1 SCOPE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2
2 CODES, STANDARDS AND PRACTICES . . . . . . . . . . . . . . . . . . . . . 2
3 DEFINITIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2
4 SELECTION AND SPECIFICATION . . . . . . . . . . . . . . . . . . . . . . . . . . . 2
4.1 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2
4.2 Principles of Selection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
4.3 Units of Measurement . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
4.4 Selection of Ranges . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
4.5 General Design Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
4.6 Pressure Gauges Connected to Process . . . . . . . . . . . . . . . . . . . . . . . . . . . 4
4.7 Pressure Transmitters and Transducers . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4
4.8 Pressure Gauges – Pneumatic Receiver Type . . . . . . . . . . . . . . . . . . . . . . 4
4.9 Pressure Controllers/Recorders – Field Mounted . . . . . . . . . . . . . . . . . . . . 4
4.10 Pressure Controllers/Recorders – Panel Mounted . . . . . . . . . . . . . . . . . . . 5
4.11 Pressure Switches . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
5 MODIFICATIONS, ADDITIONS AND DELETIONS (EXCEPTIONS) OF
API 551 SECTION 4 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
5.1 Scope . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
5.2 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
5.3 Pressure Gauges and Switches . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6
5.4 Pressure Transmitters . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6
5.5 Section 6 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6
6 PDVSA SPECIFICATION FORMS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6
7 QUALITY ASSURANCE/QUALITY CONTROL . . . . . . . . . . . . . . . . . 7
ENGINEERING SPECIFICATION PDVSA K–301
PDVSA
REVISION DATE
1 SCOPE
This section covers PDVSA requirements for the design, specification, installation
and commissioning of pressure instrumentation. Guidelines of specification
K–300 shall also be applicable.
API–551 sections 4 and 6 have been accepted by PDVSA as its own standard for
pressure device installation, with the amendments indicated in this document.
The requirements of this specification are modifications, additions and/or
deletions (exceptions) to API 551 “Process Measurement Instrumentation”
sections 4 and 6. The section, paragraph, item, table and figure numbers and the
associated headings used in this specification correspond to the ones used in API
551, First edition, May. 1993. Since this specification does not take exception to
all the requirements in API 551 SECTIONS 4 AND 6, the
section/paragraph/item/table/figure numbers in this specification may not be
sequential. It’s clearly understood that section, paragraph, items, tables or figures
of API 551 sections 4 and 6 not mentioned in this specification have been adopted
without changes.
3 DEFINITIONS
All definitions are listed in the appendix of PDVSA standard K–300.
PDVSA
REVISION DATE
2. Select the manufacturers and types of instruments from the “List of Selected
Instrument Vendors” as prepared by PDVSA representative.
3. Select the accuracy and range of the instrument to suit the process
requirements.
PDVSA
REVISION DATE
b. Instrument air supply and transmission connections shall be 1/4” N.P.T. The
electrical connection shall be 1/2” N.P.T.F.
c. Pressure indicating pointers shall be adjustable with a micrometer type
screw.
d. Panel mounted pressure gauges, indicating or recording instrument and
controller shall be flush or wall mounted.
e. Blind pressure controllers shall not be used.
f. Pressure gauges connected to process shall have a blow out disc in the
back.
PDVSA
REVISION DATE
4.11.2 The switches shall be micro type rated for 1 amp at 24 volts D.C. All other ratings
shall be subject to PDVSA approval.
4.11.3 The switch differential (fixed or adjustable) shall comply with all necessary
process operating conditions.
4.11.4 The switches shall be double pole double throw (D.P.D.T.) type with three wires
connected to three terminals in order to select either a normally open (N.0.) or
normally closed (N.C.) action.
5.2 General
Numeral 4.2.4: Local Indication
Delete: “locally mounted pressure controls” in the first paragraph.
ENGINEERING SPECIFICATION PDVSA K–301
PDVSA
REVISION DATE
5.5 Section 6
Numeral 6.1: Scope
Addition: Any technique selected for protecting instruments from adverse
process and ambient environments shall be agreed with PDVSA.
ENGINEERING SPECIFICATION PDVSA K–301