Beruflich Dokumente
Kultur Dokumente
824
COSTO DE INSTALACION
ITEM MATERIALES UND. CANT. S/ UNIT. S/ PARCIAL
6.00 MANO DE OBRA (8 KG*HR) HR 36.00 14.50 522.00
7.00 EQUIPO (MO*0.25) HR 9.00 14.50 130.50
8.00 equipos manuales dia 8.00 14.50 116.00
768.50
12% GG 92.22
8% UT 61.48
TOTAL MANO DE OBRA Y EQUIPO 922.20
S/ INST:
S/KG:
S/ML
S/ TOTAL:
S//KG:
S/ML
TOTAL 4067.00
05/12/2007
S/ TOTAL
238.68
28.08
33.70
11.40
11.40
60.06
28.83
72.00
15.00
96.00
12.00
24.00
24.00
655.14
655.14
S/ TOTAL
922.20
1600.00
3177.34
#¡REF!
1.60
3177.34
#¡REF!
1.60
S/ M2
2.05