1.0 An Overview
The purpose of this design project is to develop the ability of the students to carry out a comprehensive
structural engineering design as practiced by the industry with minimal assistant. This project also will
develop the ability of the students to undertake problem identification and later they are assumed to be
able to formulate and find the solutions.

2.0 You are required to:


o Analyse the Structural steel FRAME using ROBOT STRUCTURAL ANALYSIS
PROFESSIONAL 2016 BY AUTODESK ( free licence for students from Autodesk.com)
o Design the structural steel framework using ROBOT and manually.
o Write or type your answer neatly and clearly.
o Show all calculation and design procedures in calculation sheets.

3.0 Task
Task Description Page
1. Introduction  General information or background of the
project.
 Brief the key elements of your project,
including a statement of the problem, the 2-3
aims and objectives of your project.
 State the scope of work and limitations if
any.
2. Design Data.  Design parameters.
 Design Loads 2-3
 Materials – Hot Rolled Steel sections
3. Structural Design Criteria  Design procedure.
2-3
 Design criteria to be considered.
4. Analysis & Design Analyse using ROBOT. No limit
Design using ROBOT and manual calculation.
Your manual calculation should consist of the

1
following:
 Design of ONE steel beam.
 Design of ONE steel column.
 Design of beam-column connections
(details of connections – please refer to the
detailed Figure P4).
 Design of steel bracing – suggest your
bracing layout.

Compare your design with the results from


ROBOT. Make further discussion for any
differences.
5. Conclusion Summing up the members sizes, the
2-3
connections, etc. Use appropriate TABLE.
6. Detailing Detailing of the following – you extract the
results from ROBOT for the following:
 Layout of floor plan (include the size of
No Limit
beams, columns)
 Beam –column connections (choose any
two locations). Scale 1:20
7. Reference Any related sources. No Limit
Limit your
pages up
Report format: Font 10 (Arial) / Single Spacing
to 60
only.

Note:
o Cover page should state course code, course title, name of a group member and matrix number –
zero marks will be given for those whose names are not included in the project submission.
o Marks will be given based on the correctness of the calculation and the presentation of the project
paper.
o Any missing data may be assumed.
o Foundations need not to be designed.

4.0 Structure Description


This four-storey medical office building is shown Figure P.1. It has a structural steel framework (see
Figures P.2 and P.3). The floors and roofs are supported by open web steel beams and columns. The
floor slabs are lightweight aggregate precast concrete of 150mm in thickness and are able to provide
adequate resistance to lateral movement of the beams. The beam-column connection is designed to
have simple connections hence allowing a nominal amount of moments. See Figure P.4.

2
The building is to be constructed on a site in IUKL, Bangi. The client’s requirements are as follows:
 Steel material is used for structural elements: beams and columns.
 The floor is lightweight aggregate precast concrete slabs of 150mm thick.
 The roof is to be used for M&E equipment.
 Fire resistance is 2 hours and the protection is achieved with a sprayed in tumescent
coating.
The site conditions are as follows:
 Basic wind speed is 15m/s based on 3 sec gust.
 Ground: Existing ground to 3m = made ground with rubble and clay.
Below 3m = stiff clay, SPT = 35N to 50N

 No ground water.

 List of Groups
No. Group X (m) Y (m)
Shaanjiv eiew 131010228
1 Mohamed noy ahmed 131910646 5 5
Mohamad asru b hj ramiy 141012312
Lubaba adil 132911438
2 5.25 5.25
kinly dorji 132911449
Abdishakur Mohamed Ali 113908289
3 5.5 5.5
Marwan Laswad
Mohammed Salah Eltayeb Mohammed 141912298
4 Margan Awad Margan 123910189 5.75 5.75
Abdulwakeel Adetun ji Adeeyo 133912130
Nur Rahman bin Karim 133011762
5 Mohamad Farid bin Toyib 133011535 6 6
Chong Jun Yu 133011951
Akram Hamid Nasser 121908665
6 Ebrahim Abdullah Saleh 131910285 6.25 6.25
Abdullah al-Khadher 122909476
Ahmed Mohamed Elamin 133911978
7 Zahraa Salman 121908776 6.5 6.5
Yanish rai gungah 141912575
Mohammad ejaaz 122909364
8 Muhammad Suhayl 122909367 6.75 6.75
Mohammad Mahdi 122909365
Gabriel Kong SIng Beng 141012274
9 Wong Chu Siong 141012276 7 7
Mohamed Abdulhamid Brwin 121908719

3
Khaled Saifeldin Sharief 114908293
10 Waleed Hussein Abdellah 123910064 7.25 7.25
Abdelrahman Ali Hamad 114908313
Afiq Affandi bin marzuki 133011574
11 7.5 7.5

Muhamad arif nazrin bin abzila 133011919


12 muhamad arif sharir bin abzila 111007575 7.75 7.75
Abdul Rauf bin radzi 133011920
Ahmad Saleh Areebi Areebi 121908716 Abdulkariem
13 mohamed miftah elfatemi 123910042 Mohammed abdalla salih 8 8
123910084
Muhamad Syafiq Bin Zakaria 123010019
14 8.25 8.25
Umar Haqim Bin Nurlizan 133012021
Mohannad adam birima 122909540
15 Mirza sanower islam 122909055 8.5 8.5
Bashir ali alasfer 123910181
Adil abdirahman ibrahim 123910138
16 Marwan ali ahmed alnasi 123910053 8.75 8.75
Bareq Dakheel Ibrahim 133912017
Chua Kok Koon 133011800
17 Chong Ting An 132011059 9 9
Lee Yan Ting 131010592
Nor alia farhanah bt nordin 133011918
18 Hamizah bt mohd sharip 132011175 9.25 9.25
Ahmad mokhzani bin mohd tarmizi 133012000
Leki Pelzang 132911447
19 Buhaaldeen Mohammed 131910686 9.5 9.5
Ebrahim zaqzouq 132911038
Prashanth Kumar 132011316
20 9.75 9.75
Mukesh Ramalingam 132010734
Rame Rifaat Mahmood 133911715
21 Ali Raad ismael 133911741 4.5 4.5
Hussein hisham waheed 132911463
Wong Siew Ming 133011832
22 Tie Tzer Sheng 141012273 4.75 4.75
Helen Ung Hie Ping 141012277
Ameer Hakim Bin Sazali 133011960
23 Ahmad Farid Bin Abdul Rahman 142013160 4.25 4.25
Muhammad azfar bin shafudin 142012975
Algatrani Ali Abdalzahra 121908960
24 Mahdi Salah Mahdi 122909592 4 4
Muntadher Hussein noori 112907975
Ahmed Mustafa 122909615
25 Mohamed Osman 123909851 7.5 7.5
Ayman Masaad 133911698
Thilaganeshan 141012666
26 Lee Kim Loong 141012665 8.5 8.5
Nor'Izzati 141013664
27 Syed Abdullah bin Syed Mohsen Alhabshi 131010705 6.5 6.5

4
Omer suliman omer omer omran 091904047
Abdullah mohammed hamed alsafi 121908993
Omar saeed awadh 121309795
28 Samoual mohamed 133912082 7 7
Adel hazaea 113908204
29 7.2 7.2
30 7.3 7.3
31 7.1 7.1

5
X X X X X

Y/2

Y/2

Y/2

Y/2

6
X X X X X

Y/2 Y/2 Y Y Y Y/2 Y/2

7
10. Assessment Strategy:

 Report – will be evaluated based on instructions given in 3.0 above. Marks will be
given based on the correctness of the calculation and the presentation of the
project paper. Total mark for report is 100 marks.

 Digital presentation will be evaluated as follows:

Task Comments Point Achieved


1. Software  Types of software used
/5
(staadpro or prokon)
2. Presentation  Modelling of the
/10
structure
3. Run Analysis  Any errors? /3
 Any warnings? /2
 Can RUN? /5
Total = /10
Total marks = /25

 Work done – peer evaluation will be used. Each member of the group will
evaluate him/herself and also other group members. Each member needs to fill up
Team Member Evaluation Form (see Form P-1) and submit attach to the report.
Total mark is 25.

8
9

Das könnte Ihnen auch gefallen