008-891-793
ATTENTION:
A. Supply of materials & labor for provision of shoe racks. 1 Lot 5,200.00
B. Supply of materials & labor for provision of doors, door knob and 1 Lot 10,400.00
deadlock.
C. Supply & installation of mosquito screen. (aluminium, with chicken 17 pc. 24,000.00
wire & wood frame)
D. Supply of materials & labor for provision of cabinet (2 sets w/ 4 1 Lot 6,200.00
shelves each).
E. Supply of materials & labor for provision of steel fire exit door. 2 sets 46,000.00
F. Supply of materials & labor for granite countertop lavatory and 1 Lot 13,000.00
dismantling of old lavatory.
H. Dismantling of 2 partition walls and provision of new partition wall 1 Lot 50,000.00
with 12mm tempered glass & relocation of electrical devices.
I. Supply & installation of shelves at the second level stockroom area 1 Lot 11,200.00
(paint finished)
L. Provision of 10mm tempered glass at the second floor(2 doors). 1 Lot 15,000.00
M. Supply & installation of soft baseboard on walls at the living room 1 Lot 50,000.00
area. (indoor playground, w/ safety rubber mats)
N. Labor for repainting. (indoor only), including shelves & cabinets. 1 Lot 48,000.00
O. Supply & installation of new toilet bowl for toddler including water 3 pc. 22,000.00
supply.
P. Dropping of the half of old kitchen sink & installation of new stainless 1 Lot 14,000.00
sink, and repair of cabinet & water supply.
TOTAL 387,000.00
Less 15 % 65,016.00
discount
TERMS:
This is our best estimate to complete the above stated works. If additional parts and labor are required, we will inform
you prior to proceeding with the work. To schedule a time for us to complete the work, or should you have any question,
please feel free to contact us through phone number 09274343911 or send an email in this address: ,
lexiar.handymanbuilders@gmail.com
Prepared by:
Mr. Alex M. Sabanal
Manager/Contractor Conformed: _________________________________
VIRLANIE FOUNDATION