Course Code & Course Name: BEC 304 Steel and Timber Design
Assignment: Project Design
Assessment: 30%
Lecturer: Mohd Nizam Shakimon
Method of assignment: The assignment is a group work (min: 2 persons per group; max: 3 persons per
group). No group presentation.
Deadline: ONE DAY AFTER THIS FINAL EXAM PAPER
1.0 An Overview
The purpose of this design project is to develop the ability of the students to carry out a comprehensive
structural engineering design as practiced by the industry with minimal assistant. This project also will
develop the ability of the students to undertake problem identification and later they are assumed to be
able to formulate and find the solutions.
3.0 Task
Task Description Page
1. Introduction General information or background of the
project.
Brief the key elements of your project,
including a statement of the problem, the 2-3
aims and objectives of your project.
State the scope of work and limitations if
any.
2. Design Data. Design parameters.
Design Loads 2-3
Materials – Hot Rolled Steel sections
3. Structural Design Criteria Design procedure.
2-3
Design criteria to be considered.
4. Analysis & Design Analyse using ROBOT. No limit
Design using ROBOT and manual calculation.
Your manual calculation should consist of the
1
following:
Design of ONE steel beam.
Design of ONE steel column.
Design of beam-column connections
(details of connections – please refer to the
detailed Figure P4).
Design of steel bracing – suggest your
bracing layout.
Note:
o Cover page should state course code, course title, name of a group member and matrix number –
zero marks will be given for those whose names are not included in the project submission.
o Marks will be given based on the correctness of the calculation and the presentation of the project
paper.
o Any missing data may be assumed.
o Foundations need not to be designed.
2
The building is to be constructed on a site in IUKL, Bangi. The client’s requirements are as follows:
Steel material is used for structural elements: beams and columns.
The floor is lightweight aggregate precast concrete slabs of 150mm thick.
The roof is to be used for M&E equipment.
Fire resistance is 2 hours and the protection is achieved with a sprayed in tumescent
coating.
The site conditions are as follows:
Basic wind speed is 15m/s based on 3 sec gust.
Ground: Existing ground to 3m = made ground with rubble and clay.
Below 3m = stiff clay, SPT = 35N to 50N
No ground water.
List of Groups
No. Group X (m) Y (m)
Shaanjiv eiew 131010228
1 Mohamed noy ahmed 131910646 5 5
Mohamad asru b hj ramiy 141012312
Lubaba adil 132911438
2 5.25 5.25
kinly dorji 132911449
Abdishakur Mohamed Ali 113908289
3 5.5 5.5
Marwan Laswad
Mohammed Salah Eltayeb Mohammed 141912298
4 Margan Awad Margan 123910189 5.75 5.75
Abdulwakeel Adetun ji Adeeyo 133912130
Nur Rahman bin Karim 133011762
5 Mohamad Farid bin Toyib 133011535 6 6
Chong Jun Yu 133011951
Akram Hamid Nasser 121908665
6 Ebrahim Abdullah Saleh 131910285 6.25 6.25
Abdullah al-Khadher 122909476
Ahmed Mohamed Elamin 133911978
7 Zahraa Salman 121908776 6.5 6.5
Yanish rai gungah 141912575
Mohammad ejaaz 122909364
8 Muhammad Suhayl 122909367 6.75 6.75
Mohammad Mahdi 122909365
Gabriel Kong SIng Beng 141012274
9 Wong Chu Siong 141012276 7 7
Mohamed Abdulhamid Brwin 121908719
3
Khaled Saifeldin Sharief 114908293
10 Waleed Hussein Abdellah 123910064 7.25 7.25
Abdelrahman Ali Hamad 114908313
Afiq Affandi bin marzuki 133011574
11 7.5 7.5
4
Omer suliman omer omer omran 091904047
Abdullah mohammed hamed alsafi 121908993
Omar saeed awadh 121309795
28 Samoual mohamed 133912082 7 7
Adel hazaea 113908204
29 7.2 7.2
30 7.3 7.3
31 7.1 7.1
5
X X X X X
Y/2
Y/2
Y/2
Y/2
6
X X X X X
7
10. Assessment Strategy:
Report – will be evaluated based on instructions given in 3.0 above. Marks will be
given based on the correctness of the calculation and the presentation of the
project paper. Total mark for report is 100 marks.
Work done – peer evaluation will be used. Each member of the group will
evaluate him/herself and also other group members. Each member needs to fill up
Team Member Evaluation Form (see Form P-1) and submit attach to the report.
Total mark is 25.