Preparation
p of DPR for improvement
p and up
up-
p-
gradation of in principle declared National
Highways in the state of Uttar Pradesh
Pradesh..
Section :: Bewar – Fatehgarh – Miranpur Katra – Bisalpur ‐ Pilibhit

Length = 191 km
30.05.2017

M/s Chaitanya Projects Consultancy Pvt. Ltd.


in Association with
M/s Agnitio Infrastructure Projects Pvt. Ltd.
1

Location Map

Project Road

1
5/29/2017

PROJECT ROAD

 Project road starts from T-Junction with NH- 92


near Bus stand at Bewar (Distt. – Mainpuri),
 Passes through Madanpur, Mohammdabad,
Farrukhabad, Jalalabad, Miranpur Katra,
Khudaganj, Bisalpur,
 Ends at Pilibhit (Junction with NH -730) .
pp
 The approximate length
g of p
project
j road is 179
km(Actual length will be checked after
toposurvey)
 Between section Khudaganj and Barsia, the
Project road is non bituminous (Earthen) in
approx. 4km length, rest is bituminous. 3

Key Map

2
5/29/2017

DISTANCE CHART
BEWAR : KM 0 Sl. No. Built-up
Located at
Distance
km
1 Bewar 0.0
MADANPUR : KM 7.0 2 Madanpur 7.0 7.0
3 Khimsepur 11.0 4.0
Mohammadaba
4 17 0
17.0 60
6.0
d
KHIMSEPUR : KM 11.0
5 Farrukhabad 40.0 23.0
6 Allahganj 60.0 20.0
7 Jalalabad 80.0 20.0
MOHAMMADABAD : KM 17.0 8 Madnapur 96.0 16.0
9 Miranpur Katra 113.0 17.0
10 Khudaganj 128.0 15.0
ALLAHGANJ : KM 60.0 11 Bisalpur 144.0 16.0
FARRUKHABAD : KM 40.0 12 Barkhera 161.0 17.0
13 Kalyanpur 166.0 5.0
JALALABAD : KM 80.0 14 Pilibhit 179.0 13.0

MADNAPUR : KM 96.0
M.P. KATRA : KM 113.0

KHUDAGANJ : KM 128.0
BISALPUR : KM 144.0

BARKHERA : KM 161.0 KALYANPUR : KM


166.0 5
PILIBHIT : KM 191.0

SCHEMATIC PLAN OF PROJECT ROAD

3
5/29/2017

DISTRICTS FALLING ON PROJECT ROAD / SITE OFFICE

MAINPURI
FARRUKHABAD
SHAHJAHANPUR
PILIBHIT

Address off Sit


Add Site office
ffi
House No. 179,
Kaji Tola, GT Road,
Bewar, Mainpuri -205301
7

ALIGNMENT

Alignment on Google

4
5/29/2017

SALIENT FEATURES OF PROJECT


Details of
Sl. No. Items Unit Remarks
Sections
Bewar -
1 Project Name Farrukhabad -
Katra - Pilibhit
As per reconnaissance
2 Project Length Km 179
survey
3 Built-up Length %age 31% 56 km
4 Open area length %age 69%
5 Type of Pavement Flexible
6 Carriageway width m 3.5 - 7 Max. length is two lane
7 Shoulders on either side m 0.5 - 2.0
8 M j Bridges
Major B id N
Nos 3
9 Minor Bridges Nos 16
10 Culverts Nos 205
11 Major Junctions Nos 10
12 Minor Junctions Nos 188
13 School Nos 12
14 Bus Stops Nos 16
15 Temples Nos 26
9

Structure Details
Avg.
Sl. Type of
Nos Carriageway Condition Proposal Remarks
No. Structure
Width (m)
included
Major Bridge New Ganga river
1 2 7
(RCC) construction bridge of 640m
span length
Major Bridge New
2 1 4 -
(Pontoon) construction
New
3 Minor Bridge 16 7
construction
Delhi - Kanpur
4 RoB 1 7 Fair Retain
Track
Rail Level New Delhi -
5 1 -
Crossing construction Lucknow Track
New
6 Culverts 205 construction
(Maximum)
7 VuP/PuP -

10

5
5/29/2017

Structure Details

 Existing Bus Stop – 16 nos,

 Temple – 26 nos,

 Truck lay byes – NiL,

 School – 12 nos

11

TRAFFIC
Sl. Homogenous Chainage
Location Remarks to Capture
No. Section (Km)
Section I :: Km 0 Traffic coming from Kanpur, Jaipur,
Near
to Km 40. 00 Mainpuri, Etawah & moving towards
1 Near Km 20.0 Mohammdab
(Bewar – Farrukhabad Shahjahanpur,
Farrukhabad, Shahjahanpur Bareilly
ad
Farrukhabad) etc (both ways)

Section II :: Km
Near Km 50.0, Between in the Traffic moving among Farrukhabad,
40.0 to Km 113.0
2 Near km 75.0, homogenous Kanpur, Badaun, Hardoi,
(Farrukhabad –
Near km 105.0 section II Shahjahanpur, Bareilly, Haridwar etc
MP Katra)

Section III :: Km
113.0 to Km 144.0 this section is not connected
3 Near km 125.0
(MP Katra – completely by road
Bisalpur)
Section IV :: Km Between in the
Near km 160, Traffic moving among Shahjahanpur,
4 144.0 to Km 179.0 homogenous
Near km 175.0 Bareilly, Pilibhit, Puranpur etc
(Bisalpur – Pilibhit) section IV

12

6
5/29/2017

DRAFT DESIGN STANDARDS


Reference
Item Plain / Rolling Terrain

Design Speed Ruling -100 Kmph Table 2.1


(kmph) Min.- 80 kmph
Sight distance Table 2.6
180 m
(minimum)
Proposed Land width Open areas - 24m
(ROW) Built-up areas - 18 m
Lane configuration 2-lane with/without paved shoulders
i) 7.0 m of carriageway + 1.5 m Paver shoulder +
2.0m earthen shoulder (Fig. 2.2) of two lane
manual,
Formation width
ii) 7.0 m of carriageway + 2.5 m earthen
shoulder (Fig. 2.3) of two lane manual

0.25m Raised median


Edge strip
0.5m Depressed Median

13

DRAFT DESIGN STANDARDS


Reference
Item Plain / Rolling Terrain

Table 2.7
Camber/cross fall 2.5 % for carriageway

2.5 % for paved shoulder and 3.0 % for earthen Clause 2.8.2
Shoulders
shoulder
1 (V): 2 (H) Fill (Fill height upto 3.0 m)
Side Slope 1 (V): 1.5 (H) Fill (Fill height 3 m to 6.0 m)
1 (V): 1 (H) Cut
Maximum super-
7.0 %
elevation
Radii of horizontal Ruling Min – 400 m Table 2.5
25
curves (m) Absolute Min – 250 m
“Trapezoidal / V “shape on - either side where
Drains
warranted depending on Site Condition.

14

7
5/29/2017

TYPICAL CROSS SECTIONS

15

TYPICAL CROSS SECTIONS

16

8
5/29/2017

TYPICAL CROSS SECTIONS

17

TYPICAL CROSS SECTIONS

18

9
5/29/2017

PROPOSED BYPASSES
Recommended Length in km Length of
Village name
Sl. No. Existing
to be bypass Option I Option II Option III Habitation (m)
1 Madanpur 0 920
0.920 1 430
1.430 1 140
1.140 650
2 Khimsepur 1.470 1.530 1.740 600
Mohammada
3.100 2.950 1.100
3 bad 750
4 Allahganj 3.000 2.440 4.280 1100
5 Jalalabad 4.870 5.100 4.000 1900
6 Madnapur 1.360 1.710 2.000 700
Miranpur
2.680 3.600 3.360
7 Katra 3000
8 Khudaganj 4.910 3.820 4.950 1200
9 Bisalpur 3.190 4.200 6.730 2300
10 Barkhera 2.100 1.470 2.500 1200
11 Kalyanpur 1.100 0.910 1.220 600 19

1- MADANPUR

20

10
5/29/2017

2- KHIMSEPUR

21

3- MOHAMMADABAD

22

11
5/29/2017

4- ALLAHGANJ

23

5 - JALALABAD

24

12
5/29/2017

6 - MADNAPUR

25

7 – MIRANPUR KATRA

26

13
5/29/2017

8 - KHUDAGANJ

27

9 -BISALPUR

28

14
5/29/2017

10 - BARKHERA

29

11 - KALYANPUR

30

15
5/29/2017

STATUS OF WORK
S.No Description of work Status
1 Reconnaissance Survey Completed
2 Submission of Inception Report Submitted on 12thh April 2017
3 Topographical Survey In progress
Pillar fixing 120 Km completed
DGPS Points 60 Km completed
4 Other Field inventories (i.e. Road , 70 Km completed
Pavement,
P C l
Culvert & B id
Bridge
Inventory)
5 Identification of villages along the In Progress
alignment & Collection of village (Identification & Collection of
maps Maps in Pillibhit & Mainpuri
districts completed)
31

PHOTOS OF FIELD ACTIVITIES

Casting  & Fixing of Pillars
32

16
5/29/2017

PHOTOS OF FIELD ACTIVITIES

Bridge at Km 3+400

33

SITE PHOTOS

34

17
5/29/2017

SITE PHOTOS

35

SITE PHOTOS

36

18
5/29/2017

SITE PHOTOS

37

SITE PHOTOS

38

19
5/29/2017

SITE PHOTOS

39

SITE PHOTOS

40

20
5/29/2017

SITE PHOTOS

41

SITE PHOTOS

42

21
5/29/2017

SITE PHOTOS

43

SITE PHOTOS

44

22
5/29/2017

SITE PHOTOS

45

SITE PHOTOS

46

23
5/29/2017

SITE PHOTOS

47

SITE PHOTOS

48

24
5/29/2017

SITE PHOTOS

49

SITE PHOTOS

50

25
5/29/2017

SITE PHOTOS

51

SITE PHOTOS

52

26
5/29/2017

KEY PROFESSIONAL STAFF

S.
Position Name
No.

Team Leaderd cum Senior


S i Highway
i h Sh. Mahesh Pal Singh
1
Engineer
Senior Bridge Engineer Sh. Rajib Sarkar
2

Highway cum Pavement Engineer Sh. Dharmendra Kumar


3

Material-cum-Geotechnical Sh. Manoj kumar singh


4
Engineer
i - Geologist
G l it
5 Senior Survey Engineer Sh. Sameer Goswami
6 Traffic and Safety Expert Sh. Salil Pathak
7 Environmental Specialist Sh. Sharad Verma
Quantity Surveyor/ Documentation Sh. Rajesh Tiwari
8
Expert
53