REPORT
(FOUR WEEKS)
AT
MAHINDRA TRACTORS
( muzaffarnagar )
INTRODUCTION TO THE
MAHINDRA
Organization:- Established in 1963.
Assembly Plants:-
Baroda, Gujarat -Mahindra Gujarat
Chappercheri - Swaraj plant
Jaipur, Rajasthan
Mumbai, Maharashtra
Mohali, Punjab
Nagpur, Maharashtra
Rudrapur, Uttarakhand
Zaherabad, Andhra Pradesh
Nashik, Maharashtra
Mahindra Tractors is number one in sales in
India - the largest tractor market in the
world.
it has been the market leader since 1983.
Its sales are predominantly in the states of
Gujrat, Haryana, Punjab, Maharashtra and
the Southern States. Its sales in Gujarat are
under the label Mahindra Gujarat and its
sales in Punjab are under the label Swaraj.
In 1999, Mahindra purchased 100% of
Gujarat Tractors from the Government of
Gujarat ??[9] and Mahindra purchased a
64.6% stake in Swaraj in 2004.
The Various Processes Occurs Under
MAHINDRA TRACTOR DIVISION Are As
Under:-
• Light Machine Shop
• Heavy Machine Shop
• Assembly Shop
• Paint Shop
• Tool Room
• Heat Treatment
• R & D Deptt.
LMS SHOP
INTRODUCTION:- 1.All shafts , gears,
bushes which are used in tractors are
manufactured here.
2.Most of machines are of HMT( for gear
shaver) and GERMAN (for bevel gear)
Machines used in LMS:-
1.Planer machine
2.Hand Lathe
3.Universal Milling Machine
4.Grinding Machine
5.Hydraulic Press
6.Bevel Generator
7.CNC Machines
Manufacturing Operations:-
Facing
Under cutting
Chamfering
Finish turning
Grooving
Knurling
Broaching
Drilling
Boring
Grinding
Hobbing
Shaping
Component Machined in Shop:
Differential housing
Gear box
Trumpet housing
Rear axle
PAINT SHOP
The paint shop can be classified into following sections:-
Response
Valve
Testing of rear cover for any leakage Assembly &
Sensor tube
attached
Rear Cover Assembly :-
1. Rear cover casting
2. Rocker shaft
3. The cylinder, rocker arm, connecting rod fitted
4. Bracket & levers
5. The response & control valve
6. Sensor tube
7. Testing
DISMOUNTING STAGE
The Dismounting Stage is divided into 5 stages:
Stage 3:- Fan, radiator, hose pipe, dash board & its cover,
number plate.
Stage 5:- Seat, sheet metal covers, tyre fixing, battery cover,
engine oil pouring & greasing, stickers.
THANK YOU