Sie sind auf Seite 1von 19
utp teem ZXUR 9000 UMTS Radio Network Controller Hardware Installation Guide Ze Coe Safty Precautions ~ Conventions Installation Flow ~ Installation Preparations Unpacking and Inspection Cobinet Insalstion Removing the Front Door and Rest Door Positioning and Instaling Expansion Bots ~ Installing the Adjustable Bases Fixing a Cabinet ~ Performing an Insulation Test ~ Connecting the Antstate Wis Strap ~ Insaling Cable Drums ~ Installing ide Door Instaling the Front Dear and Rear Door ~ Combining Adjacent Cabinets ~ Installing Reinforcing Assembly (Optional ~ Instaling 2 Service Subrack ~ rounding a Cabinet Instaling Power Cables Tasting Grounding Cables Installing Clock Cables Installing Service Cables ~ Installing Other Cables Cable Layout Requirements ~ Requirements for Laying Power Cables, (Optical Fiber, and Outdoor Cables Board Inetalltion ~ Power-On and Power.Oft i : [ P i ; : i Ze “Sea SECO ‘The oowing desebes the personal het) and sft infornaton that you need to know bore Ung ZTE sytem produc To prevent scion reed the sy Invrmatondscibed this mansl cael Uelore sing ZTE system procs 1 Ioalrpultonsoveide the forston in th manual Wher applicable oc ‘algcnonel te ope 21 em ordi mu hav the noe of ty Seceptappropste tecnica ainings and ae quale for te operons et $e pets thm te cal Wags ans dy FE coo ain inde potently hzadus station Faure to cma fa resin sere ary egumentcamage, of Ierpton of ‘auton ates potently hazardous sation Folie orp fn resulta moderate nary egupmentdanage,ointerption nor seco. Soo iit SEX ‘= Checking the Environment To tacitate heat | [iamempeenee T Sspnon abies : ‘te ananged in rw a i “ome T i ‘en atthe power supply fects for the ate ae ready wit “rough terms ana capaci le or the engreting Ear shell Ss two pos of temas Fors aint tl comigu'tonsk poss often af requted The cet eke fhe power ‘Strout cabinet forthe 2XUR 3600 UMTS at be 09 ‘he maximum power consamotons of te ZUR S000 UMTS ae oto W for ane al 000 W fort shea S300 W for “The coating capacy of he ar condition sytem te easpment room must be'2 tres ofthe power consumption ote XUR See vas ‘Verify tthe grounding ais a hese ave Seen sted al gasses the grounding et {nd DOF are nse, and he heres to bese for the invalston meres i : t i i ; : i ‘Tools and Meters nl ANG) OG ea) rrr rte - etter celery cw hanna rapt sey glove ay bela eo A aS Bee ece es SSNS X ‘Saget par» cite le an nate wit ser oe. Steps: 2 The engening apc csr cheb Hod uty nd ‘ert he ote pang cone ave the out pling tthe noon cs, 2 Remove the pking on Sheets y wing a ch harer les, sagt sre e ‘rs and» ona Open hs tap cover scearance wth the Ronge ow i : t Saga] SARE Tata Cut be pacing Sap ying sagorl per Sere ethe sons pe slong th eps of he cover Moke se otto ct dep sien | wns 1 Wy tate bar quany te sme ttt inthe abel, nd ae out “hebesee win thr pacage QWADSA S| SS Tew | fie [rnewreneh| saison [RES ore sow ei 4 Count and check th products an store them propery Rtn he Ungscking scp ear ard by repre anh oper OE Sah 4a) nan eel a i il id cat copa ig 3 4 Ze 5. Remove the outer pacing of te caton, The accessors egure forthe nsalion ae conect nd complet, "salon sor marks compte an chan Therese eamage or ditorton whee grounding copper sip ae inal. The Thefaloingunecetaboar sad behets, ‘ert te popaty hake on he bow thou eae mito. The board ID aed veron ets te packing It The vendor Shou ace he jr tesprabhy of hace sesive fe and components The spetes rods shoul be propery Phe bye. mo Cabinet C > [nate de Installation a Soa Tae + T oH sulin aie stn | eal aie doe et) SRM Steps SEX emave ne grounding cable yetow Green betwen the lover par he door and te rack EB 2 at xe dors pin dom to separate ‘he pin tam the upper hinge hal in the door se oan}, and pull the Dot out of the hinge hole nthe lower part ofthe door ee Steps osetermine the hoe postions forthe exparaon bolts ith a 2 ‘ita te di stock of percussion dil or an electric hammer fim © Measure the lvl ofthe ajustable base with level ue. The level ‘with both Rand and pest downwards vertical to il four holes ness tolerance of single ace or that betanen two adjacent Bases ‘re1z5 wih » depth of 110 moat the mark the gre $hould be not more than 1mm the levenessdevation is above 3 the olerance, put he asin washers Dewees the stead Install expansion bos M12 90 Bierance eceaeleereti teeertieees st ened ‘round toast the level Tiere dacs neue ortho stage SEE dvaton re-postion and dilthe holes by Ize the guide ib onthe expansion ntinto the guide slot on Eee ee ee elect ental ee ten eer the enpansion tube and pu the expansion bot assem vertically evaton is above te tolerance, pt the agustng washers between inte the hole Hammer the expansion bol ssembly with rubber hammer tnt the expansion tube i fully inserted int the hole, € Remove the expansion bolt sping ‘washer it washer and insulating sic =e 3 Moreh eatin! othe pate ofthe gro bats or adhatbl SE ee eee eee ae re ae ees Fic the cabinet withthe ft washes, spring washers, and bolts (M12 ‘he eabinet ang the expansion boson the ground ta auc he lve. ‘ote This stp sppcabl ony forthe cabinet rectly iste onthe {round The ee he asa sealed measure forthe Domes ainnteen ste Plce Insulting washers atthe postions ofthe four expansion bot L oosenthe sic right locking bos theo M2 « 3) of the aus w 35) ata torque of 75 Nm {able base and adr the movable bracket upwaras and downwards aeaeanl bsced onthe height ofthe antistatic floor, 2 Lace ve moat racks the fe Brackets with the eight fcing bolts an fasten the bolts at a torque of 75 Nm with a torque wrench B rice insulating washers atthe 4 Purthe prepared adustable poston ofthe expansion bolt age a th postions othe expansion bo hoe. fe twa ing acing Pt washers on the expansion bots in tum ( an fhe aural base to the ground 2 torque of75 Nm Adjcing Waa All the clock cables are routed from the left to the right cable pathways and ed ful fom the cabinet bottom tothe antistatic Noor BITS reference clock cable routing Conmacedo the REF RE Connactedo Be acne ‘ern ace inputsertce | Bir and thant a's Grtesindoy tems. | aptemacoaps sinter-Shelf Clock Cable Specifeations of intrshlf clock cables any £3 ‘installation locaton and cabling direction of inter-shef clock cable The cables ae installed at the back ofthe cabinet 20 a cigs ‘Required tools Diagonal pliers and cable te. ‘The following contents introduce the fve service cable categories inthe ‘respects of specfiations, structure, instalation location eabing diection and cabling diagram. ‘*Media Plane Fiber/Cable » The ZXUR 9000 UMTS has tree sevice subracks (one master shel and two slave Shelves in full configuration. Cabling dlagram af ntershelf clock cables (using the EGFS boards as an example) Routing ofthe intershel clock cables ee ese pine sandy edi Shichng bed | plane thing boa Ecisrrtsinal | Eorgexesival be therm shek_| aster she elves ine pn seting be Swtchng dowd | Ecrspextsivof be Ecfyenrsinat | show ew ‘Connected othe | Comeced whe PPA Simitary, the active/stand= Piotdoceimout | deccinputimerace | by CLK interfaces af the Inertice onthe | ante tansy mesa | n'ster shelf are connected sandy mean, | plane swing Beas] (9 the actve/stondy PTPL Bowasars) | sect interfaces and the active/ Exo tes standby 91P2 interfaces of Se slave shelf 2 respectively ‘Ne tt sot can SE Specifications of Media Plane Fibers/Cables “Precautions = = Before instaling service cables, ensure that the networking solutions determined and appropriated data transmission model selected. 21 22 Taranto mda [An media plane fibers a multi-mode fiber in appearance. Ends A an 8 ae C/PC plugs. An medi plane cable is high-speed cable In sppearan Ends Wand 8 ate QSFP# plugs. ‘Media pane optical fiver connection ina three-shlf cabinet 23 #Control Plane network Cable Specifications of Control Plane Cables ‘an contol plane cable is super category-5 shielded network abl. Ends ‘Nand Bare RU4S connectors. Control plane optical fiver connection in tree-shelf eabinet using ESBS boards a an example slnterface Fiber 24 Ze Specifications of interface fibers. Inatce on EoPaPoPa24y S/nayentos seas [an interfoc fiber i single mode ber. End Ais a LE/PC pug, sinterface Network Cable Specifestions of intrface network cables, S12 6rbaies CPS itera (capaza /capazasi Aninterface nework cables super asus testegory slelded network cable End Ais an 8j45 connector Cabling of interface network cables (Using EGBS boares 35 an example) ‘interface E1/T1 Cable Specifeations of interface E/T cables 25 rs ohms Beatle came, vamsae "an oina| 322, eto | 7252" on Sian 380 cas oreotyeotzs Cabling ofinerace E/T cables sing ota bows san en. [| installing Other Cables Required tools Diagonal pliers and cable tes ‘The following contents introduce two cable categories in the respects of specications, structure installation lotion, cabling dvection and The cable installed atthe back ofthe cabinet, "End Ais connected tothe ETH-MPI or ETH-MP2 interface onthe contol plane suitching board EG35/EGBS2 of the master shelf End Bis onmectd fo the externa switch (ot belonging to ZXUR $000 UMTS} 26 i : [ P i ; : i owe oeing Ea a ee — “Universal Cabling Requirements = a able bing ereents ‘te bigtime it 2s. tora art cal ‘*485 Monitoring Cable ‘raps rom the oot Dont a ae) Speciation ofthe PDAES abl tov a a = lll... ‘Tess beten Wo able (ioaabes testes ‘Necabe bende donee = ‘ithe um ofeabiebunle Ud the cable esto ved breaking the cable oes at ‘theta beau of se tle ‘tle bint shuld be bow at ey wing racer to the bac Instllion location and ebling direction ofthe PDAES cable quirements for Laying Power Cables, Optical Fiber, 1. No ie¥-ype POEs cable pte 21 : 28 1 DAUR 3000 UMTS cabinet dope wo canna power sp ‘Rmurbe conned wth wa chanel of Be poet Far fll canintion Kisco wth ate Be Fee be cbling mode 1 Wren ying he power cals slong he vertical cabling bea, rte ht» able lp used at vey spacing 3100 mer. 1 Ven power able and grounding eles connected othe Power tupay wing trate the cblag cape sal be nad 1 Frater stig the poner ables and ground ees hold sthemaste connector or welding point ot tld for cle 1 Keep aistance of 100mm Between OC power cables nd sg bls they re bs oral ss Ris tee to bind he bes ed the eral pty ery Soom Bune mith foe sdnese pes tec astibuion pont 1 Keep a maunum margin of 25m between the shee andthe Ae sper 1 Ur protective sees onthe er pita eae the Fer Boy ‘raid ove the nc or between ck and fer pga estoy Bonet by eb on the ier, Do not cance brs tn he sap edge ofthe bine 1 Prevent th fie tom bung damaged. The sca gop Bese {ecole and macho pats tbe ester Ban Om ‘eres ne quran athe ce 1 there are fen fers and en ling the bes wth gn {bles poet the fer wih wing pe Use comune pipes ‘wre ny aves cabinet to prevent fers rom beng Te Sen ly Ske cen a opal ern Sina css nt you xt 29 shen he power cals an sgl abla rowed sae hey | ‘must rote bound gate: Enougn paces neces s Wotersroot nd omtainoan measures re reutes 1 Thecabletouphhoks shold be seed ccm reparations for Board Installation, + Insal blank panels the idle slots inthe subrack.f the slot where 3 boatd is tobe installed has been occupied by lank pane, remove the blank panel stand then instal the board im the slot. eis recommend- feo install hoard immeshately after removing a blank panel. "When instaling or removing a board, do not touch the PCB andthe devices other than jumpers and DIP switches Before insaling» Doar, make sure that the settings of the DIP atch is spproprate » Wear an antistatic wrist strap, The antistatic writ stip must be connected tothe grounding jack nsde the ebinet. Ensure that the antistatic wrist tps in good contact wth your sk. Check whether the pins in the backplane are bent shor, or broken, and whether the jacks ina backplane or board are deformed, I yes, replace the backplane or board immediate ‘Installing a Board An antistatic wis strap and antsatic dothes mast be worn, tate out oe board trom the antistatic packing bag CEP Net venting abo lh on ae nt uch he boas {Snponers ant ines et bod PC sida conc ere he ‘Sapte ees Theat sap ean oy reve sage ‘Sced by tedeccyenhunan ooo vou sage bye sae ‘Say nto es wer sae dete 30 Z7e WRI) een 2 vt be bertspra ot youre ng sol bebop “panna ih yourngnt hand Hove th sg ce on tos Ff fpannerinthedrecion ofthe Cd i={ ‘arrow, and turn the spanner - eee ne complet Repeat the eps an Sete sere FI 2 ecm a Pine Sa Push the board smoothly into 4 push the board panel unit ‘Powering On the Devices, ‘hese alan the sate ue cing the sls pael Pes rail until the board panels ‘down the upper spanner and Prerequisite Postoning pin contacts the he" lower spanner of the The power sith forthe ZXUR 5000 UMTS power dstibton ubrack Feniioning leinthesbe beard tarts th pal to Tapani mabe make the beard be nseted_ = Al'powe sup of the per dst subrack ae suitched ot Mi the hel compete pee E | L remove atte boards out of theirs. Com rm ‘ Poem ETS = the Be PDU to ZXUR 3000 UMTS power ditibutonsubrack within } the ange 57 OC 0-40 4 q B ontne 0c POU, tum onthe power switch fr the power distibution J yt subrack Ue a muimeter to measure and very tat power input at {he power dull subractewhintherange-37V Beto OV i : i i 3 i i Ensure thatthe spans buckle the shelf Use the sceweriver to be. Clockwise fasten captive screws on the panel fix the board. Aiur on ne PUI sie suiteh on the power dstbutionsubrack Ensure ‘sRemoving a Board ‘that the PWR IN indieator is Anantstatic wrist strap and antistatic dlothes mast be worn Insert the EGBS/EG8S2a board inta slots 19 and 20 ofthe master service sbrack screws on the upper/lower board extractr 2 the primary serie subrace Observe the LED indiestore on the ESBS Move the sliding block an the upper/ower spanner inthe direction of PEGRS2a board, Ensure that the ECM is noxmal status, The CEM ‘the aw, and tir the two spanners outwards to pall out the boar, [ACT indeator on the active board is ON in green. The CMM ACT 31 32 Ze Indstoron the tnd bots OFF, the CMM H/Sndctor OFF {he cha HOST instr fishes a1 Hn green 7 veity at et fon fa its snd one ef it of he maeer Service subrack operate prope, Normal the RUN instr fishes Stein green, andthe 1/5 and ALM incetors are OFF. any ‘ceptions foun, mmeetately shutoff he power sp remove {he ul and then epet the power-on step. {Options Repest steps S07 to check the dave service subrac Ensue tht all bosrds ar inserted propel nd ile slots are installed with blank panels 0 sser a devices operate one hous check te alse andthe environ: ‘ent temperature Ifthe alarm Indcating high temperature at he i reulation inlet is generated or the envitonment temperature i Figher than 28°C perform the fllowing step to dear the alm or Cecreace the emperstre ‘Reduce the temperature a the air outlet ofthe sir conaoner ©, Choose precise ventibtion to increase the cooing sr volume for the area. « Ensure that the venison route isnt obstructed by cable, abn tayo other ates, ‘Powering Off the Devices steps L tum ot the -48 v power switch corresponding to the sevice subrack ‘onthe panel ofthe power dsvibaton suorack. Turn off the ~48 V power supply output to the cabinet on the DC power distribution cabinet. 33 i : t i i ; : i 34

Das könnte Ihnen auch gefallen