Sie sind auf Seite 1von 15

K.

OFFEI PLUMBING WORKS


GA WEST AMASAMAN ACCRA NSAWAM ROAD, ACCRA
0244820252/0277868181
First Phase : CHISEL AND RUNNING - Musuku, Greater Accra
Enterprise Material 9th August 2014
No Details Quantity Unit price Total

1. 4” PVC Pipe 10 20 200

2. 2” PVC Pipe 7 25 175

3. 1 ¼ ” PVC Pipe 4 24 96

4. ¾ ” PVC Pipe 24 13 312

5. ½ ” PVC Pipe 3 10 30

6. 1 ” PVC Pipe 8 17 136

7. 4” Elbow 12 6 72

8. 2” Elbow 12 5 60

9. ½ Elbow 30 1.5 45

10. 1 ¼ ” Elbow 20 4 80

11. ¾ Elbow 50 1.5 75

12. 2” 45 Elbow 6 5 30

13. 1 ” Elbow 20 2 40

14. 4” 45 Elbow 6 7 42

15. ¾ Tee 40 1 40

16. 3× ½ Tee 40 2 80

17. 2” Tee 6 5 30

18. 1” Tee 15 3 45

19. 1 ¼ ” Tee 2 5 10

20. 4” Swept Tee 3 15 45

21. ½” Copper pipe 18 90 1620

22. ½” K 28 30 5 150

23. ½” K 26 40 5 200
24. ½” K 12 25 8 200

25. ½” K 1 20 5 100

26. 3× ½ Reducer 30 1.5 45

27. 2× ¼ Reducer 6 4 24

28. ½” Rubber Plug 30 2 60

29. Thread Tape 10 packets 2 200

30. S 100 Glue 6 14 84

31. ½” Original Chromium Stop Cock ATA 8 70 560

32. ¾ ” Chromium Stop Cock ATA 8 80 640

33. ¾ Stop Cock K55 2 24 48

34. ½” 3/8 Adopter 30 1.5 45

35. ½” Valve Socket 18 1 18

36. ¾ Valve Socket 18 1.5 27

37. 2” Vent Cup 2 5 10

38. 4” End Cup 10 7 70

39. 1 ¼ End Cup 6 6 36

40. 1 End Cup 1 2 2

41. 2 End Cup 10 5 50

42. GHACEM 4 35 140

Total GH¢ 5,972.00

Material Cost GH¢5,972


T&T GH¢ 100
Workmanship GH¢2,700
Grand Total GH¢8,772

Submitted by
………………….
(General Manager)
K. Offei
K. OFFEI PLUMBING WORKS
GA WEST ACCRA NSAWAM ROAD, ACCRA
0244820252/0277868181
First Phase : CHISEL AND RUNNING - Madina Japan Motors
Enterprise Material 6th March 2015
No Details Quantity Unit price Total
1. 3” PVC Pipe 1 38 38
2. 2” PVC Pipe 1 30 30
3. 1 ¼ ” PVC Pipe 2 30 60
4. ¾ ” PVC Pipe 8 15 120
5. ½ ” PVC Pipe 2 15 30
6. 4” Elbow 3 7 21
7. 3” Elbow 3 5 15
8. 2” Elbow 4 4 16
9. 1 ¼ Elbow 10 5 50
10. ¾ Elbow 10 1 10
11. ½” 3/8 Adopter 15 1 15
12. ½ ” Elbow 7 1 7
13. ¾ Tee 4 1 4
14. 1 ¼ Tee 1 5 5
15. 3× ½ Tee 7 1 7
16. ½” K 28 15 5 75
17. 3× ½ Reducer 10 1 10
18. ½” Rubber Plug 15 1 15
19. Thread Tape 20 2 40
20. S 100 Glue 2 15 30
21. ½” Original Chromium Stop Cock ATA 8 30 240
22. ½” Valve Socket 18 1 18
23. ¾ Valve Socket 10 1 10
24. ¾” Stop Cock 5 25 125
25. 2” Vent Cup 1 5 5
26. 4” End Cup 6 5 30
27. 1 ¼ End Cup 6 5 30
28. 2 End Cup 2 5 10
29. 3 End Cup 4 5 20
30. GHACEM 2 30 60
Total GH¢ 1,146

Material Cost GH¢1,146

T&T GH¢ 100

Workmanship GH¢900

Grand Total GH¢ 2,146

Submitted by

………………….

K. Offei

(General Manager)

K. OFFEI PLUMBING WORKS


GA WEST ACCRA NSAWAM ROAD, ACCRA
0244820252/0277868181
First Phase : CHISEL AND RUNNING - Madina Japan Motors
Enterprise Material 6th March 2015
No Details Quantity Unit price Total
1. 2” PVC Pipe 14 30 420
2. 1 ¼ ” PVC Pipe 6 30 180
3. ¾ ” PVC Pipe 35 15 525
4. 1 ½ ” PVC Pipe 1 30 30
5. ½ ” PVC Pipe 7 15 105
6. 4” Elbow 35 7 245
7. 3” Elbow 70 1 70
8. 2” Elbow 46 4 184
9. 1 ¼ ” Elbow 25 5 125
10. 4” 45 Elbow 6 7 42
11. ½” Elbow 40 1 40
12. 2” 45 Elbow 4 5 20
13. ½” 3/8 Adopter 65 1 65
14. ¾ Tee 20 1 20
15. ¾ × ½ Tee 40 1 40
16. 2” Tee 14 6 84
17. ½” K 28 65 5 325
18. ¾ × ½ Reducer 40 1 40
19. 2× 1 ½ Bushy 6 7 42
20. 2× 1 ¼ Reducer 10 7 70
21. ½” Rubber Plug 65 1 65
22. Thread Tape 10 Packet 2 200
23. S 100 Glue 7 15 105
24. ½” Original Chromium Stop Cock ATA 30 30 900
25. ½” Valve Socket 60 1 60
26. ¾ Valve Socket 50 1 50
27. ¾” Stop Cock 25 25 625
28. 2” Vent Cup 3 5 15
29. 4” End Cup 12 5 60
30. 2” End Cup 14 5 70
31. 4” Clip 16 5 80
32. 2” Clip 16 5 80
33. 1 ½ End Cup 7 5 35
34. 1 ¼ End Cup 10 5 50
35. GHACEM 4 30 120
Total GH¢ 5,187

Material Cost GH¢5,187

T&T GH¢ 100

Workmanship GH¢3,700

Grand Total GH¢ 8,987

Submitted by

………………….

K. Offei

(General Manager)

K. OFFEI PLUMBING WORKS


GA WEST ACCRA NSAWAM ROAD, ACCRA
0244820252/0277868181
First Phase : CHISEL AND RUNNING - NKAWNKAW
Good Material Enterprise
No Details Quantity Unit price Total
1. 4” PVC Pipe 14 26 364
2. 3” PVC Pipe 7 38 266
3. 2” PVC Pipe 0.5 10 5
4. 1 ¼ ” PVC Pipe 1 25 25
5. ¾ ” PVC Pipe 15 16 240
6. ½ ” PVC Pipe 4 15 60
7. 4” Elbow 8 7 56
8. 3” Elbow 7 7 49
9. ¾ ” Elbow 30 2 60
10. 1 ¼ ” Elbow 7 2 14
11. 4” 45 Elbow 3 8 24
12. 2” 45 Elbow 6 5 30
13. ½” Elbow 20 1 20
14. 3” 45 Elbow 2 5 10
15. 2” Elbow 7 3 21
16. ½” 3/8 Adopter 20 1 20
17. ¾ Tee 10 1 10
18. 2” Tee 3 5 15
19. ¾ × ½ Tee 10 1 10
20. 1 ¼ Tee 1 2 2
21. 4” Swept Tee 4 15 60
22. 3” Swept Tee 4 15 60
23. 4” Y ( Tee) 5 20 100
24. 3” Y ( Tee) 6 15 90
25. 4” Clean Out 5 15 75
26. 3” Clean Out 6 15 90
27. ½” K 28 25 7 175
28. ½” K 26 25 7 175
29. ½” K 1 10 7 70
30. 3×2 Bushy 6 10 60
31. 4×3 Bushy 2 10 20
32. 2× 1 ¼ Bushy 6 5 30
33. ¾ × ½ Reducer 15 1 15
34. Thread Tape 40 2 80
35. S 100 Glue 5 15 75
36. ½” Valve Socket 30 1 30
37. ¾ Valve Socket 12 1 12
38. ½” Rubber Plug 20 2 40
39. ½ ” Chromium Stop Cock (ATA) 15 30 450
40. ¾ ” Stop Cock 6 25 150
41. ½” Copper Pipe 5 90 450
42. 3” Vent Cup 2 10 20
43. 2” Floor Drill 7 8 56
44. 4” End Cup 1 5 5
45. ½ ” End Cup 5 2 10
46. ¾ ” End Cup 2 2 4
47. 1 ¼ ” End Cup 5 5 25
48. GHACEM 3 30 90
Total GH¢ 3,818

Material Cost GH¢3,818

T&T GH¢ -

Workmanship GH¢1,800

Grand Total GH¢ 5,618

Submitted by

………………….

K. Offei

(General Manager)
K. OFFEI PLUMBING WORKS
GA WEST ACCRA NSAWAM ROAD, ACCRA
0244820252/0277868181
Second Phase : FIXING - NKAWNKAW
Good Material
No Details Quantity Unit price Total
1. WC Crus Couple Set 5 550 2750
2. Bath 2 230 460
3. Bath Tap Telephone shower 4 170 680
4. Bathroom Accessories 5 100 500
5. Basin Mirror 5 100 500
6. 30 meters Aliston Heater 5 470 2350
7. Basin screws 5 5 25
8. Silicon 990 4 10 40
9. ½” Flexible tube , male to female 6 5 30
10. ½” Flexible tube , female to female 5 15 75
11. Kitchen Sink set (double bow, double arm) 1 450 450
12. K2 30 7 210
13. Thread tape 20 2 40
14. K26 7 7 49
15. ½” PVC Pipe 1 15 15
16. ½” Elbow 5 1 5
17. S 100 1 15 15
18. GHACEM Cement 1 30 30
Total GH¢ 8,224

Material Cost GH¢8,224


T&T GH¢ -
Workmanship GH¢1,400
Grand Total GH¢9,624

Submitted by

………………….
K. Offei
(General Manager)
K. OFFEI PLUMBING WORKS
GA WEST ACCRA NSAWAM ROAD, ACCRA
0244820252/0277868181
First Phase : FIXING - Kuntunse 7th October,2015
Good Material
No Details Quantity Unit price Total
1. 4” PVC Pipe 15 26 390
2. 3” PVC Pipe 7 38 266
3. 2” PVC Pipe 2 30 60
4. 1 ¼ ” PVC Pipe 0.5 10 5
5. ¾ ” PVC Pipe 8 16 128
6. ½ ” PVC Pipe 1 15 15
7. 1½ ” PVC Pipe 0.5 10 5
8. ¾ ” Elbow 10 2 20
9. 1 ¼ ” Elbow 6 5 30
10. 1 ½” Elbow 3 5 15
11. ½” Elbow 5 2 10
12. 2” Elbow 7 3 21
13. ½” 3/8 Adopter 10 2 20
14. ½” Tee 2 2 4
15. ¾ Tee 10 2 20
16. ½” K 28 10 7 70
17. ¾ × ½ Reducer 7 2 14
18. Thread Tape 10 2 20
19. S 100 Glue 3 15 45
20. ½” Valve Socket 10 2 20
21. ¾ Valve Socket 6 2 12
22. ½” Rubber Plug 10 2 20
23. ½ ” Stop Cock 5 15 75
24. ¾ ” Stop Cock 3 25 75
25. 2” Vent Cup 2 5 10
26. 2” Floor Drill 1 20 20
27. GHACEM 1 30 30
Total GH¢ 1,420
Material Cost GH¢1,420
T&T GH¢ 70
Workmanship GH¢1,100
Grand Total GH¢2,590 Submitted by
………………….
K. Offei
(General Manager)
GA WEST ACCRA NSAWAM ROAD, ACCRA
0244820252/0277868181
Second Phase : FIXING - Kuntunse 7th October,2015
Good Material
No Details Quantity Unit price Total
1. WC Crus Couple and basin Set 2 600 1200
2. Bath set 1 250 250
3. Bath Tap Telephone shower 2 180 360
4. Bathroom Accessories 2 100 200
5. Basin Mirror 2 100 200
6. 30 meters Aliston Heater 1 470 470
7. Basin screws 2 5 10
8. Silicon 990 2 10 20
9. ½” Flexible tube 10 7 70
10. Kitchen Sink set (double bow, double arm) 1 450 450
11. K2 10 7 70
12. Thread tape 10 2 20
13. ¾ Forset Elbow 2 10 20
14. ½” Angle Valve 2 30 60
15. ¾ Wholes Tap 2 30 60
16. GHACEM Cement 1 30 30
Total GH¢ 3,490

Material Cost GH¢3,490


T&T GH¢ 70
Workmanship GH¢800
Grand Total GH¢4,460 Submitted by

………………….
K. Offei
(General Manager)
K. OFFEI PLUMBING WORKS
GA WEST ACCRA NSAWAM ROAD, ACCRA
0244820252/0277868181
First Phase : ATOMIC 20th October,2015
Good Material
No Details Quantity Unit price Total
1. 4” PVC Pipe 34 26 884
2. 2” PVC Pipe 2 38 76
3. 1 ¼ ” PVC Pipe 4 30 120
4. ¾ ” PVC Pipe 33 17 561
5. ½ ” PVC Pipe 4 15 60
6. 4” Elbow 10 8 80
7. 2” Elbow 10 5 50
8. ¾ ” Elbow 90 2 180
9. 1 ¼ ” Elbow 25 5 125
10. ½” Elbow 30 2 60
11. ½” 3/8 Adopter 50 1 50
12. 4” Y Tee 15 20 300
13. ¾ Tee 30 2 60
14. 2” Tee 2 5 10
15. ¾ × ½ Tee 30 2 60
16. 1 ¼ Tee 5 5 25
17. 4” Swept Tee 12 17 204
18. ½” K 28 50 8 400
19. ½” K 26 15 8 120
20. ½” K 1 10 8 80
21. 4×2 Bushy 6 10 60
22. 2× 1 ¼ Bushy 6 10 60
23. ¾ × ½ Reducer 40 2 80
24. Thread Tape 10 packet 2 20
25. 4” Clean out 15 15 225
26. S 100 Glue 7 15 105
27. ½” Valve Socket 70 1 70
28. ¾ Valve Socket 14 1 14
29. ½” Rubber Plug 50 2 100
30. ½ ” Stop Cock 34 16 544
31. ¾ ” Stop Cock 6 30 180
32. ½” Copper Pipe 5 100 500
33. 4” Vent Cup 2 10 20
34. 4” End Cup 4 5 20
35. 2” End Cup 6 5 30
36. ½ ” End Cup 3 1 3
37. ¾ ” End Cup 3 1 3
38. 1 ¼ ” End Cup 15 5 75
39. GHACEM 5 32 160
Total GH¢ 5,774

Material Cost GH¢5,774


T&T GH¢ 100
Workmanship GH¢4500
Grand Total GH¢10,374 Submitted by
………………….
K. Offei
(General Manager)
K. OFFEI PLUMBING WORKS
GA WEST ACCRA NSAWAM ROAD, ACCRA
0244820252/0277868181
First Phase : KASOA 26TH November ,2015
Good Material
No Details Quantity Unit price Total
1. 4” PVC Pipe 3 26 78
2. 2” PVC Pipe 1 38 38
3. 3” PVC Pipe 1/2 15 7.5
4. 1 ¼ ” PVC Pipe 2 30 60
5. ¾ ” PVC Pipe 4 17 68
6. ½ ” PVC Pipe 2 15 30
7. 4” Elbow 3 8 24
8. 2” Elbow 4 5 20
9. 3” Elbow 1 5 5
10. ¾ ” Elbow 15 2 30
11. 1 ¼ ” Elbow 10 5 50
12. ½” Elbow 10 2 20
13. ½” 3/8 Adopter 15 1 15
14. ¾ Tee 4 2 8
15. ¾ × ½ Tee 10 2 20
16. 3” Swept Tee 3 15 45
17. ½” K 28 15 8 120
18. ½” K 26 15 8 120
19. ½” K 1 5 8 40
20. 3×2 Bushy 3 10 30
21. 2× 1 ¼ Bushy 3 10 30
22. ¾ × ½ Reducer 10 2 20
23. Thread Tape 20 2 40
24. S 100 Glue 2 15 30
25. ½” Valve Socket 16 1 16
26. ¾ Valve Socket 10 1 10
27. ½” Rubber Plug 15 2 30
28. ½ ” Original Chromium Stop Cock ATA 10 35 350
29. ¾ ” Stop Cock 4 30 120
30. ½” Copper Pipe 3 100 300
31. 2” Vent Cup 1 10 10
32. 4” End Cup 3 5 15
33. 3” End Cup 3 5 15
34. 2” End Cup 2 5 10
35. 1 ¼ ” End Cup 3 5 15
36. GHACEM 2 32 64
Total GH¢ 1,903.5

Material Cost GH¢ 1,903.5


T&T GH¢ 100
Workmanship GH¢1,200
Grand Total GH¢3,203.5 Submitted by
………………….
K. Offei
(General Manager)

Das könnte Ihnen auch gefallen