Beruflich Dokumente
Kultur Dokumente
CROSS-SECTION OF 1
0
0.50
0.5
0.50
1.00 0.50
0.60
1.50
7 LENGTH = 1.30m
VOLUME = (0.50m)(0.60m)(1.30m)
2.10
2.00
VOLUME = 0.39 cu.m.
5.0
0
LENGTH = 2.90m
NGL VOLUME = (0.50m)(1.50m)(2.90m)
VOLUME = 2.18 cu.m.
1.00
LENGTH = 4.00m
VOLUME = (0.50m)(2.10m)(4.00m)
LENGTH = 7.10m VOLUME = 4.20cu.m.
VOLUME = (1m)(3m)(7.10m) CROSS-SECTION OF 7
VOLUME = 21.30 cu.m. 0.50
3.70
CROSS-SECTION OF 6
2.10
0.50 CROSS-SECTION OF 5
50 0.60
NGL
0.
0.80
2.30
0.70
LENGTH = 5.00m
NGL
VOLUME = (0.50m + 0.70m) (2.90m)(5.00m)
2
1.00
VOLUME = 8.70 cu.m.
5.30
1 LENGTH = 3.70m
0.70
0.50
2 2.90
LENGTH = 2.90m
VOLUME = (0.60m + 1.20m) (5.30m)(5.30)
0.50
2
5 VOLUME = 25.28 cu.m.
0.50
5.30
0.80 0.70
LEAN CONCRETE ( 50mm thick) NATIONAL
HIGHWAY
EMBANKMENT 100mm diam. weep holes @ every 1m O.C.
1.85
2.85
NATIONAL
HIGHWAY
EMBANKMENT
2.20
1.81
0.90
1.70
Km 388+497 - 388+506.85
Km 388+495 - 388+497
VOLUME OF STONE MASONRY = (0.70m + 0.90m) (2.85m)(9.85m) + (0.70 X 1.85 X 9.85)
VOLUME OF STONE MASONRY = (0.70m + 0.90m) (2.20m)(2.00m) + (0.80 X 1.81 X 2.00) 2
2
VOLUME OF STONE MASONRY = 22.458 + 12.756
VOLUME OF STONE MASONRY = 3.52 + 2.90 VOLUME OF STONE MASONRY = 35.21 cu.m.
VOLUME OF STONE MASONRY = 6.42 u.m.
NATIONAL
HIGHWAY
0.35
EMBANKMENT
1.60
100mm diam. weep holes @ every 2m O.C.
0.95
0.25
0.60
0.73
0.70
Km 388+509.35 - 388+512.35
VOLUME OF STONE MASONRY = ((0.33 X 0.40) + ( 0.35 X 0.73))(3) 0.80
VOLUME OF STONE MASONRY = (0.132 + 0.256)(3) 0.50
VOLUME OF STONE MASONRY = 1.16 cu.m.
Km 388+514.30 - 388+525.10
VOLUME OF STONE MASONRY = ((0.80 X 1.85) + ( 0.50 X 1.30))(10.80)
TOTAL VOLUME OF STONE MASONRY = 147.81 cu.m. VOLUME OF STONE MASONRY = (2.65 + 0.65)(10.80)
VOLUME OF STONE MASONRY = 35.64 cu.m.
2.20
STONE MASONRY @ OUTFALL 4.30 5.50
9.85 3.00 10.80
Km 388+497 Km 388+506.85
Km 388+514.30 Km 388+525.10 CANAL W/ COVER Km 388+664.40
Km 388+509.35
Km 388+534.80 Km 388+561.80 Km 388+572.20
Km 388+512.35
CANAL OUTFALL OPEN CANAL CANAL W/ COVER OPEN CANAL CANAL W/ COVER OPEN CANAL CANAL W/ COVER CANAL W/ COVER OPEN CANAL WAITINGSHED OPEN CANAL CANAL W/ COVER OPEN CANAL
Km 388+495 Km 388+514.30 Km 388+520.90 Km 388+532.10 Km 388+559 Km 388+569.30 Km 388+602.80 Km 388+632.10 Km 388+637.60 Km 388+661.80
ROAD SHOULDER ROAD SHOULDER ROAD SHOULDER ROAD SHOULDER
BRIDGE
TO NARVACAN NATIONAL ROAD TO PIDIGAN
10mm diameter
VERTICAL BARS
spaced @ 0.30m O.C
10mm diameter 10mm diameter
0.95
HORIZONTAL BARS LONGITUDINAL BARS
as shown spaced @ 0.30m o.c.
0.15
0.15
1.10 1.10
VOLUME OF CONCRETE CANAL = ((0.15 X 0.95 X 2) + ( 0.80 X 0.15)) X (166.80) + ((0.15 X 0.95 X 2) + (0.15 X 1.80)) X (2.60)
VOLUME OF CONCRETE CANAL = ((0.285 + 0.12 X (166.80)) + ((0.285+1.95) X (2.60))
VOLUME OF CONCRETE CANAL = 67.55+ 5.81
VOLUME OF CONCRETE CANAL = 73.36 cu.m.