No Man-hour and Loss Time Injury ( LTI ) ** Total No. Cases Note
1. No. of workers 178 -
2. Total Man-hours works 39,872 -
3. No. of LTI cases - -
4. No. of LTI days - -
5. No. of no LTI ( minor injury ) - -
6. No. of near-miss Incident - -
7. No. of dangerous occurrences - -
8. No. of occupational disease / poisoning - -
Please refer calculation of LTI in safety statistic**
2. Minor Nil
( < 4 days MC )
3. Serious Nil
( > 4 days MC )
4. Fatal Nil
Page 1 of 4
4. Fire and Rescue Department Nil
(Fire Service Act 1988 )
5. Local Authority and Other
Regulatory bodies ( Uniform
Building By Laws ( UBBL ) Nil
1984 ),
( Street, Drainage and
Building Act 1974 ), ( Food
Act 1983 )
Please refer Attachment compliances of OSHA**
Page 2 of 4
3.2 Process / Procedure / Practices
Page 3 of 4
Section 6.0 Construction Machinery at Site
Machinery, plant, equipment, appliances or PPE required to minimized the risk ( Reg. 19 ( 2 ) sub
clause e )
No. Type machine Unit No. PMT/JPJ Expiry date
Reg.
1. Backhoe
2. Excavator
3. Forklift 1
4. Damper
5. Genset
6. Metal Cutting machine
7. Bent steel machine
8. Crawler Crane
9. Boring Rig (Hydraulic)
10 Air Compressor
Type of Plant Unit No. PMA Expiry date PMA
No. Type of PPE Equipment Unit No. PMA Expiry date PMA
NIL
Page 4 of 4