So) 3e 3ould li5e to than5 ou "or our encoura#ement and su!!ort 3hich ins!ired us to 3or5 enthusiasticall. It 3ould 'e our !leasure to clari" an discre!anc that ma arise or anclari"ication that ou ma re9uire re#ardin# our !ro4ect 3or5.e are reall #lad that 3e #ot the o!!ortunit to ha0e such 3onder"ul and educati0e e!eriences.Than5 ou
So) 3e 3ould li5e to than5 ou "or our encoura#ement and su!!ort 3hich ins!ired us to 3or5 enthusiasticall. It 3ould 'e our !leasure to clari" an discre!anc that ma arise or anclari"ication that ou ma re9uire re#ardin# our !ro4ect 3or5.e are reall #lad that 3e #ot the o!!ortunit to ha0e such 3onder"ul and educati0e e!eriences.Than5 ou
So) 3e 3ould li5e to than5 ou "or our encoura#ement and su!!ort 3hich ins!ired us to 3or5 enthusiasticall. It 3ould 'e our !leasure to clari" an discre!anc that ma arise or anclari"ication that ou ma re9uire re#ardin# our !ro4ect 3or5.e are reall #lad that 3e #ot the o!!ortunit to ha0e such 3onder"ul and educati0e e!eriences.Than5 ou
SQR and Pump Station Control building General Construction
Equalization basin
Mobilization Set precast station Fill Concrete
Backfill Excavate & pour
Equipment Setup Set Equipment footings Set pumps & vault Masonry to floor level Walkways Piping Piping Excavate and backfill Pipe & electric under Electrical slab Electrical Entrance Form and pour slab Roads
Strip topsioil Masonry & openings Fence
Excavate and fill Finish grade and seed
Roof farming Form and pour slab Startup & test Plumbing Project substantial Form and pour walls HVAC &electrical completion Engineer & control Form and pour walks Finishes Strip topsoil Backfill Fill site SCR and equalization Electrical basin Excavate and fill Paint and finishes