plot , as per example attached below. Or
Alternately Samsung RF lead must follow procedures provided by National RF Optimization team to prepare
DTR , This is Mandatory
Moving Test…

Important: If handovers are not happening between neighbor cells then stop the drive
and call up LSMR engineer for handover definition or any alarms related to the same,
and resume the drive, post the resolution of the same.

Press “Stop” after completion of drive on both handset( based on steps


as above) and press status as "Complete” .
Press “Auto DRM/DRX Upload” button which gets popped up in both
handset & wait for upload to finish.
Ask the LSMR engineer to lock the site.
Inform the SOLPAR PM and Samsung area manager about the completion of
the drive and move for the next drive if time permits for the day.
Checklist during drive

If any Attach fail, /Access fail, Handover fail, Sector swap are observed during
drive test then call should be immediately stopped and LSMR engineer should
be contacted for any running alarm. Later fresh drive for the same should be
done post rectification.
During drive test and eNB physical verification if any physical obstruction due
to which drive couldn’t be done on that road then SOLPAR DT engineer needs
to take the snapshot and pass it over to Solpar PM.
If SOLPAR engineer can’t drive around in the clockwise or anticlockwise
direction then he has to mention the reason against the same along with a
snapshot proof. Also if for the stationary test, SOLPAR engineer is unable to go
into the main lobe while still in car, then he must try to walk and go into major
lobe of the sector, if even that is not possible then he should take snaps to
support the same.
The SOLPAR engineer should not wait more than 30 mins (post escalation to
LSMR and self troubleshooting) for any issue resolution at the site. If issue
resolution is taking time, then he should move to the next site.
Post SCFT Drive

All snapshots post SCFT (road and antenna obstructions) should be taken and
sent to SOLPAR Project Manager/ Samsung Area Manager/Circle RF Lead.
Backup of log files in memory card to be taken by the DT (this will required if
any file got corrupted during upload). Same to be handed over to Circle RF
Lead.
Contact LSMR Engineer to lock the site (all three sectors).
Handover the keys back to from where they were taken.
Inform the Solpar PM and Samsung RF lead about completion of the drive test.
Move over to the next site.
SCFT Tool
(XCAL mobile - software version v4.09.139 )
Operational Process
SCFT Tool(XCAL mobile) -Operational Process
Stationary Test:

Please follow below step by step process, in order to conduct SCFT automation
process on XCAL Auto call
Only 1 mobile is used for Stationary test.
The screenshots are only applicable to handset software version v4.09.139
Start Samsung S-4 Mini testing handset.
SCFT Tool Operational Process – Stationary Test
Start “X-Cal Auto” on handset and wait for IP framing Message.

Press GPS unlock message (If it appears)


SCFT Tool Operational Process – Stationary Test(Alpha Sector)

Wait for GPS to latch with satellite

Latch on Alpha PCI and start from Alpha Sector.


SCFT Tool Operational Process – Stationary Test(Alpha Sector)…

Go to “Report mode” and select the same. As depicted in below screenshots.


SCFT Tool Operational Process – Stationary Test(Alpha Sector)…

“GPS Selection”: Give destination value of Co-ordinates from map window of


handset (if location not automatically pointed, then do it manually—by
pressing “GPS value” and once map can be seen then locate your position on
map, and pressing and holding the probable area where you might be based
in. manual process shown below) ,green dot of GPS shall appear then press
“Back” button( as shown in third screen shot) and check if GPS coordinates
have appeared on screen. GPS is latched now.
SCFT Tool Operational Process – Stationary Test(Alpha Sector)…

Download name of the cluster by pressing “Down” on Handset.


After pressing “Down”, name of cluster (MUMB-0107 here) in which the
Lat/long is lying shall pop up, select it.
SCFT Tool Operational Process – Stationary Test(Alpha Sector)…

By pressing “Setting” in main window assign under ‘Select type’, “SCFT” and
then under ‘Test type’ “STATION 1” (refers to stationary 1 test) and then under
‘Site’ select “Site name” and select “Cycle number” under ‘Cycle’ and press
“Save”. (CYCLE should remain the same until the complete SCFT test
(STATIONARY & MOVING) ends), if you have to restart the test cause of any
issue then issue new and different cycle number, but it should be same for
stationary and moving test (ideally it should be incremented by 1, every time
you repeat the test on same site), cycle is a reference for the log files.
By pressing “Setting” in main window assign under ‘Select type’, “SCFT”
SCFT Tool Operational Process – Stationary Test(Alpha Sector)…

Under ‘Test type’ “STATION 1” (refers to stationary 1 test) and then under ‘Site’
select “Site name”
SCFT Tool Operational Process – Stationary Test(Alpha Sector)…

Select “Cycle number” under ‘Cycle’ and press “Save”.


SCFT Tool Operational Process – Stationary Test(Alpha Sector)…

In same handset by pressing “Scenario” in main window select “SCFT” and


then press “OK” over the prompt “SCFT change scenario”. Now press “Start”
under “Autocall”.
SCFT Tool Operational Process – Stationary Test(Alpha Sector)…

You can see the following test happening one by one.


SCFT Tool Operational Process – Stationary Test (Alpha Sector)…

At the end of ‘Autocall’ press status as “In Progress” (Msg which is popped up)
Press “OK” for ‘Auto DRM/DRX upload’ prompt which is popped up & wait for
upload to finish.

After the upload is done for Stationary 1 test, it will prompt for “Do you want
to perform Stationary 2”. Now go for stationary 2(Beta sector) test.
SCFT Tool Operational Process – Stationary Test (BETA Sector)
Now move to Beta Sector and latch to Beta sector PCI.

Press “OK” in handset for “Do you want to perform stationary 2” prompt.

Next under ‘Autocall’ press “Start” in main window (other setting remains same
as in Stationary 1) & repeat the procedure as done in “Stationary 1” test from
Auto call “Start” up-till file upload, make sure the Cycle remains the same.

Press “In Progress” after end of auto call in beta sector and then press “Ok” for
“Do you want to upload right now” prompt.
SCFT Tool Operational Process – Stationary Test( Gamma Sector)
Now proceed for Gamma sector, latch to Gamma Sector PCI for “Stationary-3”
test and repeat the process as done in Beta sector.
The difference here being that when the test ends the file upload status should
be selected as “Complete” instead of “In progress ” which was done while in alpha
and beta sectors.
SCFT Tool Operational Process – Moving Test
Under Moving test, follow the under mentioned steps in both handsets as
depicted.( this step is same as done in stationary test)
SCFT Tool Operational Process – Moving Test…
Select “GPS” in both handsets as was done in stationary mode. ( this step is
same as done in stationary test)

After selecting GPS, download name of the Cluster by pressing “Down” on


both handsets. After pressing “Down”, name of cluster (MUMB-0179 here) in
which the Lat/long is lying shall pop up, select it. ( this step is same as done in
stationary test)
SCFT Tool Operational Process – Moving Test…

In both handsets Press “Setting” in main window and press “Select type” as “SCFT” and then “Test
type” as “Moving” and then under “Site“ select “name of the site” and “Cycle number” and press
“Save”. (CYCLE should remain the same until the complete SCFT test (STATIONARY & MOVING)
ends). if you have to restart the test cause of any issue then issue new and different cycle number,
but it should be same for stationary and moving test (ideally it should be incremented by 1, every
time you repeat the test on same site), cycle is a reference for the log files.

Press “Setting” in main window and press “Select type” as “SCFT” and then “Test type” as
“Moving”
SCFT Tool Operational Process – Moving Test…
Under “Site“ select “name of the site”

Press “Cycle number” and press “Save”


SCFT Tool Operational Process – Moving Test…
Press “DTDL” in one and “DTUL” in other handset respectively and then press
“OK” for ‘DTDL/DTUL change scenario on both handsets.

Press ”Start” under ‘Autocall ‘ in both handsets. Check the traffic should get
started on both handset .
SCFT Tool Operational Process – Moving Test…
Now do walk test around the site from to confirm inter sector handover from Gama
to Alpha, Alpha to Beta, Beta to Gamma and then reverse from Gamma to Beta,
Beta to Alpha, and Alpha to Gamma & then continue the drive in CAR from Gama to
Alpha, Alpha to Beta, Beta to Gamma and then reverse from Gamma to Beta, Beta
to Alpha, and Alpha to Gamma, once inter sector handover are confirmed
then continue the drive for Coverage footprint of each sector by driving all roads
within the “Best Server Plot” of the site and additional only 1 road drive in each
sector connecting SCFT and Neighbor site beyond Best server plot is to be done
until a handover happens.

Press Auto call “Stop” after completion of device on both handset and Press
"Complete” under ‘select’.

Press “Auto DRM/DRX Upload” button which is popped up in both handset & wait
for respective uploads to finish only then move from the site.
New features added…..logging file size
Logging file size can be configured....

NOTE : The size must be set to


50MB (Mandatory), Latest XCAL
ver. will automatically start new
files after 50MB.

If you don’t set it right, there will


be re-test request as logs of
improper size will cause pre-
processing issues
New features added…..log Upload - Manual

After every test scenario whenever this is prompt to upload Logs upload it
Press “OK” for ‘Auto DRM/DRX upload’ prompt which is popped up & wait for
upload to finish.

This will automatically upload the logs after every test scenario.
Instead of pressing Ok if you choose to cancel or mistakenly press cancel then
you need to upload logs manually as explain next slide
New features added…..log Upload - Manual
Uploading of logs can be two ways : Manual

If you missed or choose to not to upload logs auto when


there was a prompt every time then upload manually
Press “Log Upload” button and it will show list of logs
pending to be uploaded
Select the logs to be uploaded based on date &timestamp
Upon uploading the logs the file names will disappear
from pending list

NOTE : Cycle is very important in order to distinguish logs


Unless mentioned by RF Optimizer or RF lead never change
cycle number. It should be always “1” for all the log files /
test scenarios for one round on any given day. Only when
you are requested to do second round another or other day
you will be asked to change cycle number to “2” by your
RF optimizer otherwise don’t change
New features added…..log Upload - Automatic
Uploading of logs can be two ways : Manual or Automatic.

NOTE : The size must be set to


50MB (Mandatory), Latest XCAL
ver. will automatically start new
files after 50MB.

If you don’t set it right, there will


be re-test request as logs of
improper size will cause pre-
processing issues
New features added..FTP server selection
Manual selection of FTP server possible..
New features added…..VOLTE dialed call
Manual selection of dialed number possible..
SCFT -S4 Mini - troubleshooting Guide
No Network service on Handset
1) No network service on S4-Mini handset

Observed Issue:

As shown in picture below though we are able to see our network parameters
being received by the S4-Mini handset, the handset is not registering to the LTE
network.
No Network service on Handset…
1) No network service on S4-Mini handset

Root Cause:

As shown in picture below the “Mobile data” or “Data roaming” settings was
unchecked under “Mobile networks” settings.
No VoLTE service status on S4-Mini handset
2) No VoLTE service status on S4-Mini handset

Observed Issue:

As shown in picture below, though we are able to see data services are active, no
VoLTE service is being observed. The internet & FTP session are running fine as
shown. When VoLTE call is made it shows “mobile network not available”.
No VoLTE service status on S4-Mini handset…
2) No VoLTE service status on S4-Mini handset

Root Cause:

As shown in picture below, problem was caused due to change in “PDN


preference settings”. Here “Enable Internet PDN” was unchecked. Please
restart the phone after checking the “Enable Internet PDN”.

Any change to the VoLTE configuration apart from above element, can cause
this type of problem.
XCAL-Mobile Software (Not XCAL-Auto Call) doesn’t start
3) XCAL-Mobile Software (Not XCAL-Auto Call) doesn’t start

Observed Issue:

XCAL-Mobile (Not XCAL-Auto Call) stops after showing message as “License


Error (UE time setting must be automatic)”
XCAL-Mobile Software (Not XCAL-Auto Call) doesn’t start…
3) XCAL-Mobile Software (Not XCAL-Auto Call) doesn’t start

Root Cause:

This was caused since the “Automatic date & time” was unchecked in “date & time”
settings.
FTP DTUL failed on Handset
4) FTP DTUL failed on Handset

Observed Issue:

FTP DTUL call failed on a particular handset.


FTP DTUL failed on Handset…
4) FTP DTUL failed on Handset

Root Cause:

As shown below, the FTP URL in which file is going to be uploaded, does not
change as per FMS server settings. This caused FTP traffic failure on the slave
handset.
This issue could be due to XCAL-Auto Mobile Version mismatch or old version
being used on slave handset as shown, since after upgrading the XCAL
version, the issue got resolved.
Not able to download scenario
5) Not able to download Stationary or Moving scenario.

Observed Issue:

Unable to download Stationary or Moving scenario


Root Cause:

check the FTP server connectivity in your phones, check the IP address, user id
and password and server path as shown below.
Important Notes
Sector Swap Verification

After Physical site parameter verification, condu


ct drive test in clock wise and anti-clock wise dir
ection to identify any sector swap
If found, take corrective action before going for
coverage drive test
If service-direction of PCID has changed, Data
Throughput degradation and Handover Fail can
be observed
Sector Swap / Call drop: During Stationary test ,
Engineer must verify correct PCI for every
sector, This can be done by checking the
Changed PCI per sector and matching it will DTR
or Cell Ref file provided to him by RF Lead.
During clockwise and anticlockwise moving test
if there is call drop &PCI is changed after call
drop then redo the clockwise/anticlockwise
loop if call drop occurs again. Don’t proceed
with SCFT & report to RF Lead
SCFT Parameter Requirements

Min Average Max


DL Throughput 2 Mbps 20 Mbps 40 Mbps
UL Throughput 256 Kbps -- 4 Mbps
RSRP -108 dBm -- --
SINR 20 dB -- --

Legend
Throughputs for Moving in Worst condition shouldn’t go below min. as per following table when
RSRP = -108dbm and SINR = 20db

Please note Throughput should be better when RSRP and SINR is better
* Above table is just for reference for worst condition only
Summary
eNB physical check involves checking azimuth (note free range), tilt, antenna
height, tower height

SCFT consists of stationary and moving tests

Stationary tests include ping, UL & DL throughput and VoLTE connectivity


check

Drive around the site clockwise & anti-clockwise for moving tests

Especially check for sector swap using PCI

Ensure RSRP, throughput and SINR ranges are met


Quiz
Average DL throughput should be at least ____

• 4 Mbps
• 20 Mbps
• 40 Mbps

Sector swap can be identified based on

• PCI
• RSRP
• VSWR

Moving test in SCFT does not include

• FTP
• VoLTE
• Either
Work Flow Management for SCFT
Introduction to Work Order Assignment Management
Work Order Assignment Management is also known as WAS.
WAS is going to help users in automating the Work Order(WO) flow in a
systematic manner using a portal called SITEFORGE.
Using this portal each level of Management employees will receive and
execute their WO or Task assigned to them.
Helps to trace the network status through online mode.
Provides Visual steps to guide users on progress and upcoming steps.
Improves productivity & complete visibility.
Helps users to monitor Parameter Compliance Index(Planned Vs. Actual).
Helps users to Search/Filter Sites & WO based on various parameters.
Network Lifecycle Management Flow for SCFT
(Work Allocation System)
Work Flow Management for SCFT
Start
Responsibility:
GIS/SIITE FORGE; RFI report submit Trigger from GIS & WO Issued to
Notification: Samsung Circle Head (CH)
Samsung CH

Reject
Samsung
Notification:
Notification:Samsu Samsung CH assigns the WO to respective Optimization Samsung AM,
ng AM, RJIL CTO Samsung Area Manager (AM) engineer. Samsung RF
Lead, Samsung
CH, RJIO CTO.
Notification:
Samsung CH, AM Splits WO into tasks & assigns SCFT task to
SOLPAR PM respective Solpar PM as per the area.
Accept/Reject(i
f SOLFE is
Notification : Samsung SOLPAR PM Assigns of SCFT

Reject
needed to be
Area Manager, Task to SOLPAR field eng involved Accept
Sasmsung RF lead, RJIL Notification:Sams
RF lead, SOLPAR FE RJIL CTO ung AM, Samsung
Validates RF Lead, Samsung
SOLPAR FE Does the SCFT test in accordance CH, RJIO CTO, RJIL
Notification: SCFT report
with SCFT Test Procedure and update the RF lead
Solpar PM,
Samsung RF Lead
siteforge server if any parameter updates are Accept
done for the site.
Task closure in SITEFORGE
Samsung
Optimization All tasks (ATP11A, ATP11B, SCFT &
Notification: team Validates Responsibility: RJIL
EMF) completed, WO closure
Samsung -CH the SCFT Circle CTO / GIS /
report(Accept/Rej System
ect) Notification RJIL
End Circle CTO, GIS
SCFT procedure on Site Forge (WAS)
CH - Login

Circle Head can login by entering his user name & password here
CH – Dashboard, Sites

CH has logged in & he


is able to view
dashboard which
overview of Site
details

Filters are available


here to extract
data
Site details are
available here
CH – Sites…

Click here to
know details of
that particular
site

Siite
summary,RAN,Inv
entory,Trasnport,P
htos,Regulatory &
Documents can
be viewed here
CH – Work Orders , Sign out

Option to Sign
Out
CH has to click here to Assign
or Re-assign WO to AM

CH has to click here to Assign


or Re-assign WO to AM

Select AM from drop down


AM – Login, Dashboard

AM can login by
entering username &
Password here

AM has
logged in
here
AM can view
dashboard here
AM – Sites

List of sites are


displayed here

Filters can be
accessed here

Reports can be
downloaded
here by AM
AM – Work Orders
List of Work Orders Filters can
are displayed here be
accessed
here
Click here
to assign
or re-
assign
Samsung
engineer

After
assigning
engineers
from drop
down
Click here
AM – Work Orders….
Click here to see the list
of tasks available
Click here to
assign the task
to SOLPAR PM

Assign task start/Finish


dates and select
SOLPAR PM from drop
down
SOLPAR PM- Sign In, Sites

SOLPAR PM logs in
by entering User
name & Password

SOLPAR PM has
Sites information logged in
can be accessed
here Filters for
accessing data
SOLPAR PM- Sites

By clicking on
particular site
SOLPM will be able
to see details of
that site
SOLPAR PM- Tasks

List of tasks are


displayed here
Click here to assign
the task to SOLPAR
FE(DT Engineer)

select responsible
SOLPAR FE(DT
engineer)from
dropdown
SOLPAR FE(DT Engineer) – Sign In , Sites

SOLPAR FE(DT
Engineer)logs in with his
user name & Password

SOLPAR FE (DT
engineer)has logged in
List of sites to be here
handled can be
viewed here
Filters are available Here
SOLPAR FE(DT Engineer) – Tasks

FE has to
click here to
complete
task
“Perform
SCFT”

Click here to
edit any
parameters
value if DT
has changed
during SCFT
SOLPAR FE(DT Engineer) – Tasks

After Editing
the
parameter
FE has to
save here
SOLPAR FE(DT Engineer) – Tasks…

Parameter
Changes can
be viewed by
clicking here
SOLPAR FE(DT Engineer) – Tasks , Sign out

By clicking
here FE will
be able to
see Reject
reason of
SCFT report

Option to sign out


Samsung Optimizer – Sign In , Sites

Samsung
Optimizer
logs in here

Samsung
Optimizer views
list of sites
Samsung Optimizer – Sites

When he
clicks on
particular
site he will
be able to
see Site
summary &
Etc.
Samsung Optimizer – Sites…
RAN details are
Inventory
displayed here
details are
displayed here

Transport Site photos are


details are displayed here
displayed here
Samsung Optimizer – Sites…
Regulatory
details are
displayed here

Site
documents are
displayed here

Site
documents can
be uploaded
here(if any)
Samsung Optimizer – Tasks
List of tasks to
be handled are
displayed here Task status
is displayed
here
Paramet
er
Click here to changes
know the info can
reason for be seen
rejection here
Samsung Optimizer – Sign Out

Samsung
Optimizer
can sign out
here
Accelerating the SCFT
Process change recommendation
The SCFT Process
1. PCI
2. ECGI
Cellref 3. Site Location (Lat/Long)
4. BSP
5. Coverage KPI
6. Polygon name

Report generation
FMS ActixOne SiteForge

KPI Calculation and


Data matching with Cellref Report
upload Data download

1. No report
SCFT Stationary & 2. Blank KPI
Drive Test Data 3. 18 KPI pass/fail
The broad causes for unsuccessful report

1. Actix/Site ForgeIssue
SiteForge 2. Missing mandatory files

Report
download
1. PCI mismatch
1. No report 2. Missing Lat/Long parameters in the uploaded file
2. Blank KPI
3. 18 KPI pass/fail
KPI failure and its causes

S. No. KPI Name Drive Type Type


1 Successful UE Attach ST KPI 1. Incorrect Test
2 Successful VoLTE Mobile-to-Mobile Call ST KPI 2. System Issue
3 Successful Handover from Alpha DTDL, DTUL KPI
1. Incorrect Drive
4 Successful Handover from Beta DTDL, DTUL KPI 2. Incorrect HO
5 Successful Handover from Gamma DTDL, DTUL KPI parameters
6 Coverage Objective Met ( > 80% ) DTDL, DTUL KPI 1. Azimuth mismatch
2. Sector swap
7 Sector Swap ( < 50% ) DTDL, DTUL KPI
3. Site Location mismatch
8 Cell Overshooting Observed ( < 10% ) DTDL, DTUL Info 4. Lesser samples
9 Undesired Side Lobes ( < 30% ) DTDL, DTUL Info
Average / Peak MAC Throughput DL 1. Backhaul
10 DTDL Info
(kbps) 2. FTP Server issues
Average / Peak MAC Throughput UL 3. External Interference
11 DTUL Info
(kbps)
12 Average VoLTE Jitter (ms) ST Info
ActixOne Issues

1. Insufficient Disk Space (in DriveTest Landing Zone)


Process: Bi-Weekly confirmation of sufficient disk space by Actix SPOC.
Upto one month back successful SCFT files/logs to be archived. Samsung to recommend.

2. Blank ST KPI in case of missing Lat/Long


Process: Actix should not consider Lat/Long for ST KPIs.
Reprocessing
corrects the error
3. File Loaded into Actix, Processing issues

PN Capacity / File Server Capacity issue.

Processing during Cellref update in Server.

Processing issue/File Server Capacity issue.

DT done with unlocked GPS (Solpar).


Others:
(Loading, Scanned, Post-Processing, Achieve & File data deleted,
database load failed, Very distance serving cell etc. )
KPI Failure rate during SCFT
SCFT KPI Fail Reason KPI Fail %
VoLTE/Attach Success (6) Stationary Test Fail 20.9%
Handover Fail (No Attempt, HO
Handover (6) 19.0%
Fail)
Azimuth Mismatching 13.5%
BSP Mismatching 6.6%
Coverage Object Met (3)
Coverage Objective Fail. 16.7%
Missing Route 20.4%
Sector Swap (3) Crossed Feeder or CPRI cable 2.9%
Total 100%

VoLTE/Attach Success Stationary Test Fail

2.9%
Handover Handover Fail (No Attempt)
20.4% 20.9%
Coverage Object Met Azimuth Mismatching
16.7%
19.0%
13.5% Coverage Object Met BSP Mismatching

Coverage Object Met Coverage Objective


Fail.
6.6%
Coverage Object Met Missing Route

Sector Swap Crossed Feeder or CPRI cable


Some basic changes
1. SCFT together with the 11B, upload later (after 11B), this ensures
1. The eNB is working fine that day
2. No shut down, throughput, VoLTE or alarm issue

2. Local FTP server to be used

3. Mumbai FTP server daily monitoring & cleansing


Cellref reconciliation process (PA1)
1. PCI mismatch
2. Site Location mismatch
3. ECGI mismatch

PA1 (Cellref reconciliation)

At the time of Integration (Commissioning)


1. The LSMR Engineer fetches the dump of above parameter and forwards the logs to cellref te
2. The Cellref team corrects the data in case of mismatch
Azimuth reconciliation process (PA2)
1. ATP 11A Data is considered final, Cellref & BSP to be aligned to 11A (already in progress)
2. Sites have different Azimuth in actual
3. The sector drive test does not match with cellref BSP

PA2 (Azimuth Correction at Site) –


PA2-1: Where Integration is done (To be verified & corrected by SCFT Team)
PA2-2: Where 11A is done, but Integration is pending (To verified & corrected by Integration
Team)
PA2-3: Where 11A is not done, QC2 is pending (To verified during QC2 & get corrected before
11A)
PA2-4:
PA2-1: Where
Where change of Antenna
Integration is done parameters not&possible
(To be verified site,bychange
corrected cellref with RJIL in loop.
SCFT Team)
At the time of SCFT, the SOLPAR team will be given a print of cellref data, containing the followin
1. Azimuths
2. PCI
3. Site Lat/Long

The SCFT SOLPAR Team to


1. Check the actual Azimuth, and adjust antenna to match cellref, if required.
2. Check the PCI & Site Lat/Long.
3. Record the above data and Carry out the SCFT Test.
4. SOLPAR to be penalized if Azimuth not corrected before SCFT test.
Hand Over test process (PA3)
1. The HO failure is high

PA3 (HO testing process)

The SCFT SOLPAR Team to


1. Make at least two rounds in each direction (clockwise & anti clockwise).

Modification in SCFT test automation tool


1. A separate test scenario on X-CAL
Ensure sufficient Coverage Samples (PA4)
1. The coverage samples and drive routes should be ensured.

PA4 (Drive Route process)

The Drive Route Should be decided on Google Map within BSP boundaries
1. The BSP to be provided to circle RF Leads
2. It should be possible to super-impose the BSP boundaries over Google map
3. The SOLPAR co-ordinator to take print of Google map with BSP boundaries,
indicate the route on the map and provide to drive test team.
4. Drive test team to follow the map, sign-off & submit.
File upload process (PA5)
1. There is a large NO/PARTIAL REPORT issue due to incomplete upload of files.

PA5 (File Upload Process)

1. The FMS should generate an SMS for the completion of all files
2. The X-CAL should have RED/GREEN indication for upload of mandatory files
Sector Swap Confirmation process (PA6)
1. There are sites where the CPRI cable is swapped with other sector RRH.

PA6 (Sector Swap Confirmation Process)

1. The CPRI swap test will be performed during 11B.


Throughput Confirmation process (PA7)
1. There are sites the throughput observed during SCFT test is too low.

PA7 (Throughput confirmation)

1. Since the KPI is for info only, RJIL should not hold the SCFT.
2. The SOLPAR team should contact circle RF lead if the throughput is lower than
xxMbps, and should not proceed with the SCFT drive.
Stationary Test process (PA8)
1. The Attach & VoLTE KPI failure is high.

PA8 (Stationary Test)

1. There will be two attempts for Attach testing in the X-CAL itself, rather than one.
2. QC1 radio bearer should be mandatory for VoLTE call.
3. If the VoLTE is not successful, the SOLPAR should contact circle RF lead, and
should proceed for Drive Tests.
Summary of processes

Process Description Process Champion

PA0 Actix Processes Naveen/Madhuraj


PA1 Cellref reconciliation DS Han
PA2 Azimuth Correction at Site WJ Lee
PA3 HO testing process WJ Lee
PA4 Drive Route process WJ Lee
PA5 File Upload Process Madhuraj/Gouri
PA6 Sector Swap Confirmation Process WJ Lee, Naveen
PA7 Throughput Confirmation WJ Lee
PA8 Stationary Test WJ Lee
Summary of processes

Process Description Process Champion

PA0 Actix Processes Naveen/Madhuraj


PA1 Cellref reconciliation DS Han
PA2 Azimuth Correction at Site WJ Lee
PA3 HO testing process WJ Lee
PA4 Drive Route process WJ Lee
PA5 File Upload Process Madhuraj/Gouri
PA6 Sector Swap Confirmation Process WJ Lee, Naveen
PA7 Throughput Confirmation WJ Lee
PA8 Stationary Test WJ Lee
SCFT Process
[ Automation System ] [ SAMSUNG ] [ Circle RF Lead] [ SOLPAR ]

Make Cellref Provide updated Cellref file & BSP to RF lead every week
File & BSP
Make SCFT
DTR
Provide SCFT DTR (Map & Ant. Info) to SOLPAR team
No
Report Provide Fail Reason
SiteForge Order Rework (Physical para., Station, Handover, Drive Test)
Verify

Yes
SCFT Site
Survey
ActixOne Report Submit

Yes Ant.Para
PA2
Mismatch

FMS
Change Ant. Para No

Stationary Test PA6,


8

Handover Test PA3

SCFT Drive Test PA4,


7

Log file Upload


PA2 Azimuth Correction at Site
NOPT Samsung (Circle RF Team) SOLPAR
Cellref Eng. RF Lead Rigger

Make Cellref file & BSP


(Ant. Para matching with
ATP11A

Provide updated Cellref file & BSP to RF lead every week

Make DTR with


Cellref file & BSP

Provide SCFT DTR (Map & Ant. Info) to SOLPAR team

Check Ant. Para


with DTR on site
If mismatch,
Change Ant. Para
according to value
of Cellref
Submit SCFT Site Survey Check List to Samsung RF lead

Submit SCFT Site Survey Check List to NOPT engineer


PA3 Handover Testing Process
NOPT Samsung (Circle RF Team) SOLPAR
Cellref Eng. LSMR RF Lead Rigger

Check Inter - Do Handover test before SCFT Drive test.


Sector - First take a clockwise drive. Start from Alpha to
Neighbor List Beta, Beta to Gamma, Gamma back to Alpha.
- Then take a anticlockwise drive. Start from Alpha to
Gamma, Gamma to Beta, Beta back to Alpha.
Check Neighbor List • Clockwise : Alpha -> Beta -> Gamma-> Alpha
• Anti-Clockwise : Alpha -> Gamma -> Beta -> Alpha

If missing neighbor, Add - Observe the target PCI change without Call Drop.
※ If the PCI is changed after call drop, then try to HO
neighbor in each sector
again.
- If call drop happened again and again, then DO NOT
EXECUTE SCFT and feedback to Samsung RF Lead
Confirm Neighbor List
immediately.

Confirm Neighbor List

Handover Test
PA4 Drive Route Process
NOPT Samsung (Circle RF Team) SOLPAR
Cellref Eng. RF Lead Rigger

Make Cellref file & BSP


(Ant. Para matching with
ATP11A

Provide updated Cellref file & BSP to RF lead every week


- Tracking and compare the Driven Route with provided
SCFT DTR during SCFT Drive Test.
※ If any DT Route is non motorable, then take photo and
Make DTR with provide it to Samsung RF Lead with comment.
Cellref file & BSP - Drive all the roads as per SCFT DTR provided.
- Drive all the roads in main lobe of serving sector.

Provide SCFT DTR (Map & Ant. Info) to SOLPAR team

Drive Test
according to DTR

Submit missing road with photo or comment to RF


lead
Submit missing road with photo or comment to NOPT
engineer
PA6 Sector Swap Confirmation Process
NOPT Samsung (Circle RF Team) SOLPAR
Cellref Eng. RF Lead Rigger

Make Cellref file & BSP


(Ant. Para matching with
ATP11A

- Go to stationary point in main lobe of antenna and check


Provide updated Cellref file & BSP to RF lead every week
PCI.
- Compare the detected PCI with provided PCI (SCFT DTR)
- For swap between sectors, change the CPRI cable of
Make DTR with swapped sectors.
- Check PCIs before start the SCFT for all three sectors again
Cellref file & BSP
and if OK then proceed for SCFT Drive Test.

Provide SCFT DTR (Map & Ant. Info) to SOLPAR team

We need to consider checking sector swap, Stationary Test


during ATP11B also. If sector swapped,
Change CPRI cable of
swapped secoters

Report CPRI cable changing status on Site Survey Check


List
Submit SCFT Site Survey Check List to NOPT engineer
PA7 Throughput Confirmation
NOPT Samsung (Circle RF Team) SOLPAR
Cellref Eng. LSMR RF Lead Rigger

Check Backhaul &


Alarm Status

Check eNB Health Status


- DL/UL Throughput by Speedtest.net (App.) before test
- During drive test if low throughput value is observed,
then stop DT and restart the test.
Check Backhaul & Alarm - During DT observe the DL/UL throughput changes all the
time.
Status. If any issue, Report
- If the low DL or UL T-put is observed during SCFT even
related team though signal condition is good and PCI value is correct
then stop the SCFT and make the call again. If issue still
Confirm eNB Health Status persist, contact LMSR engineer.

Provide eNB Health Status

Drive Test

Check eNB Health Status

Confirm eNB Health Status


PA8 Stationary Test
NOPT Samsung (Circle RF Team) SOLPAR
Cellref Eng. RF Lead Rigger

Make Cellref file & BSP


(Ant. Para matching with
ATP11A

- Go to stationary point in main lobe of antenna and check


Provide updated Cellref file & BSP to RF lead every week
PCI.
(Have to check only one PCI assigned to test sector.)
※ Many field team move from sector to sector for stationary
Make DTR with Cellref file & BSP test, but the PCI change don’t happen and they do not
Every morning, before field team start notice it.
test, get confirmation from RJIL circle - Compare the detected PCI with provided PCI (SCFT DTR).
team that VoLTE is working or not. - Perform the VoLTE call test.
- If VoLTE call fail, report to Samsung RF lead with symptom
Provide SCFT DTR (Map & Ant. Info) to SOLPAR team

& VoLTE Call Health Stauts

Stationary Test
(UE Attach/VoLTE call
setup)

If VoLTE call fail, report to RF Lead with


symptom

Raise the issue to Samsung EPC


team(DP) in that circle --> RJIL
manager in that circle --> IMS team
Summary
Work Order Assignment Management is also called as WAS.
AM receives SCFT trigger once ATP11B process is completed.
AM assigns SCFT Task to Samsung Optimizer & Samsung RF Head.
AM distributes(assigns) “Perform SCFT” Task to SOLPAR PM.
SOLPAR PM will further assign “Perform SCFT” task to SOLPAR FE(DT
Engineer).
SOLPAR FE has to accept this task from SOLPAR PM and follow below steps.
a)SOLPAR FE will conduct SCFT task using Mobile device(eg:S4 Mini) to
complete and upload test data to FMS server(separate process)
b)SOLPAR FE will input parameter changes(if any) to siteforge server and
submits it for Samsung Optimizer approval.
Samsung Optimizer will accept or reject according SCFT test data available in
FMS server and flow continues.
Overall WAS Improves productivity & complete visibility.
QUIZ
Question 1:
Who will assign SCFT Task to Samsung RF head ?
Ans:
Samsung Area Manager

Question 2:
Who will assign “perform SCFT” task to DT Engineer?
Answer:
PM(SOLPAR)

Question 3:
Whether Samsung RF head can reject approved SCFT data by Samsung Optimizer?
Answer:
A) Yes
B) No
Thank You

Das könnte Ihnen auch gefallen