Jim Vaughan has developed many different types of PMOs over the past two decades. Each of these PMOs provided different services based on the organization that was being supported. A pmo should be responsible for all aspects of technical development.
Jim Vaughan has developed many different types of PMOs over the past two decades. Each of these PMOs provided different services based on the organization that was being supported. A pmo should be responsible for all aspects of technical development.
Copyright:
Attribution Non-Commercial (BY-NC)
Verfügbare Formate
Als DOC, PDF, TXT herunterladen oder online auf Scribd lesen
Jim Vaughan has developed many different types of PMOs over the past two decades. Each of these PMOs provided different services based on the organization that was being supported. A pmo should be responsible for all aspects of technical development.
Copyright:
Attribution Non-Commercial (BY-NC)
Verfügbare Formate
Als DOC, PDF, TXT herunterladen oder online auf Scribd lesen
Developing your Project (deployment) and problem support
Management Office (PMO) for the same software. In my role as
http://advice.cio.com/jim_vaughan/de project manager I was also the veloping_your_project_management technical face to the customer. You _office_pmo?page=0%2C1 might be wondering how I could call this a PMO. The first key element What should your PMO be doing for that made this a PMO was that we you? were the organization responsible for Posted by: Jim Vaughan in Best reporting to the customer on a Practices regular basis. This was for all software releases long before they Topic: Enterprise Management were in the hands of my Blog: The IT Project Management organization. We also managed Blog delivery and roll out plans for the software. The last piece that we Current Rating: Comments: 3 supported was the tracking and scheduling of problem fixes. The customer interface, release I have developed many different management and problem tracking PMOs over the past two decades. were the three areas that the larger These PMOs have supported organization required of us as a various different types of PMO and we performed those organizations at various levels of functions. maturity responsible for various different aspects of technical A few years later of was assigned to development. Each of these PMOs perform project management for a provided different services based on large software development project. the organization that was being This project utilized the services of supported. about 180 people. At this point in time we were at a much higher The first PMO that I developed was maturity level (SEI level 3) and we designed to support a software were actually using the words deployment group. The overall “project management.” I became organization was immature (SEI involved in this project shortly before level 1) and I was one of the few contract signing. We had been asked people that thought in terms of to provide a schedule to out general project management. I too was manager. Imagine that, us giving the immature, especially in the area of date to him! Our date was three project management. I was a mere months later than he wanted and as novice having recently discovered hard as we tried we could not see a PMI and the Project Management way to shorten the schedule. He Body of Knowledge (PMBOK). Using signed the contract with a deliver the PMBOK like a hammer I hit my date three months earlier than we thumbs many times. This thought we could deliver. Sound organization had two primary areas familiar? The difference with this one that it supported: software delivery is that the GM committed to take ownership of the difference in dates These were the primary services that and he did. With this very large and we in this very unique PMO. diverse group of development engineers my primary tasks where What I have found is that there is no managing deliverables and set formula for what is to be included communications. We were in a PMO. Each PMO must be constantly looking for a way to pull in designed to serve the need of the the schedule. Each month the GM organization. The ultimate objective would ask if we found a way. of the PMO is to ensure that the Ultimately we met our committed organization meets the requirements date much to the surprise of our of scope, time and cost. The savvy customer who expected us to deliver PMO leader will be able to determine much later. I attribute our success to what services the PMO needs to our high level of process maturity provide and can optimize the and our application of sound project organization around those services. management practices. For this particular PMO our primary PMI and PMBOK are registered responsibility was tracking deliveries, trademarks of the Project connecting the dots and keeping all Management Institute (www.pmi.org) the stakeholders informed along the way.
The last PMO I will discuss was for
an architecture team. The hardest part here was trying to determine the product deliverable. We determined that the deliverable was a technical description of this new product. We had pulled senior level technical people from all over the corporation to come together to design the “Next Generation Wireless Telecommunications System.” We intentionally avoided the word “cellular” as we did not want to limit our thinking. By the way, ne’er did we consider satellites ;-) With this diverse group of thinkers we quickly came to realize that the primary services that we needed to provide was to manage and organize design information. This had to be accomplished without stifling creativity. The next thing we had to provide was a forum for everyone to share these designs and thoughts.