9. Spares @ 3% 0.71
2 5 10
9.2 Three directional PDH type OLTE Nos.
equipment with capacity of 8 Mbps in each
direction with 1+1 protection at optical level
and hot stand by power supply system,
Primary Multiplexer, Digital Cross Connect,
Digital Distribution Frame, Engineering
order wire Telephone.
1 10.5
6.2 Main Distribution Frame (MDF) with Krone Nos.
tag block & tool for 100 terminations of
Voice & Data Circuits. 5 0.03 0.15
6.3 Spares for OLTE equipment of 8 Mbps Nos.
capacity suitable accessories. 1 6.4
9.5 Network Management System comprising Nos.
of Personnal Computer (P IV, 2.8 + GHz,
120 GB HDD, 10/100 Mbps, ETH Card,
1.44 MB FDD with Serial Ports-4 Nos, USB
Ports-4 Nos, Optical Mouse, Optical
keyboard etc., Computer Table, Computer
Chair, Inkjet Printer and Software for
configuration. All necessary Software (OS,
Antivirus, Drivers, Printer etc.) with License
version shall be supplied in the form CD
also.
1 3.49
7 EPAXs (16 / 16) Nos. 2 2.00 4.00
8 EPB Telephones Nos. 25 0.02 0.50
9 48V / 50A Float Cum Boost Charger (1+1) Nos.
1 1.70 1.70
10 48V / 250AH SMF VRLA Battery set Nos. 1 1.50 1.50
11 1.5 ton Split AC Units along with Stabilizers Nos.
2 0.03 0.06
12 6 Pair Telephone Cable kMs. 0.5 0.50 0.25
13 1 Pair Telephone Cable kMs. 0.5 0.20 0.10
14 16 Sq.mm Battery Cable kMs. 0.5 1.30 0.65
A) Sub total 48.27
B) Excise Duty @ 14.42% 6.960
C) Sub total 55.23
D) CST @ 2% on C 1.10
E) Sub total 56.33
F) Errection and Commissioning @ 6% 3.38
GRAND TOTAL (Rs. In Lakhs) 59.71
trends.) or SAY Rs. 60.00 Lakhs
Note:
Sd/-
Chief Engineer / Telecom
COST DATA FOR ERECTION OF 132 KV DC/SC LINE (DATA FOR 1 KM)
9. Spares @ 3% 0.59
10. Surveys, Lands & rights, tree/crop LS LS 2.50 2.50
compensation, works to be executed
as per PTCC approval etc.
11. Erection charges LS LS 3.00 3.00
12. Work Contract Tax 0.12
SUB-TOTAL 25.83
Price escalation @ 10% 2.58
28.41
'file:///conversion/tmp/scratch/380392835.xls'#$2x50 MVA(rad)
COST DATA FOR ERECTION 132/33 kV SUBSTATION WITH 1 X 16 MVA POWER
TRANSFORMER (RADIAL)
14. 132 kV Feeder control & Relay Panels No. 1 5.40 5.40
240.83
22. 33 kV 5 MVAR Shunt Capacitor Banks Sets 0 9.89 0.00
Spares @ 3% 6.42
Transport & Insurance @ 4% 8.57
Erection charges @ 6% 12.85
382.17
Price escalation @ 10% 38.22
420.38
Contingencies @ 3% 12.61
433.00
Establishment & overhead
charges @ 10.75% 46.55
TOTAL 479.54
13. 33 kV Twin Feeder control & Relay Panels No. 2 1.37 2.74
14. 132 kV Feeder control & Relay Panels No. 2 5.40 10.80
179.10
22. 33 kV 5 MVAR Shunt Capacitor Banks Sets 0 9.89 0.00
Spares @ 3% 5.37
Transport & Insurance @ 4% 7.16
Erection charges @ 6% 10.75
315.88
Price escalation @10% 31.59
347.47
Contingencies @ 3% 10.42
357.90
Establishment & overhead
charges @ 10.75% 38.47
TOTAL 396.37
COST DATA FOR PLCC ON THE 132 kV LINE WITH NEW SUB-STATION (PER LINK)
Sl. Item Unit Quantity Rate Amount
No. (Rs.) (Rs.)
A. PLCC EQUIPMENT
1. PLCC TERMINAL (TWIN CHANNEL) Nos. 2 3.60 7.20
2. Protection Couplers
3. VFT
4.a) EPAX Nos. 1 3.20 3.20
3. EPB Phones Nos. 25 0.01 0.25
4. 48 V / 150 AH Battery Nos. 1 0.80 0.80
5. 48 V / 35 A Charger Nos. 1 1.10 1.10
6. Digital Multimeter Nos. 1 0.30 0.30
7. A/C Units 1.5 ton capacity Nos. 2 0.35 0.70
8. Wave Traps (630A/0.2 m H) Nos. 2 0.90 1.80
9. Copuling Units (P/P) Nos. 1 0.80 0.80
10. Co-axial cable Nos. 1 0.80 0.80
11. 6 Pair telephone cable KM 0.5 0.20 0.10
12. 1 Pair telephone cable with connectors KM 0.6 0.08 0.05
13. 16 Sq. mm battery cable KM 0.1 0.80 0.08
Spares for item 1-4 @ 3% 0.45
SUB-TOTAL (A) 17.63
B. VSAT EQUIPMENT
TDMA/FTDMA VSAT equipment with all accessories
1.
i. 1.2 M Antenna with IFL cable & Termination Nos. 1 0.15 0.15
ii. 2 Watt VSAT RF Terminal with LNA, SSPA and down Nos. 1 1.50 1.50
convertor and VSAT base band equipment with one
Ethernet port, two serial one 2 W voice port, cables
and connectors
10. Concreting of Pole, Stay sets & Base Concreting LS LS 15400 15400
11. Misc. items like coil earthing, pipe earthing, danger- LS LS 2500 2500
boards
Labour 22350
Transport 4090
Spares @ 3% 1.194
52.585
57.844
Contingencies @ 3% 1.735
59.579