BAR SCHEDULE Revision B 29/01/18 RCD 046 ISSUE 1

No. of Length of
Bar Type No. of Total Shape A* B* C* D* E/R *
Member bars in each bar
Mark & Size mbrs no. code
each (mm)+

TOP REBAR 01 H20 2 82 164 8650 00

02 H20 2 10 20 5250 00

03 H20 2 34 68 5675 00

04 H20 2 87 174 11550 00

05 H20 2 39 78 8750 00

06 H25 2 51 102 5600 00

07 H32 2 15 30 4675 00

08 H20 2 138 276 5550 00

09 H25 2 100 200 5450 00

10 H25 2 41 82 5425 00

11 H25 2 124 248 3150 00

12 H20 2 796 1592 1375 11 260 (1150)

13 H16 2 138 276 1275 11 190 (1100)

14 H16 2 46 92 1300 11 190 (1140)

15 H25 2 43 86 5450 00

16 H25 2 12 24 3075 00

17 H32 2 28 56 6550 00

18 H25 2 74 148 3625 00

19 H20 2 31 62 8525 00

20 H20 2 31 62 7925 00

21 H25 2 121 242 7025 00

22 H25 2 5 10 4050 00

23 H25 2 5 10 3450 00
23 H25 2 5 10 3450 00

9 Prussia Street
Project: DUBLIN LANDINGS Date:
Dublin 7
Ireland BLOCK A Drawn:

Tel: +353 (0)1 868 2000 Location: SECOND AND FOURTH FLOOR SLAB Chkd:
Fax: +353 (0)1 868 2100
Email: contactus@ocsc.ie
Web: www.ocsc.ie TOP REBAR Drg No:

Sh:

This Schedule complies with BS 8666, 2005 * Specified in multiples of 5mm + Specified to nearest 25mm

BAR SCHEDULE Revision B 29/01/18 RCD 046 ISSUE 1

No. of Length of
Bar Type No. of Total Shape A* B* C* D* E/R *
Member bars in each bar
Mark & Size mbrs no. code
each (mm)+

TOP REBAR 24 H20 2 119 238 12000 00

25 H20 2 42 84 11425 00

26 H20 2 25 50 11375 00

27 H20 2 51 102 5375 00

28 H20 2 15 30 2900 00

29 H20 2 20 40 5825 00

30 H20 2 19 38 5225 00

31 H20 2 3 6 4125 00

32 H20 2 2 4 3525 00

33 H20 2 55 110 8200 00

34 H20 2 11 22 6550 00

35 H20 2 19 38 7475 00

36 H20 2 19 38 6875 00

37 H20 2 5 10 3550 00

38 H20 2 62 124 11850 00

39 H20 2 3 6 4800 00

40 H20 2 2 4 4200 00
41 H20 2 6 12 10650 00

42 H20 2 5 10 10050 00

43 H20 2 8 16 9825 00

44 H20 2 7 14 9225 00

45 H20 2 5 10 6500 00

46 H20 2 4 8 5900 00

9 Prussia Street
Project: DUBLIN LANDINGS Date:
Dublin 7
Ireland BLOCK A Drawn:

Tel: +353 (0)1 868 2000 Location: SECOND AND FOURTH FLOOR SLAB Chkd:
Fax: +353 (0)1 868 2100
Email: contactus@ocsc.ie
Web: www.ocsc.ie TOP REBAR Drg No:

Sh:

This Schedule complies with BS 8666, 2005 * Specified in multiples of 5mm + Specified to nearest 25mm

BAR SCHEDULE Revision B 29/01/18 RCD 046 ISSUE 1

No. of Length of
Bar Type No. of Total Shape A* B* C* D* E/R *
Member bars in each bar
Mark & Size mbrs no. code
each (mm)+

TOP REBAR 47 H20 2 6 12 7575 00

48 H20 2 6 12 6975 00

49 H20 2 11 22 5150 00

50 H20 2 21 42 2900 00

51 H25 2 39 78 11525 00

52 H25 2 60 120 3275 00

53 H25 2 56 112 2675 00

54 H25 2 6 12 2700 00

55 H25 2 6 12 2100 00

56 H25 2 9 18 4275 00

57 H25 2 3 6 3675 00
58 H25 2 2 4 3075 00

59 H25 2 13 26 6300 00

60 H25 2 29 58 8400 00

61 H20 2 69 138 7475 00

62 H20 2 69 138 6875 00

63 H20 2 7 14 4825 00

64 H20 2 7 14 4225 00

65 H25 2 58 116 6400 00

66 H20 2 76 152 11650 00

67 H20 2 3 6 11700 00

68 H20 2 3 6 11100 00

69 H20 2 9 18 6150 00

9 Prussia Street
Project: DUBLIN LANDINGS Date:
Dublin 7
Ireland BLOCK A Drawn:

Tel: +353 (0)1 868 2000 Location: SECOND AND FOURTH FLOOR SLAB Chkd:
Fax: +353 (0)1 868 2100
Email: contactus@ocsc.ie
Web: www.ocsc.ie TOP REBAR Drg No:

Sh:

This Schedule complies with BS 8666, 2005 * Specified in multiples of 5mm + Specified to nearest 25mm

BAR SCHEDULE Revision B 29/01/18 RCD 046 ISSUE 1

No. of Length of
Bar Type No. of Total Shape A* B* C* D* E/R *
Member bars in each bar
Mark & Size mbrs no. code
each (mm)+

TOP REBAR 70 H20 2 8 16 5550 00

71 H20 2 3 6 11700 00

72 H20 2 3 6 11100 00

73 H20 2 4 8 6575 00

74 H20 2 3 6 5975 00
75 H20 2 18 36 2850 00

76 H20 2 17 34 2250 00

77 H20 2 5 10 2575 11 260 (2360)

78 H20 2 2 4 7700 00

79 H20 2 9 18 3150 00

80 H20 2 2 4 5500 00

81 H20 2 5 10 3250 00

82 H20 2 8 16 8950 00

83 H20 2 6 12 5325 00

84 H20 2 7 14 4850 00

85 H20 2 6 12 3300 00

86 H25 2 14 28 5100 00

87 H25 2 42 84 5300 00

88 H25 2 61 122 5900 00

89 H20 2 490 980 1575 11 260 (1350)

90 H20 2 17 34 1925 11 190 (1765)

91 H20 2 13 26 1700 11 190 (1545)

92 H20 2 10 20 2175 00

9 Prussia Street
Project: DUBLIN LANDINGS Date:
Dublin 7
Ireland BLOCK A Drawn:

Tel: +353 (0)1 868 2000 Location: SECOND AND FOURTH FLOOR SLAB Chkd:
Fax: +353 (0)1 868 2100
Email: contactus@ocsc.ie
Web: www.ocsc.ie TOP REBAR Drg No:

Sh:

This Schedule complies with BS 8666, 2005 * Specified in multiples of 5mm + Specified to nearest 25mm

BAR SCHEDULE Revision B 29/01/18 RCD 046 ISSUE 1


No. of Length of
Bar Type No. of Total Shape A* B* C* D* E/R *
Member bars in each bar
Mark & Size mbrs no. code
each (mm)+

TOP REBAR 93 H20 2 11 22 2025 11 190 (1865)

94 H20 2 13 26 1675 11 190 (1515)

95 H20 2 13 26 1450 11 190 (1290)

96 H16 2 14 28 1075 11 190 (900)

97 H20 2 15 30 11925 00

98 H20 2 14 28 11325 00

99 H20 2 52 104 8400 00

100 H20 2 13 26 7825 00

101 H20 2 18 36 8850 00

102 H20 2 55 110 9100 00

103 H20 2 23 46 8850 00

105 H20 2 2 4 7950 00

106 H20 2 23 46 11875 00

107 H20 2 20 40 10375 00

108 H20 2 19 38 9775 00

109 H25 2 8 16 3100 00

110 H25 2 8 16 2500 00

111 H20 2 13 26 7525 00

112 H25 2 35 70 3450 00

113 H20 2 38 76 4025 00

114 H20 2 14 28 10525 00

115 H25 2 33 66 2850 00

116 H20 2 38 76 3425 00

9 Prussia Street
Project: DUBLIN LANDINGS Date:
Dublin 7
Ireland

Tel: +353 (0)1 868 2000


Fax: +353 (0)1 868 2100
Email: contactus@ocsc.ie
Web: www.ocsc.ie
9 Prussia Street
Dublin 7
Ireland BLOCK A Drawn:

Tel: +353 (0)1 868 2000 Location: SECOND AND FOURTH FLOOR SLAB Chkd:
Fax: +353 (0)1 868 2100
Email: contactus@ocsc.ie
Web: www.ocsc.ie TOP REBAR Drg No:

Sh:

This Schedule complies with BS 8666, 2005 * Specified in multiples of 5mm + Specified to nearest 25mm

BAR SCHEDULE Revision B 29/01/18 RCD 046 ISSUE 1

No. of Length of
Bar Type No. of Total Shape A* B* C* D* E/R *
Member bars in each bar
Mark & Size mbrs no. code
each (mm)+

TOP REBAR 117 H25 2 8 16 2625 00

118 H25 2 8 16 2025 00

119 H25 2 7 14 4950 00

120 H25 2 7 14 5550 00

121 H20 2 32 64 1525 11 260 (1300)

122 H20 2 14 28 9350 00

123 H20 2 3 6 6600 00

124 H20 2 2 4 6000 00

125 H25 2 45 90 5975 00

126 H20 2 6 12 2425 11 260 (2200)

127 H20 2 6 12 1825 11 260 (1600)

128 H20 2 23 46 4500 00

129 H20 2 23 46 3900 00

130 H20 2 14 28 10850 00

131 H25 2 7 14 3925 00

132 H25 2 7 14 3325 00

133 H20 2 46 92 1600 11 300 (1340)

134 H20 2 8 16 2975 00


135 H25 2 39 78 5650 00

136 H20 2 26 52 11975 00

137 H16 2 1 2 1750 11 190 (1590)

TRIMMER
104 H20 50 2 100 1800 00
BARS

9 Prussia Street
Project: DUBLIN LANDINGS Date:
Dublin 7
Ireland BLOCK A Drawn:

Tel: +353 (0)1 868 2000 Location: SECOND AND FOURTH FLOOR SLAB Chkd:
Fax: +353 (0)1 868 2100
Email: contactus@ocsc.ie
Web: www.ocsc.ie TOP REBAR Drg No:

Sh:

This Schedule complies with BS 8666, 2005 * Specified in multiples of 5mm + Specified to nearest 25mm

BAR SCHEDULE Revision B 29/01/18 RCD 046 ISSUE 1

No. of Length of
Bar Type No. of Total Shape A* B* C* D* E/R *
Member bars in each bar
Mark & Size mbrs no. code
each (mm)+

TOP REBAR 138 H32 2 15 30 5450 00

139 H25 2 11 22 7350 00

140 H25 2 34 68 7350 00


9 Prussia Street
Project: DUBLIN LANDINGS Date:
Dublin 7
Ireland BLOCK A Drawn:

Tel: +353 (0)1 868 2000 Location: SECOND AND FOURTH FLOOR SLAB Chkd:
Fax: +353 (0)1 868 2100
Email: contactus@ocsc.ie
Web: www.ocsc.ie TOP REBAR Drg No:

Sh:

This Schedule complies with BS 8666, 2005 * Specified in multiples of 5mm + Specified to nearest 25mm
1 Rev 1

Total
E/R * Rev
Mass
letter
kg

3503.942

259.350

953.173

4963.959

1685.775

B 2199.120

B 884.978

3783.546

B 4196.500

B 1712.673

B 3007.620

B 5406.830

B 556.002

188.968

B 1804.495

B 284.130

B 2314.508

B 2065.525

1305.519

B 1213.634

6545.193

B 155.925

B 132.825
B 132.825

Date: 29/01/18
Drawn: VK
Chkd: RH

Drg No: O574 3135

1 of 1 B
st 25mm

1 Rev 1

Total
E/R * Rev
Mass
letter
kg

7054.320

2370.459

1404.813

1354.178

214.890

575.510

490.419

61.133

34.827

2227.940

355.927

701.604

645.288

87.685

B 3629.418

71.136

41.496
315.666

248.235

388.284

319.001

160.550

116.584

Date: 29/01/18
Drawn: VK
Chkd: RH

Drg No: O574 3135

1 of 1 B
st 25mm

1 Rev 1

Total
E/R * Rev
Mass
letter
kg

224.523

206.739

279.851

300.846

3460.958

B 1513.050

B 1153.460

B 124.740

B 97.020

296.258

84.893
47.355

630.630

1875.720

2547.929

2343.413

166.849

146.101

2858.240

4373.876

173.394

164.502

273.429

Date: 29/01/18
Drawn: VK
Chkd: RH

Drg No: O574 3135

1 of 1 B
st 25mm

1 Rev 1

Total
E/R * Rev
Mass
letter
kg

219.336

B 173.394

B 164.502

129.922

88.550
253.422

188.955

B 63.603

76.076

140.049

54.340

80.275

353.704

157.833

167.713

97.812

549.780

1714.020

B 2771.230

B 3812.445

161.662

109.174

107.445

Date: 29/01/18
Drawn: VK
Chkd: RH

Drg No: O574 3135

1 of 1 B
st 25mm

1 Rev 1
Total
E/R * Rev
Mass
letter
kg

110.039

B 107.569

B 93.119

B 47.558

883.643

783.237

2157.792

502.522

786.942

2472.470

1005.537

78.546

1349.238

1025.050

917.482

B 190.960

B 154.000

483.256

B 929.775

755.573

B 727.909

B 724.185

642.941

Date: 29/01/18
Drawn: VK
Chkd: RH

Drg No: O574 3135

1 of 1 B
st 25mm

1 Rev 1

Total
E/R * Rev
Mass
letter
kg

B 161.700

B 124.740

266.805

299.145

B 241.072

646.646

97.812

59.280

2070.338

B 71.877

B 54.093

511.290

443.118

750.386

211.558

179.218

B 363.584

117.572
1696.695

1538.069

5.530

B 444.600

Date: 29/01/18
Drawn: VK
Chkd: RH

Drg No: O574 3135

1 of 1 B
st 25mm

1 Rev 1

Total
E/R * Rev
Mass
letter
kg

1031.685

622.545

1924.230
Date: 29/01/18
Drawn: VK
Chkd: RH

Drg No: O574 3135

1 of 1 B
st 25mm
3135
BAR SCHEDULE
RCD ISSUE 1
No. of Length of Total
Bar Type No. of Total Shape A* B* C* D* E/R * Rev
Member bars in each bar Mass
Mark & Size mbrs no. code letter
each (mm)+ kg

89 H20 1 44 44 1575 11 260 (1350) B 170.9

120 H25 1 7 7 5550 00 149.7

119 H25 1 7 7 4950 00 133.5

114 H20 1 14 14 10525 00 B 363.4

12 H20 1 6 6 1375 11 260 (1150) B 20.3

67 H20 1 3 3 11700 00 86.6

68 H20 1 3 3 11100 00 82.1

17 H32 1 28 28 6550 00 B 1157.9

66 H20 1 44 44 11650 00 1264.1

65 H25 1 29 29 6400 00 715.2

140 H25 1 34 34 7350 00 963.0

100 H20 1 13 13 7825 00 250.9

101 H20 1 18 18 8850 00 392.9

102 H20 1 55 55 9100 00 1234.3

57 H25 1 3 3 3675 00 42.5

58 H25 1 2 2 3075 00 23.7

89 H20 1 18 18 1575 11 260 (1350) B 69.9

121 H20 1 32 32 1525 11 260 (1300) B 120.3

113 H20 1 38 38 4025 00 377.2

116 H20 1 38 38 3425 00 321.0

12 H20 1 6 6 1375 11 260 (1150) B 20.3

111 H20 1 13 13 7525 00 241.3

71 H20 1 3 3 11700 00 B 86.6

72 H20 1 3 3 11100 00 B 82.1

66 H20 1 32 32 11650 00 919.4

86 H25 1 14 14 5100 00 275.1

89 H20 1 104 104 1575 11 260 (1350) B 404.0

69 H20 1 9 9 6150 00 136.5

TOP
70 H20 1 8 8 5550 00 109.5
REBAR
12 H20 1 68 68 1375 11 260 (1150) B 230.6

12 H20 1 60 60 1375 11 260 (1150) B 203.5

12 H20 1 91 91 1375 11 260 (1150) B 308.6

107 H20 2 20 20 10375 00 511.7

108 H20 2 19 19 9775 00 458.0

21 H25 2 40 40 7025 00 1082.8

106 H20 2 23 23 11875 00 673.6

31 H20 2 3 3 4125 00 30.5

32 H20 2 2 2 3525 00 17.4

89 H20 2 37 37 1575 11 260 (1350) B 143.7

56 H25 2 9 9 4275 00 148.3

07 H32 2 15 15 4675 00 B 442.7

03 H20 2 34 34 5675 00 475.8

33 H20 2 2 2 8200 00 40.4

TOP
01 H20 2 34 34 8650 00 725.3
REBAR
123 H20 2 3 3 6600 00 48.8

124 H20 2 2 2 6000 00 29.6

15 H25 2 15 15 5450 00 B 315.0

15 H25 2 28 28 5450 00 B 588.0

04 H20 2 39 39 11550 00 1110.9

59 H25 2 13 13 6300 00 315.6

05 H20 2 39 39 8750 00 841.6


TOP
138 H32 2 15 15 5450 00 516.1
REBAR
89 H20 2 37 37 1575 11 260 (1350) B 143.7

103 H20 2 23 23 8850 00 502.0

29 H20 2 20 20 5825 00 287.3

30 H20 2 19 19 5225 00 244.8

12 H20 2 14 14 1375 11 260 (1150) B 47.5

TOTAL
20697.9
PROJECT: DUBLIN LANDINGS Date: 1/29/2018
BLOCK A
Drawn: VK

Location: SECOUND FLOOR SLAB Chkd: RH


TOP REBAR Drg No: O574 3135
GRID 13-08C/A-E7 ,DL3
Sh: 1 OF 1 B
3135
BAR SCHEDULE
RCD ISSUE 1
No. of Length of Total
Bar Type No. of Total Shape A* B* C* D* E/R * Rev
Member bars in each bar Mass
Mark & Size mbrs no. code letter
each (mm)+ kg

87 H25 1 14 14 5300 00 285.9

130 H20 1 14 14 10850 00 374.6

63 H20 1 7 7 4825 00 83.3

64 H20 1 7 7 4225 00 72.9

12 H20 1 200 200 1375 11 260 (1150) B 678.2

131 H25 1 7 7 3925 00 105.9

132 H25 1 7 7 3325 00 89.7

12 H20 1 192 192 1375 11 260 (1150) B 651.1

21 H25 1 85 85 7025 00 2300.9

35 H20 1 19 19 7475 00 350.3

36 H20 1 19 19 6875 00 322.1

37 H20 1 5 5 3550 00 43.8

89 H20 1 5 5 1575 11 260 (1350) B 19.4

34 H20 1 11 11 6550 00 177.7

39 H20 1 3 3 4800 00 35.5

40 H20 1 2 2 4200 00 20.7

45 H20 1 5 5 6500 00 80.1

46 H20 1 4 4 5900 00 58.2

TOP
47 H20 1 6 6 7575 00 112.1
REBAR
48 H20 1 6 6 6975 00 103.2

12 H20 1 9 9 1375 11 260 (1150) B 30.5

89 H20 1 15 15 1575 11 260 (1350) B 58.3

19 H20 1 31 31 8525 00 651.7

20 H20 1 31 31 7925 00 B 605.9

25 H20 1 42 42 11425 00 1183.4

38 H20 1 62 62 11850 00 B 1811.9

06 H25 1 51 51 5600 00 B 1100.5

89 H20 1 42 42 1575 11 260 (1350) B 163.1

105 H20 1 2 2 7950 00 39.2

51 H25 1 39 39 11525 00 1732.0

TOP
24 H20 1 51 51 12000 00 1509.3
REBAR
89 H20 1 5 5 1575 11 260 (1350) B 19.4

43 H20 1 8 8 9825 00 193.8

44 H20 1 7 7 9225 00 159.3

41 H20 1 6 6 10650 00 157.6

42 H20 1 5 5 10050 00 123.9

89 H20 1 27 27 1575 11 260 (1350) B 104.9

27 H20 1 51 51 5375 00 676.0

12 H20 1 11 11 1375 11 260 (1150) B 37.3

135 H25 1 39 39 5650 00 849.1

136 H20 1 26 26 11975 00 767.8

26 H20 1 25 25 11375 00 701.3

99 H20 1 52 52 8400 00 1077.2

12 H20 1 112 112 1375 11 260 (1150) B 379.8


TRIMMER
104 H20 1 50 50 1800 00 B 222.0
BARS
TOTAL
20320.9
PROJECT: DUBLIN LANDINGS Date: 1/29/2018
BLOCK A
Drawn: VK

Location: SECOUND FLOOR SLAB Chkd: RH


TOP REBAR Drg No: O574 3135
GRID 15C-13/A-E7 ,DL3
Sh: 1 OF 1 B

Das könnte Ihnen auch gefallen