Project Eagle

QUALITY MANAGEMENT Date: 22/11/2017


INSPECTION REPORT Revision: 00
FORM PEQC 001-17 IR Pages: 1 of 1

Project No.: CKN17156 Date: Report No.:


005PE2018
Package/Contract: #3 Evaps C/Steel Piping 22 Feb 2017
Rev 01
Location: Sappi Ngodwana/Arminco Workshop

Vendor: Arminco

Applicable Codes &


ASME B31.3, Sappi Specifications – Piping, Inspection and Testing
Standards:
Equipment Description: Carbon Steel Steam Piping

Equipment No.: 096-STD-G-0005


Visual
☐ Dimensional Inspection ☐ Fit-up Inspection ☐
Inspection
Inspection Activity: Material ID ☐ Surveillance Inspection ☒ Performance Test ☐

Other ☒ Specify other RADIOGRAPHIC NDT

Findings/Recommendations: Excessive Repairs


As per NDT reports and NDE Register for Radiographic Testing there are 5 from 68 welds that have been rejected.

Repair rate is up to 7%

Please send through written response on findings

Remainder of welders lot to be radiographed 100%

Proceed as per Code requirements for repair work and follow up NDE

Vendor Rep: Client Rep: Riaan Pretorius

Signature: Signature:
Date: Date: 22/02/2018
Note: This report does not relieve vendor of contractual obligation to supply equipment compliant to relevant codes, standards or
regulations.

1 Project Eagle Phase II


Sappi Ngowana
Quality Control Department