Sie sind auf Seite 1von 4
580 pe? Appendix B-XT Improvement Proposals for Culverts A, New Bow/ Slab Culverts Existing Design |_Details of Proposed Structure Ne Road Chainage | caainage amy | 9PEOF ] Span Arrangement (am) Culverts | (m) 1] Mangalivar Realignment | ~0500 254520 | Box 153.0x3.0 (422 | Mangatwar Realignment | 0.500 | 24920 Box 133.083.0 3_| Mangalwar Realignment | 1509 |v7"255.520 Box 133.033.0, B. Bow Slab Culverts to be Widened si. Existin Design No. Road Chainage(n)| Chainage tm) i NAI6 211,700 216) 2215,170 2 NH76 = Miss He.206,700__ | 220.170 43 NIT 76 = Ming of 5819.90 226.970 4} NH 76 195.950 234 24 230.920 5 NH6 = 195,200 233 [031231.670. be NH 76 — Mit call dz 184.8002¢3 [58 249.070, 1x3.1x2.7 cea NHI6 183.500, 243.370 1x3.0x3.8 tbs NH 76 178.200 98 [20% 248.670 1x30x13 a) NH 76- Wwe, 4heba76,800 250.070 1x2.5x13 10 NH 76~ Wises afl cba169.287 257.268 TxS.1x10) it NH 76 —Naoivg of 5il2167.800 258.755 1X22%17 | pa NH 76 [166.789 234 %G2 259.766 Tx 44x23 B _NHI6 165.700 26) 236 260.855 1x3.5%19) id NH 76 ~ hice a 165.513 261.042 1x5.0%28 15 NH 76~ ding allt 165,250 261.305 Tx40x19 | 6 NH76 164.760 6, [261.798 Tx4.0x3.0 1 NH 76 164.567. 264183 261.988 Tx5.0x30 |, NH 76 = Wyipallide 163,100 23] 263.455 - 2x13x12 NH76 162.980 2631168 263.575 1x1.3x20 NH 76-Ti pal $160,100 266.455 1x6.0%20 NH 76=Misnep | 157.500 "| 269.055 Tx40¥2.6 NH 76- tig | _157.250 269.305 1x5.2x31 NH 76 — Mineg | 137.100 269.455 1x29x12 | NH 76 156.820 2296 30 269.735 Tx3.1x19 NH 156.653 244 fags 269.902 1x60x31 | NH 16 2 [135.24 2] amas) Ix3.1x 12 NIT76 5.043 21il6om 271,513 Ix3dxid | N76” [266272170 "152.5302 73[ 146.274.0025 ¥51.330215[321 275.225 151.251 21400 3 - XHAVISIX TANING OF CINTTORT (6 FROM DESIGN CHAINAGERM 214 570 XB 308.370 IN THE STATE OF Ri DON DRFOTTTOL) MODE UNDER NUDE THA V (PACKAGE ~ it) 5B) ails of Proposed Structure Road Chainnge dam "ype of [Span Area Culverts im NH 76 Marecg | 148.400 278.155 Slab Tx1.6x09 | ___NH76 147.366 279.189 © | Slab Ixisxis | N76 147.081 27947471 Slab Txi 5x15 NH76 146.123, 280.432 7 [Box | 1x1 3xt5 NH 76 144.767 281.788 22) [B67Slab Ixatx1g N76 143.025 283.530 28314 16Slab 1x4.0x4d NA76 142.290 284.265 264|249 Slab Tx4.0x 4. N76 141.130 285.495 285) 055Iab 1x3.0x 41 N76 140337 286.218 284aRASlab 1xd5x 4] NEI6 139.744 286.811 280 ag5 Slab Tx1 5x14 N76 139.436 287.119 287] \@58iab 13.0% 1.1 NH76 - Pipe al 137.200 289.355 ‘Slab 1x3.0x16 NH 76 136.804 289.751 384 |B26Slab 1x3.0x2.1 NH76 135.961, 290.594 240 [ob Slab Tx42x29 | NH76 ~ Mafog| 135.200 291.355 Sle 1x4.0%3.9 NH 76 134.821 291.734 241 [B12Slab 1x13 x10 NH 76 134.114 ae441 CT Slab TxS4x45 NH 76 133.936 292.619 7) Slab 1x40%3.0 ss NHI6 133.721 292.834 7 | Slab TxESx15 54 NH76 133.090 293.465 2 | Slab xlsx 1.5 35 NH76 130.206 296349 7 | Box 1x3.025 456 NH76— 130.050 | 296.305. Slab Ux23N 11 P37 NI76 “129.970 296.5857 | Slab Tx15x15 “SB N76 129.609 | 296.926 7 | Stab 1x2.9x08 | 39 NHIG 128.380 298.1757 | Slab 1x3.0.x25 oO NH 125.797 300.758 7 | Slab 1x3.0x25 61 NH76 325.775, 300.780 7 Slab |" 1x3.0x25° @ | NH 76 125.642 300913 2 | “Slab 1x LOx id Ee NH 76 125.50: 301.048 7 | Slab Ixtixlg | * 4 NH76 125.383 301.172 2 | Slab | 1x3.0x25 6 NHT6 | 120.983 301.887 Z | Box 1x2.2x 16 [6 | N96 | iatos | ans fae TxLOx2i or NHI | aa ers 302.682? | Box Tx33N13 se NH 76 122.361 304.1947 [Slab | 1x22x16 o NH76 = 122.126 304129 | Stab 133x133 | a) NU76 = MunZ4 321.900 | 304.655 Stab | 1x3.0x1.0 7 _NH76~ Wining 119.800 | 306.755 —1x2.9x2.0 C. Slab Calverts to he Reconstructed ‘ Details of Propased Structure si Existing ign - No. Road Cranage Cn) | Change (kay | fue of [Sean Arrangement {710 218.770 ‘Slab Tx2.5x 12 (38"Slab | —Txl.ex Fo peeSIab 2 NHAISIN LANING KM 30.370 IN THE STA V (PACKAGE uh 18 @ a . Details of Proposed Strusture si. Existing Design e No. ional Chainage kay} Chainage (any | E3ve oF Sean Arrasase of 178.800, 248.070 7 Slab Ix21x13 176.950 249.920 JiA|%e0 Stab Ix25xi3 168.772 257.783 25 7/482Slab 1x50x21 166.236 260.319 260/5)5Siab txI2x1s 164.367 262.188 242|353Slab 1x3.5x22 156.240 270.315 270} Slab 1x6.0x23 135.710 [770.8457] — siab 156.0%23 152.908 273.647223 |o53 Slab Ix 46x15 152.200 | ~~274355 77a); 20 Sab Tx2.1x09 351.613 274.942 9 el4goSlab Ix21x2.1 150.959 275.5967 | Slab 1x21 2d 14.100 278455 Shab] Tx 0010 147.827 278.7287] Shab | 1x20x 18 141.600 284.955 Slab 1x2 x14 140,708 285.847 295/420 Slab 1x3.0x 11 140.549 -| 286.006 28 pel Slab 153.0%23 139.479 287,076 287|ioaSwb | 1x39 135,400 | 291.155 ‘Slab. I1x4.0x2.1 | 132.1007 |. 294435 Slab 1x25x13 | 126978 299.577 -T | Shab TxS.0x17 125,200 303.355, _ Slab [1x22 16 121.602 304.9537 | Shab 133.830 10 |305.455-7| slab} te wn 141.4 [286.155 1x3.0x3 Ruse iia 285.255 | ~ixaoxa0 (291.965. 41x20x15 292.062 [1x20x48 | “2046 [ix25x15 | NH 76— Niortnd 294.755 1x20x2 we | 200.768 ix20x48 —_NH76 = Nia 200.185 Ax 3.0x36 “N76 A= as pa D. Pipe —T Sh Evicting ‘Chainage (kim) NUAVSIN LANNE Or Riv 308.370 IN THE Sta VirAckacs mh AN) ON DBTO OGroMDEaON CHAT TOLL) MOD 58@ —-————_ as _ an sh. Existing Design sot Proposed Struety Road of | Span Arrangement No. | |Chsinage (km) | Chainage Gm | 2>PeoF | Spa “oe 4 NH 175.800 251,070 351 [70Box 1x2.0x20 Zs _NH76 175.750 251.120 25} |o¢0Box 1x2.0x20 6 NH 76 ~My ol 222175.700 251.170 Box 1x2.0x2.0 7 NH 76— bused [id 175.300 251.570 Box 1x2.0x20 | 8 NH 76= Mi al B175.100 251.770, Box 1x20x26 9 NH 76- Musa} 53174.800 252.070 Box 1x2.0x20 E._ Pipe Culverts to be Widened Details of Proposed Structure Des Span Be [Ft extn cba] meet Ta th culverts ei fa NHS 195, 100_23|-13)233.770 Pipa 3x12 2 NH76 186,700 241}-414240.170 Txiz yes Ns | 80.6002 | ba8 270 Pipe 3x12 cea NH 76 - Hurigal 31 60:305 266.250 Pipe 2x12 _| 5 NH76 = Mikel, 135.800 290.755 Pipe Txi2 (6 NH76~ Murvidy 135.700 290,855. Pipe 1x12 7 ‘NHT6 134.310 T [292.245 Pipe [1c ea A763 851992 570 Pipe Ixia 9 NH 76 = Mag 133.100 ¢ | 293.455 Pipe Tis 10 “NH76 132.940 293.615 Pipe Txi2 | — np” : OF CHITTORGARI KM 308.370 iN THE SEATE OF kasagn Vv wackAGE mn on HN Oran oes ena ‘Mj ON DAFOTTOLL) MODE UN ST DER NUDP Piast B30

Das könnte Ihnen auch gefallen