FORM NO DESCRIPTION
A1 VISUAL INSPECTION
A2 GCP INTERNAL POWER DISTRIBUTION INSPECTION
A3 INITIAL START-UP FUNCTION TEST
A4 ALARM AND TRIP FUNCTION
A5 MANUAL SYNCHRONIZING OPERATION
ON
TION
ON
ION
TION
SPECTION
TION
CTION
ECTION
FORM A1 - VISUAL INSPECTION FOR GENERATOR CONTROL PANEL
A GENERAL INFORMATION
B NOTES:
Physical inspection to verify the design of the panel is meeting the specification as approved drawings and
specifications.
RESULT
C INSPECTION / TEST REMARK
YES NO
Documents required:
1 a) Generator control panel general arrangement drawing
b) AVR DECS250 redundant shematic drawing
Verify and ensure that GCP size and color code same as matterial
2
approval (MA)
Verify and ensure that all fabrication activities have been completed
3
as per GA drawing
Check and confirm that GCP nameplate/identification details are as
4
per approved technical drawings.
Verify and confirm the equipment in the GCP are tight & in
5
accordance to project specification.
Check equipment for mechanical damages (dents/scratches,
6
corrosion, broken handles etc.)
Inspect physical condition and arrangement of GCP PLC and its
7 subsequent PLC racks
Verify the cleanliness of panel internals and confirm all loose wires,
11 packing material etc. are removed.
2 Witnessed By
3 Certified By
FORM A2 - GCP INTERNAL POWER DISTRIBUTION
A GENERAL INFORMATION
Tag no. System / Sub System no.
2 Witnessed By
3 Certified By
FORM A3 - GCP INITIAL START UP FUNCTION TEST
A GENERAL INFORMATION
Tag no. System / Sub System no.
C INSPECTION/TEST
2 Witnessed By
3 Certified By
FORM A4 - ALARM & TRIP FUNCTION
A GENERAL INFORMATION
Tag no. System / Sub System no.
C INSPECTION/TEST
2 Witnessed By
3 Certified By
FORM A5 - MANUAL SYNCHRONIZING OPERATION
A GENERAL INFORMATION
Tag no. System / Sub System no.
C INSPECTION/TEST
2 Witnessed By
3 Certified By
FORM A6 - MANUAL SYNCHRONIZING OPERATION
A GENERAL INFORMATION
Tag no. System / Sub System no.
C INSPECTION/TEST
2 Witnessed By
3 Certified By
FORM AXX - REDUNDANT EXCITATION MODULE CONTROL & OPERATION
A GENERAL INFORMATION
Tag no. System / Sub System no.
C INSPECTION/TEST
2 Witnessed By
3 Certified By
RATION
Test Result
st 1
st 2
st 1
st 2
MARK
FORM AXX - REDUNDANT EXCITATION MODULE CONTROL & OPERATION
A GENERAL INFORMATION
Tag no. System / Sub System no.
C INSPECTION/TEST
2 Witnessed By
3 Certified By
TROL & OPERATION
Test Result
Test 1
Test 2
Test 3:
REMARK
FORM AXX - GENERATOR AUTO OPERATION - AUTO MAINS FAILURE (AMF)
A GENERAL INFORMATION
Tag no. System / Sub System no.
C INSPECTION/TEST
2 Witnessed By
3 Certified By
AINS FAILURE (AMF)
Test Result
Sequence 1
Sequence 2
Sequence 3
Sequence 4
REMARK
A GENERAL INFORMATION
Tag no. System / Sub System no.
C INSPECTION/TEST
CB Gen status:
Closed
CB Main Status:
Open
D COMMENT(S) AND ADDITIONAL INFORMATION
2 Witnessed By
3 Certified By
mer supply is recovered. The generator will
ng the gen incomer breaker once both gen
nto cooldown period for 10 minutes before
Test Result
Sequence 1
Sequence 2
Sequence 3
REMARK