Beruflich Dokumente
Kultur Dokumente
Krunal Gajjar
Mobile: +91 9408667277;
E-Mail: krunal_gajjar82@yahoo.co.in
PROFESSIONAL ABRIDGEMENT
EDUCATION
PROFESSIONAL CERTIFICATION
CAREER CONTOUR
KEY ACCOUNTABILITIES:
Welding Operations
Monitoring of welding activities as per WPS, & Quality System Procedure and
witnessing Welder Qualification Test for welders, conducting inspection of fit up and
performing weld visual inspection as per code specification.
Ensuring quality control of welding procedures, including consumables, parameters,
purge control, preheating and inter pass temperature control, etc.
Inspecting different types of welding process, SMAW, GTAW, SAW, FCAW , welding
procedure qualification as per ASME Code Sec. IX, API 1104, AWS D1.1 , IS 7310.
Welder performance qualification as per ASME Sec IX , API 1104, AWS D1.1, IS 7307.
Quality Assurance
Monitoring adherence to quality systems, ensuring compliance with quality standards
and maintaining requisite documents.
Implementing quality systems, HSE systems, company rules & regulation in the
organization to reduce rejections & ensure zero defect products.
Ensuring compliance with company’s ISO quality procedures, coordinating internal
audit requests and facilitating audit procedures of the other departments.
`
Title: Barmer-Pali pipeline project ,180K.M 18” Dia. Pipeline and station
piping work. Client: GSPL India Gasnet Ltd (GIGL).
Contractor: L&T hydrocarbon Engineering Ltd. P.M.C: Tractebel Engineering Pvt. Ltd.
Title: Rochling Connectivity Project - Hot tapping work in 8”line and 04” DIA. Pipeline and
Station Piping work.
Client: GSPL
Contractor: Garcem Engineers.
Title: Dabhan Thasra Pipeline Project. / 12” DIA. Pipeline (45 K.m) and Station
Piping work. Client: GSPL
Title: AVPL (Ankleshwar). / 18” DIA. Pipeline (36 K.m) and Station Piping
work. Client: GSPL PMC: Tractebel Engineering Pvt. Ltd
Title: Laying of Natural Gas Pipelines for City Gas Distribution Project
Title: Bhagyam Trunk Pipeline Project / 24km * 24km (parallel) 30” DIA foam coated
Crude pipeline and piping work.
Client: Cairn Energy.
Contractor: Punjlloyd Ltd.
Title: Inspection of Goliath (650T) and ELL (40T) crane. (10,000 Structure fabrication work).
Client: Pipavav Shipyard.
Title: IOCL Viramgam spur line project /2km 10”DIA Crude pipeline, piping and structure
fabrication work.
Client: Cairn Energy.
Contractor: L&T.
Title: Salaya Bhogat Pipeline Project. (Bhogat) / 6km* 6km ( parallel) 30” DIA Crude
pipeline & piping work into the sea and structure fabrication work.
Client: Cairn Energy.
Contractor: Leighton.
`
Title: Integrity Oil and Gas Pipeline project. / 60 km 14” DIA, 12” DIA and 8” do oil and gas
pipeline , station piping and structure fabrication work for flare line.
Client: ONGC.
Contractor: ACE Pipeline.
Title: Ahmadabad City Gas Pipeline project. / Different DIA CNG Gas pipeline for CNG
Station and domestic purpose.
Client: Adani.
Contractor: Aneri Construction.
Client: Adani.
Contractor: Aneri Construction.
Title: Dhabole Panvel Pipeline Project (PH-2). / 5o km. 30” DIA gas pipeline and Station
piping work
Client: GAIL.
Contractor: Punjlloyd Ltd.
Consultant: Engineers India Ltd.
At Punjlloyd Ltd.
Title: Dhabole Panvel Pipeline Project (PH-01) /60km. 30” DIA gas pipeline and
station piping. Client: GAIL
Title: Dahej Uran Pipeline Project. / 58km 30” DIA gas pipeline and Station
piping work. Client: GAIL
Consultant: Tractebel Engineering (p) Ltd.
`
Title: Koyali Dahej Pipeline Project. / 103 km 14” DIA oil pipeline and Station
piping work. Client: Indian Oil Corporation Ltd.
Consultant: Mecone.
Title: Ahmadabad City pipeline Project. / 8”DIA pipeline work.
Client: AMC
PERSONAL DETAILS
Yours Sincerely
Krunal Gajjar