CONTRACTORS’/HOMEOWNERS’ INFORMATION SHEET


1.22.10
Completed construction work must be inspected and approved tors scheduling inspections of their own work. All subcon-
at various stages, not to exceed 60 days between inspections, tractors shall have the proper license issued by the Building
or as approved by your inspector. The Permit and the Inspec- Inspection Division (BID). Unlicensed subcontractors are not
tion Record Card, containing the names of the homeowner, allowed. Corrections required must be completed, reinspect-
and all licensed subcontractors, shall be posted at the site at ed, and signed-off by the inspector involved.
all times, and visible from the street. The city-approved plans (114) - Bulk Plane Inspection - Zoning
must be on the site, and available to the inspectors at all times. (105) - Exterior Sheathing Inspection - Nail inspection
The general procedure for order of inspections is as follows: (112) - Basement Structural Floor Inspection – Partial frame
inspection performed before installing floor deck or sheathing.
1. Pre-Construction Inspection – (113) Used for Large Com- (111)- Exterior Paper/ Exterior Lath – Inspection of exterior
mercial Projects or Shoring Permits. weather-resistive barrier (building paper, etc, as required by
section 1402.1 & 1402.2) before installation of exterior finishes
2. Footing Inspection - (100) - Conducted just prior to pouring such as siding, brick or any stucco. Metal and wire is inspect-
concrete footings. The footing excavation, formwork, and any ed at the same time prior to the installation of stucco.
reinforcing steel, must be complete and in place. Any clay soil
pipe encountered must be replaced, by a licensed plumber, 5. Frame Inspection - (112) - Conducted when frame construc-
to schedule 40 PVC, ABS/DWV piping, or cast iron, under tion is completed, following sign-off of all rough inspections.
separate permit (#4 Plumbing), and approved by the plumbing Roof and wall sheathing must be complete with at least roofing
inspector prior to footing inspection. Any pipe replaced more felt and roof jacks installed. Doors & Windows must be in-
that 2’ from the new foundation must also be permitted and stalled, and all framing must be exposed; baffles should be in
inspected by Wastewater Management Division. Caisson foun- place, also. (Air infiltration Barrier Method # A, foam and caulk,
dations require the submittal of a field report, by the engineer is inspected with frame.)
of record, to the Department, in lieu of inspection.
6. 2nd Story Attachment Inspection - (112) - Partial frame
3. Foundation Inspections - Conducted on foundation walls at inspection for 2nd story additions only. Have all connectors
four stages: that attach the 2nd story to the existing building in place. Floor
(101) - Formwork and reinforcing steel, prior to placement framing shall be in place without floor sheathing installed. All
of concrete. rough subfloor utilities must be installed and passed inspection
(115) - Setback Inspection before requesting a ‘Partial Frame Inspection’.
(103) - Finished walls, with damproofing applied, when required.
(104) - Exterior foundation wall insulation, when required. 7. Insulation/Moisture Vapor Retarding Inspection – Moisture
(102) - Perimeter drain, when installed. Backfilling follows vapor retarder is installed – Batt insulation (106), or blown-in
completion of these inspections. insulation (200) -- in place, following frame inspection.

4. Rough Inspections - When shell or alteration framing 8. Drywall Inspection - (107) - Drywall installations prior to
is completed, with utilities installed, rough inspections are jointing or taping work.
required of: Zoning, Electrical, Plumbing, Mechanical System
Piping, Ductwork, and Vents for Gas Fired Equipment or Metal
Fireplaces. Each requires a separate permit, with subcontrac-
www.denvergov.org/residentialpermits
201 W. Colfax Ave., Dept. 205
Denver, CO 80202
phone: 720.865.2710 fax: 720.865.3020
Denver Advisory No. 315 Contractors’/Homeowners’ Information Sheet

9. Final Sub Inspection - Final inspections of roofing, gut- z The inspection code number listed below must
ters, electrical, plumbing, mechanical, heating, ductwork, etc. match the permit type (#1-R thru #12) in order to
(rough and final sign-offs required on each sub permit) are request an inspection.
required prior to final construction inspection. z Subcontractor permits (#2 thru #12 permits) must
be issued and the job site card must be posted
10. Final Construction Inspection - (108) - Job is completed, before requesting an inspection for work that is
including shingling, siding, gutters, downspouts, splashblocks, performed under a subcontractor permit.
steps, handrails, etc. Energy compliance certificate that shows
a pass rating of “83” by a recognized energy rating program 2. Enter the permit number and inspection type code
when a builder signed the “Energy Rating Program Agree- by using the buttons of your telephone. Remember
ment”. Painting and carpeting do not require inspection. to press the pound key (#) after each set of numbers
entered. NOTE: You can call for two or more inspec-
If intervals between inspections exceed 60 days, the inspector tions with a single phone call, provided the work to be
must be contacted for an extension. Inspectors are available inspected is ready for inspection. Press the asterisk
daily by phone, between 7:30 a.m. to 8:30 a.m. key (*) between inspections with different permit
numbers. If all of the information you enter is
SEE THE LIST OF PHONE NUMBERS BELOW. correct, you will be given a verification number
and the inspection date at the end of your call.
NOTE: The numbers, in parenthesizes (XXX), are the inspec- Please stay on the line until you get that number.
tion code number required when setting up your inspections
for work allowed under the 1R or 1C permit. Information may TYPE OF INSPECTION FOR WORK PERFORMED
also be found on back of the green paper copy of each permit. UNDER #1-R OR #1-C PERMIT:
Footing....................... (100) Frost Wall Insulation..............(104)
AUTOMATED INSPECTION REQUEST SYSTEM Final........................... (108) Setback................................(115)
CALL 720-865-2501 Frame........................ (112) Other.....................................(109)
1. The Automated Inspection Request System is de Foundation Wall......... (101) Bulk Plane.............................(114)
signed to dispatch inspection requests for the next Ext. Lath Stucco........ (111) Batt Insulation.......................(106)
working day. It will be available 24 hours daily. To Blown Insulation........(200) Waterproofing.......................(103)
request an inspection the next business day call Drywall.................................................................................(107)
before 12:00 a.m. (Midnight). Occasionally an in Foundation Perimeter Drain.................................................(102)
spection will be scheduled for a later date due to
workload problems. ***WARNING: REINSPECTION FEES MAY BE CHARGED IF
WORK IS NOT READY, OR IF ENTRY CANNOT BE MADE.
z When you request an inspection, you must know
the permit number. This is the number printed
on the bottom of your permit beginning with
the year. For example, 92123456 would be the
permit number which must be entered from your
touch-tone telephone pad when requested by
the system.

z You will need to know the three-digit code for the


type of inspection you want. This can be seen in
the following “Inspections Type Directory”.

LEGAL DISCLAIMER: This Advisory should not be used as a substitute for codes and regulations. The applicant is responsible for
compliance with all code and rule requirements, whether or not described in this Advisory.
Denver Advisory No. 315 Contractors’/Homeowners’ Information Sheet

BUILDING INSPECTION DIVISION - SECTIONS LIST PHONE NUMBERS


Cashier - Payments for Reinspection/2nd Half of Double Fee.......................................................................................... 720-865-2780
Contractor’s Licenses & Certificates................................................................................................................................ 720-865-2770
Inspection Section (Inspection Administrator)................................................................................................................. 720-865-2500
Boiler/Refrigeration................................................................................................................................................. 720-865-2550
Construction........................................................................................................................................................... 720-865-2520
Electrical................................................................................................................................................................. 720-865-2580
Elevator...................................................................................................................................................................720-865-2610
Mechanical............................................................................................................................................................. 720-865-2560
Plumbing................................................................................................................................................................ 720-865-2620
Public Safety.......................................................................................................................................................... 720-865-2630
Roofing, Gutters, Insulation, Fences...................................................................................................................... 720-865-2540
Zoning (Neighborhood Inspection Services)......................................................................................................... 720-865-3200
Commercial - Phone hours are 8 to 11:30 a.m./Walk-thru hours are 7:30 to 11:30 a.m......................................... 720-865-2705
Residential - Single Family and Duplex, Hours: 7:30 a.m. to 4:00 p.m....................................................................720-865-2710
Records - Building Permit Files........................................................................................................................................ 720-865-2790

INSPECTION CODE DIRECTORY


CONSTRUCTION: Permits 1R & 1C PLUMBING: Permit 4 ELECTRICAL: Permits 3, 3A, 3B
Pre Construction Meeting .................. 113 Groundwork........................................ 400 Slab.................................................... 300
(for Large Commercial or Rough................................................. 401 Underground...................................... 301
Shoring permits) Pressure Test...................................... 403 Partial Rough...................................... 302
Water Service..................................... 404 Full Rough.......................................... 303
Footing................................................ 100 Final.................................................... 402 Partial Final......................................... 304
Foundation Wall.................................. 101 Full Final............................................. 305
Setback Inspection............................. 115 BOILER/REFRIGERATION: Fire Alarm........................................... 306
Permits 7, 8, 9, 11, 12 Service Equipment............................. 307
Foundation Perimeter Drain................ 102
Groundwork........................................ 700 Ceiling................................................ 308
Waterproofing..................................... 103 Pressure Test...................................... 701 Walls................................................... 309
Frost Wall Insulation............................ 104 Partial Rough...................................... 702 Card Access....................................... 310
Rough................................................. 703 Temporary Service............................. 311
Exterior Sheathing.............................. 105
Final.................................................... 704 UFER (ground rod)............................. 312
Bulk Plane........................................... 114
Batt Insulation..................................... 106 GENERAL CONSTRUCTION: Permit 2 ELEVATORS: Permit 6
Drywall................................................ 107 Blown Insulation................................. 200 Safety Test.......................................... 600
Roof.................................................... 201 Buffer Test.......................................... 601
Final.................................................... 108 Gutter................................................. 202 Pressure Test...................................... 602
Other.................................................. 109 Siding................................................. 203 Temporary Operation......................... 603
Exterior Lath....................................... 111 Fence.................................................. 204 Final.................................................... 604

Frame................................................. 112 PRE-INSPECTION COMMERCIAL FIRE PROTECTION: Permit 10


Blown Insulation................................. 200 Flat Roof............................................. 205 Underground...................................... 410
Other.................................................. 206 Rough................................................. 411
DEMOLITION: Permit 1D Final.................................................... 412
MECHANICAL: Permits 9, 11, 12
Final.................................................... 110 Groundwork........................................ 900
Pressure Test...................................... 901
Partial Rough...................................... 902
SIGNS: Permit 5
Rough................................................. 903
Rough................................................. 500 Final.................................................... 904
Final.................................................... 501

LEGAL DISCLAIMER: This Advisory should not be used as a substitute for codes and regulations. The applicant is responsible for
compliance with all code and rule requirements, whether or not described in this Advisory.