Sie sind auf Seite 1von 9

Thermal Overload Operating Times calculation Spreadsheet

This spreadsheet provides a method to calculate the thermal overload operating time.
The thermal overload operating time includes four items:
1.alarm operating time
2. trip operating time
3. alarm reset time
4. trip reset time

The user is required to enter the settings, and for each stage (except the last stage) the equivalent current applied.
The duration also needs to be entered if pre-heat and/or pre-cool is required.

There are four sheets in this spreadsheet. They are described as follows:
cold
This sheet applies when the conditions below are met:
1. The relay's initial injection current is zero.
2. Apply a current above I> for the relay to trip. The trip and alarm times are displayed. The trip time is automatically ent
this stage. (stage 1)
3. When the relay trips, the injection current is automatically removed by the spreadsheet. The expected reset times are d

pre-heat
This sheet applies when the conditions below are met:
1: The relay's initial injection current is zero.
2. Apply a current for a duration which is not sufficient to trip the relay (stage 1)
3. Increase the current above I> for the relay to trip. The trip and alarm times are displayed. The trip time is automatically
in this stage (stage 2)
4. When the relay trips, the injection current is automatically removed by the spreadsheet. The expected reset times are di

pre-heat&cool
This sheet applies when the conditions below are met:
1: The relay's initial injection current is zero.
2. Apply a current for a duration which is not sufficient to trip the relay. (stage 1)
3. Decrease the injection current for a certain duration. (stage 2)
4. Increase the current above I> for the relay to trip. The trip and alarm times are displayed The trip time is automatically e
in this stage. (stage 3)
5. When the relay trips, the injection current is automatically removed by the spreadsheet. The expected reset times are d

thermal ceiling
This sheet applies when the conditions below are met:
1: The relay's initial injection curret is zero.
2: Apply a current above the I> for the relay to get to the thermal ceiling. The expected minimum duration of Stage1 displ
3: Decrease the current under I>, wait the relay trip reset. The expected reset time displayed. (Stage 2)

In each sheet, there is also an instruction to use the spreadsheet.


In general, the yellow boxes are required to enter data, the red boxes display the calculated results.

VERSION CONTROL
Issue Author(s) Reason for change Date
A.1 Ping Ye / Tony Yip Initial draft. 30-10-2001
RELAY SETTINGS
I> (In) 1.2
Alarm (%) 100
Heating time constant (s) 60
Cooling time constant (s) 60
M Factor 0

APPLIED CURRENT AND DURATION

1. Intial current assumed to zero.


2. Enter the I1 & I2 in the yellow boxes of stage1 to produce Ieq which should be greater
than I> setting.
3. The expected alarm & trip time and alarm reset & trip reset time will be displayed in the
red boxes.

stage1 - Trip
I1 (In) 2.4
I2 (In) 0
1st stage Ieq (In) 2.4 Alarm operating time (s) 17.2609243471
1st stage Duration (s) 17.2609243 Trip operating time (s) 17.2609243471
Theta1 when trip 1
stage2 - Reset
2nd stage Ieq (In) 0 Alarm reset time (s) 3.0775976633
2nd stage Duration (s) 3.07759766 Trip reset time (s) 3.0775976633
Theta2 when trip resets 0.95
RELAY SETTINGS
I> (In) 1.2
Alarm (%) 90
Heating time constant (s) 3600
Cooling time constant (s) 60
M Factor 0

APPLIED CURRENT AND DURATION


1. Intial current assumed to zero.
2. Enter the I1 & I2 in the yellow boxes of stage1 to produce a Ieq which is less than I>
setting. Also enter the duration of this stage.
3. Enter the I1 & I2 in the yellow boxes of stage2 to produce a Ieq which is greater than I>
setting.
4. The expected alarm & trip time and alarm reset & trip reset time will be displayed in the
red boxes.

stage1 - Heating
I1 (In) 0.5
I2 (In) 0
1st stage Ieq (In) 0.5
1st stage Duration (s) 800
Theta1 of the pre- heat 0.0345942009

stage2 - Trip
I1 (In) 2.4
I2 (In) 0
2nd stage Ieq (In) 2.4 Alarm operating time (s) 886.3419011744
2nd stage Duration (s) 1004.38526 Trip operating time (s) 1004.3852633371
Theta2 when trip 1

stage3 - Reset
3rd stage Ieq (In) 0 Alarm reset time (s) 9.7511357699
3rd stage Duration (s) 3.07759766 Trip reset time (s) 3.0775976633
Theta3 when trip resets 0.95
RELAY SETTINGS
I> (In) 1.2
Alarm (%) 90
Heating time constant (s) 60
Cooling time constant (s) 60
M Factor 0

APPLIED CURRENT AND DURATION


1. Intial current assumed to zero.
2. Enter the I1 & I2 in the yellow boxes of stage1 to produce a Ieq which is less than I>
setting. Also enter the duration of this stage.
3. Enter the I1 & I2 in the yellow boxes of stage2 to produce a Ieq which is less than Ieq of
the stage1. Also enter the duration of this stage.
4. Enter the I1 & I2 in the yellow boxes of stage3 to produce a Ieq which is greater than I>
setting.
5. The expected alarm & trip time and alarm reset & trip reset time will be displayed in the
red boxes.

stage1- Heating
I1 (In) 0.5
I2 (In) 0
1st stage Ieq (In) 0.5
1st stage Duration (s) 600
Theta1 after pre-heat 0.1736032292
stage2 - Cooling
I1 (In) 0.5
I2 (In) 0
2nd stage Ieq (In) 0.5
2nd stage Duration (s) 60
Theta2 after cooling 0.1736082115
stage3 - Trip
I1 (In) 2
I2 (In) 0
3rd stage Ieq (In) 2 Alarm operating time (s) 19.6214877149
3rd stage Duration (s) 22.9049817 Trip operating time (s) 22.9049816962
Theta3 when trip 1
stage4 - Reset
4th stage Ieq (In) 0 Alarm reset time (s) 9.7511357699
4th stage Duration (s) 3.07759766 Trip reset time (s) 3.0775976633
Theta4 when trip resets 0.95
RELAY SETTINGS
I> (In) 1.2
Alarm (%) 90
Heating time constant (s) 60
Cooling time constant (s) 600
M Factor 0

APPLIED CURRENT AND DURATION

1. Intial current assumed to zero.


2. Enter the I1 & I2 in the yellow boxes of stage1 to produce Ieq which should be greater
than I> setting.
3. The expected time to the thermal ceilig and reset time will be displayed in the red boxes.

stage1 - Thermal Ceiling


I1 (In) 8
I2 (In) 0
1st stage Ieq (In) 8
1st stage Duration (s) 6 minimum duration (s) 5.6586407683
thermal ceiling 4
stage2 - Reset
2nd stage Ieq (In) 0.1
2nd stage Duration (s) 865.912095 Trip reset time (s) 865.9120954037
Theta2 when trip resets 0.95