1.2 Debris/material Waste Removal from Site, as per the Requirement on Site - sft
3 Masonry Works
Providing & rising siporex wall in 1:4 cement mortar including curing,
3.2 rakingjoints etc. 6" thk. Wall, including necessary RCC stiffener with 8mm
MS bar above doors and at 4'0" ht in walls..
Mallika's Room sft
Manan's Room sft
TOTAL sft
Providing & Applying smooth plaster on siporex /concrete walls with CM 1:4
3.4 including prewetting of walls, hacking where ever required, curing
etc.complete in line & level. (Internal)
Mallika's Room sft
Manan's Room sft
TOTAL sft
Total for Masonry work (new wall construction and plastering)
4 Waterproofing (Toilets)
Providing & Fixing of Italian Marble flooring Fixing of Above marble with
white cement and sand in true line and level, filling the joints with
8.1 matching cement color, cleaning polishing curing etc complete.., make and
shade as approved by the Architect with fibre backing (Basic average cost
of Marble Rs.450/SFT )
8.2 Italian Marble Skirting 3" thk. With recessed in wall with cement and sand 338.10 rft
Page 1
To,
Mr.
9 Toilets
Providing & Fixing of Italian Marble flooring with cement and sand in true
line and level, filling the joints with matching cement color, cleaning
9.1 449.65 sft
polishing curing etc complete.., make and shade as approved by the
Architect with fibre backing (Basic average cost of Marble Rs.450/SFT )
Wash Basin Counter : Providing & fixing with Indian Marble, cement & sand
for making granite slab counter supported on horizontal kadappas the slab
#REF! 27.03 rft
and twin minimum 1"thk.vertical indian marble slab struck to each other
with CM 1:5 bedding counter.(Edge Polishing & chamffering)
Providing & fixing CPVC ASTRAL MAKE pipes with necessary ISI fittings such
as elbows, tees, couplings which includes chasing in brk.wall.also,
PLUMBING (Internal Drain Pipes) P &fixing heavy duty pvc waste water 1.00 L.S
pipes with ISI marked bends nahani traps, W.C.waste pipes, wash basin
waste pipe connections etc. complete.
Supply, Installing & fixing of wash basin (Kholer, Escale series, K-19047IN-
1.00 nos
XBV-0)
Supply, Installing & fixing of Wall mounted EWC with standard seat cover
1.00 nos
(Kholer, Escale series, K-16817IN-SR-0)
Supply & fixing of Kholer Flush Tank (Kholer, K-77027IN-M-NA) 1.00 nos
Supply & fixing of Shower Mixture (Kholer, K-18019IN-4FP-CP) 1.00 nos
Supply & fixing of Rain Shower (Kholer, K-7389IN-CP) 1.00 nos
Supply & fixing of Wash Basin Mixture (Kholer, K-18000IN-ND-CP) 1.00 nos
Supply & fixing of Gyser (STIEBEL - 18Kw) 1.00 nos
Supply & fixing health faucet (Kholer, K-98100IN-0) 1.00 nos
Supply & fixing of Towel rod (Kholer, K-17521T-CP) 1.00 nos
Supply & fixing of Towel Ring (Kholer, K-5631IN-CP) 1.00 nos
Supply & fixing of Robe Hooks (Kholer, K-10555-CP) 2.00 nos
Supply & fixing Soap dish (Kholer, K-5634IN-CP) 2.00 nos
Supply & fixing Toilet paper holder (Kholer, K-5632IN-CP) 1.00 nos
Supply & fixing Angle Cock (Kholer, K-37317IN-4A-CP) 6.00 nos
Providing and Fixing BOTTLE TRAP for wash basin 1.00 nos
Page 2
To,
Mr.
P & Fixing false ceiling using +/-12mm thk gypboard having G.I. Framing as
per manufacture specifications. The rate shall include the cost of making
1 3,736.00 sft
cutouts for light fixtures necessary frame work to be provided for the
same. Extra frames to be provided
P & Fixing false ceiling using +/-12mm thk Calcium silicate Board having
G.I. Framing as per manufacture specifications. The rate shall include the
2 466.00 rft
cost of making cutouts for light fixtures necessary frame work to be
provided for the same. Extra frames to be provided (Inside Toilet)
Page 3
To,
Mr.
Providing & fixing light fixtures. (LED RESSESED standard quality range) 4,070.00 sft
P/F single leaf solid door made out of 35 mm thk. WOODEN DOOR FRAMES
IN 6"x 3" in old B.T.C. solid core flush door to be finished with approved
veneer on both sides with 4mmx4mm groves equally dividing the veneer
1 vertically in parts as per width of door. The hardware for the same would 14.00 nos
be: S.S. HINGES- / MORTICE LOCK-/ CONCEALED TYPE DOOR CLOSER &
STANDARD HANDLES -finished with melamine polish All complete as per
details and instructions by the Architects.
2 Main Entrance Door double swing as per above door specs. 1.00 nos
Overhead Storage Unit : P & Fixing Storage unit main structure made out of
Marine BWR ply with 3.2 mm backalite at carcase back, shelves of made
out of 3/4" ply & 1" ply shutters with Edge banding all around. Counter top
3.1 1 JOB
finished with Quartz stone. The insides & outer exposed surfaces finished in
Laminate. Shutters Below Counters with pull out trolly.P/F of Appliances
includes Hobs, Chimney, Rerigerator, R.o water purifier. (Kitchen Area)
P/F sliding doors Double leaf solid door made out of 35 mm thk. solid
core flush door to be finished with approved veneer on both sides with
4mmx4mm groves equally dividing the veneer vertically in parts as per
4 width of door. The hardware for the same would be: Heavy duty good 2.00 nos
quality hardware-finished with melamine polish All complete as per details
and instructions by the Architects. (Living room and Bedroom 2 Toilet) each
door leaf of (2'6"x8'0") X 4nos.
Wall panelling (Living room and Bedroom 2 WIW) Providing and fixing in
position of typical panelling as per details in drawings. Base frame shall be
5 of 2"x-1-1/2" section of Aluminum at 2'0" c/c (maximum) both ways & 12/19 594.00 sft
mm MR/BWR plywood. The job shall include all necessery hardware
fittings.
P/F Profile Shutters below counter of toilet wash basins with Back painted
7 4.00 Nos
glass, including all necessary hardware aand fittings.
Page 4
To,
Mr.
T.v.unit & wall Panelling, P/F wall panelling and cabinet with 18mm thk
MR plywood and visible surface finished with veneer of shade as per
11 5.00 Nos
architect, including all necessary hardware and fittings of heavy duty.
(Bedrooms 1, 2, 3, 4 & living room)
P/F Pelmet for windows with 18mm thk BWR plywood and visible surface
12 107.00 rft
finished with laminate of shade as per architect
Providing & Fixing curtain channels only, for ( sheer and blind), curtains not
13 138.00 rft
included.
TOTAL FOR CARPENTARY WORKS
F M S /Wood Work for Screen
1 P/F Screen as per architect selection and details. 288.00 sft
G PAINTING WORKS.
Housekeeping From Initial Stage till complition & Master cleaning job before hand
I 5,112.00 Sf
over the site. (BY PROFFESIONAL HOUSEKEEPING AGENCY)
LOOSE FURNITURE FOR Lobby, Study, Living room, Dining, Kitchen, Bedroom 1, 2,
J L.S
3, 4, Servant room.
SUBTOTAL
Add:-
Add:-
GROSS TOTAL AMOUNT
Page 5
To,
Mr.
Page 6
QUOTE
DATE
Rate Amount Remarks
9.00
165.00 -
165.00 -
ction and plastering) -
Page 7
QUOTE
DATE
Rate Amount Remarks
-
-
-
-
-
-
-
-
-
-
-
-
-
-
Page 8
QUOTE
DATE
Rate Amount Remarks
Page 9
QUOTE
DATE
Rate Amount Remarks
1,630,395.00
Page 10
QUOTE
DATE
Rate Amount Remarks
-
-
Page 11
QUOTE
DATE
Rate Amount Remarks
Page 12
SUMMARY
PROPOSAL B.O.Q FOR INTERIOR WORK WITH RATE FOR RESIDENCE AT 9H FLOOR PUNE 5112 SQFT
Area Calculation - Indoor carpet 4072 sqft + Outdoor front terrace 910 sqft + Dry Terrace 130 sqft = 5112 Sqft
To,
QUOTE 1
Mr.
PUNE Residence DATE 12/20/2017
S.NO. ITEM DESCRIPTION AMOUNT IN INR
E CARPENTARY WORKS -
G PAINTING WORKS. -
H HVAC Work -
I HOUSE KEEPING -
J LOOSE FURNITURE -