A. General Description
A proposed medium-rise district hospital project.
Development without basement and Tower components only
The proposed hospital will be a Level 1 Primary Hospital that will be servicing the population of 100,000
(2016) of the 4th District of Quezon. The Project will be the primary referral facility for the residents of
Lopez, and will be handling general medical cases, Ob-Gyn, delivery service, and minor surgeries.
The 160 meters frontage of the lot faces the south. The Project site slopes upwards from the RROW
established grade (elevation +0.00) to a height of +10.00 meters at the rear of the lot. To the left of the
project site is a private walk-up apartment townhouse development. To its right is a food park
development and directly across the street is a 5-storey BPO office block.
D. Design Objectives
a. To design a district hospital that can maximize site utilization for the LGU through a good process
flow/ vertical spatial relationship and space planning efficiency; and
b. To design a building that shall be sustainably planned/ designed, delivered at the least cost and will
serve as a landmark facility for the District of Lopez, Quezon.
1. Based on the population of Lopez, what should be the target bed capacity of the hospital?
A. 100 beds C. 20 beds
B. 90 beds D. 200 beds
2. Given the project site’s orientation, from what will Habagat come from?
A. East C. Northeast
B. West D. Southwest
3. Given the project site’s orientation, from what will Amihan come from?
A. East C. Northeast
B. West D. Southwest
4. Based on the target bed capacity, what should be the projected GFA?
A. 3,600 C. 5,000
B. 2,400 D. 1,200
5. Based on the lot configuration and NBC Rules 7 & 8, what is the allowable TGFA for this project assuming
that a sprinkler system is provided?
A. 60% of TLA C. 65% of TLA
B. 50% of TLA D. 70% of TLA
2 E-DESIGN: HOSPITAL
7. What is the Maximum PSO based on occupancy assuming no firewall are used?
A. 50% of TLA C. 65% of TLA
B. 60% of TLA D. 55% of TLA
8. What is the required TOSL based on occupancy assuming no firewall are used?
A. 50% of TLA C. 30% of TLA
B. 20% of TLA D. 60% of TLA
9. Based on the lot configuration, what is the required setback for the frontage?
A. 1 meter C. 3 meters
B. 2 meters D. 5 meters
10. Based on the lot configuration, what is the required setback for the sides?
A. 1 meter C. 3 meters
B. 2 meters D. 5 meters
11. Based on the lot configuration, what is the required setback for the rear?
A. 1 meter C. 3 meters
B. 2 meters D. 5 meters
12. Based on the bed capacity, how many operating rooms should be allocated?
A. 2 operating rooms C. 10 operating rooms
B. 5 operating rooms D. 4 operating rooms
13. What should be the clear width of corridors for general areas based on Accessibility Law?
A. 1.50 meters C. 4.0 meters
B. 3.0 meters D. 2.0 meters
Based on the site orientation, where should the following departments be located:
16. Emergency Department:
A. Front of lot C. Rear of lot
B. Near the main entrance D. Near the parking areas
20. Mortuary:
A. Front of the lot C. Rear of lot
B. Near the main entrance D. Near the parking areas
25. Lobby:
A. Blue C. White
B. Green D. Orange