Sie sind auf Seite 1von 6

RAMATHAL SHELVAN ( 11860 )

ID 11860 ALLIMOOPAN CO

SL NO DESCRIPTION NO L B D CF QUANTITY

1 Super structure work by Solid block in CM 1:6 of size 35x20x15cm


Total wall 1 31.5 0.2 2.8 17.64
deduction
Door 5 0.900 0.200 2.000 1.8
Window 4 1.000 0.200 1.200 0.96
window 2 1 1.000 0.200 1.000 0.2
lintel 1 31.500 0.200 0.150 0.945
3.905
TOTAL QUANTITY 17.64
TOTAL DEDUCTED QUANTITY 3.905
NET TOTAL QUANTITY (cum) 13.735

Materials required
Solid block 1300 nos
cement 17 bags
sand 3.7 cum

Providing and laying in position cement concrete of specified grade excluding the cost of centering and sh
1 work upto plinth level 1: 4: 8 ( 1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal si
Verandah 1 2.250 1.050 0.075 0.177
Hall 1 2.100 2.750 0.075 0.433
R1 1 2.100 1.950 0.075 . 0.307
R2 1 2.200 3.000 0.075 0.495
Kitchen 1 2.200 2.950 0.075 0.487
TOTAL QUANTITY 1.899
TOTAL DEDUCTED QUANTITY 0.000
NET TOTAL QUANTITY (cum) 1.899

Reinforced cement concrete work in beams , columns , roofs etc... Including the cost of centering , shutter
2 and reinforcement , with 1: 1.5 : 3 (1 cement : 1.5 coarse sand ( zone 3) : 3 graded stone aggregate 20 mm
For roof 1 5.4 7 0.1 3.780
for lintel 1 31.5 0.2 0.15 0.945
sunshade 1 26.4 0.6 0.075 1.188
TOTAL QUANTITY 5.913
TOTAL DEDUCTED QUANTITY 0.000
NET TOTAL QUANTITY (cum) 5.913

Materials required
cement 45 bags
fine sand 2.6 cum
coarse aggregate 5.2 cum
steel 8mm 520 kg

3 12 mm cement plastering finished with floating coat of neat cement of mix 1: 3 ( 1 cement : 3 fine
Verandah 1 2.250 1.050 2.363
Hall 1 2.100 2.750 5.775
R1 1 2.100 1.950 4.095
R2 1 2.200 3.000 6.600
Kitchen 1 2.200 2.950 6.490
TOTAL QUANTITY 25.323
TOTAL DEDUCTED QUANTITY 0.000
NET TOTAL QUANTITY (sqm) 25.323

Materials required
cement 4 bags
fine sand 0.45 cum

4 12mm cement plaster of mix 1:4 (1 cement : 4 fine sand )


Verandah 1 7.400 2.800 20.720
Hall 1 10.500 2.800 29.400
R1 1 8.900 2.800 24.920
R2 1 11.200 2.800 31.360
Kitchen 1 11.100 2.800 31.080
Outer plastering 1 24.000 3.500 84.000
Sunshade 1 24.000 1.300 31.200
DEDUCTION
Door 5 0.900 2.000 9.000
Window 4 1.000 1.200 4.800
window 2 1 1.000 1.000 1.000
Wall 1 3.700 2.000 7.400
TOTAL QUANTITY 252.680
TOTAL DEDUCTED QUANTITY 22.200
NET TOTAL QUANTITY (sqm) 230.480

Materials required
cement 29 bags
fine sand 3.75 cum

5 Providing wood work in frames of doors , windows


Doors 5 5.520 0.100 0.070 0.193
Window 1 4 4.600 0.100 0.070 0.129
Window 2 1 5.000 0.100 0.070 0.035
TOTAL QUANTITY 0.357
TOTAL DEDUCTED QUANTITY 0.000
NET TOTAL QUANTITY (cum) 0.357

6 Providing and fixing panels for doors and window


Doors 2 0.9 2.000 3.600
Window 1 4 1.000 1.200 4.800
Window 2 1 1.000 1.500 1.500
TOTAL QUANTITY 9.900
TOTAL DEDUCTED QUANTITY 0.000
NET TOTAL QUANTITY 9.900

7 Plumbing works LS

8 Electrical works LS

9 Toilet work

10 LS for unforseen items if any


860 )

ALLIMOOPAN COLONY, THEKKADI

RATE AMOUNT

ize 35x20x15cm

g the cost of centering and shuttering - All


stone aggregate 40 nominal size )

the cost of centering , shuttering , finishing


aded stone aggregate 20 mm nominal size.
f mix 1: 3 ( 1 cement : 3 fine sand)

4 fine sand )
s

windows

window

Das könnte Ihnen auch gefallen