SUMMARY SHEET
EOL FROM 2000 KW TO 4950 KW FOR M/S AFCO STEEL INDUSTRIES 21.5 KM SHEIH
Name of Work:
ROAD LAHORE
Job Order No: 2017-78-065
Work Order No: -
Location: -
1 2 3 4 5 6
Amount of Installed Overhead Charges Installation Charges Contract Transformr Reused Dismentled Mat
Material Approved BOQ 12% 8% Work Charges Charges
1244521 149343 99562 123580 0 0
7 8 (1+2+3+4+5+6+7-8)
Dismentled Material Consultancy Charges @ 0.40% of
Cost Of PC Poles Total Project Cost 90% of Consultan
Charges Total Project Cost
12782 0 1629787 6519 5867
____________________________________________________
Prepared / Checked by Site Engineer
Engineering and Management Advisory Services (EnMASSE)
eposit Works)
MATERIAL FOR COMPLETED WORK
ELR
DATA DARBAR
Ferozwala
-
11KV AFCO STEEL
Jan-18
Amount of
Installed
Material
0
0
0
0
0
0
313225
0
0
0
93093
0
11725
52980
0
717255
0
0
0
0
0
0
0
0
0
23048
0
2160
0
0
0
0
0
0
0
9612
336
9540
0
3535
0
0
0
0
0
0
0
0
0
eposit Works)
MATERIAL FOR COMPLETED WORK
Amount of
Installed
Material
1940
0
0
0
0
0
1273
77
0
0
0
0
0
2562
0
0
0
0
0
0
0
2160
0
0
0
0
0
0
0
0
0
0
0
0
1244521
Amount of Material
Dismentled
0
0
0
0
0
0
221100
4626
648
1098
8520
1572
810
300
350
7947
688
4806
3180
255645.00
eposit Works)
MATERIAL FOR COMPLETED WORK
Amount of Material
Dismentled
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0.00
0
Amount of Material
Dismentled
0
0
0
0
0
0
0
115000
0
0
0
0
4800
3780
123580
5867
FORM A-90
Budget & Account Officer,
Deposit Works
You are advised of completion of the following Capital Works / Deposit Works / Purchases.
EOL FROM 2000 KW TO 4950 KW FOR M/S AFCO STEEL INDUSTRIES 21.5 KM SHEIHUPUR
Name Of Work:
ROAD LAHORE
Job Order No. / Proposal No: -
Name of Operation Division: Ferozwala
Name Of Operation Sub Division: -
Name of Feeder: 11KV AFCO STEEL
Name Of Grid Station: 132 KV EMCO Grid
Location: -
Completion Month: Jan-18
Authorized Reference:
Description Item Quantity Length of Line
(Type of Conductor)
HT Line ACSR Ospery Conductor 3.465 Km R/C
ACSR Dog Conductor 0 Km
ACSR Rabbit Conductor 0 Km
Insulated Ospery 0 Km
Insulated Rabbit 0 Km
Structure/ PC Pole HT Line
HT Structure
1) 45' 05 No.
HT Structure
2) 36' 00 No.
HT Pole Spun
3) 45' 00 No.
HT Pole
4) 45' 00 No.
(Type of Conductor)
LT Line AAC Wasp Conductor 0 Km
AAC Ant Conductor 0 Km
Insulated Wasp 0 Km
Insulated Ant 0 Km
0 Km
Structure/ PC Pole HT Line
1) LT Structure 31' 00 No.
2) LT Spun Pole 31' 00 No.
Cables
Type of Cable 1) Km
2) Km
Transformer
1) 200 kVA 00 No.
2) 100 kVA 00 No.
3) 50 kVA 00 No.
4) 25 kVA 00 No.
5) 15 kVA 00 No.
6) 10 kVA 00 No.
Site Engineer
EnMasse Consultant
Certified that all the un-used material at the above work have been returned to store and there is no ground balance at the e
of completion of above work
Sub Divisional Officer:
Construction Sub Division ___________________
LESCO / WAPDA, Lahore
No further booking is required in any shape i.e., Labour, Material-Over Head FCC/Work
Executive Engineer
FIXED ASSET COST SHEET
(To be Filled by A/C Section)
Job Order No.:___________ A/C Head: _________ Completed On: _____________ Estimated Life:_____
Period Labour Material O/Head C/Work TOTAL
TOTAL
M A-90
CO STEEL
MCO Grid
Length of Line
Km
Km
Km
Km
Km
Km
Km
Km
Km
Km
Km
Km
ET COST SHEET
d by A/C Section)
Estimated Life:______
TOTAL
FORM-D
Name of the Company: LESCO
EOL FROM 2000 KW TO 4950 KW FOR M/S AFCO STEEL INDUSTRIES 21.5 KM
Name of Work: SHEIHUPURA ROAD LAHORE
Grid Station: 132 KV EMCO Grid 11kV Feeder: 11KV AFCO STEEL
OBSERVATIONS
1) Surplus and Dismantled Material as shown in Reconciliation Report may be retured to store and
MRN be Provided.
2) SR is not provided for the Material shown Short in Reconciliation Report.