Sie sind auf Seite 1von 2

PATAGONIA GOLD TIPO CAMBIO $ 565.

76
Jan-04 (23/01/2004)
Dec-03 Jan-04
Fecha 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Mts Perf. Factor Mts a US$ Bono Mt Bonos a pagar
Producción diaria 38 24 54 60 72 48 0 78 48 66 78 52 18 0 24 87 133 16 0 Hrs/Ext Pagar por Mt US$ Metro
Manuel Friz S. A A A A A A A A A A A A A A A A A A A 896 0.5 448.0 0.50 224.0 126,730
4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 76
Juan Jara F. D D D D D D D D A A A A A A A A A A A 522 0.5 261.0 0.50 130.5 73,832
4 4 4 4 4 4 4 4 4 4 4 44
José Velásquez C. A A A A A A D A A A A A A D A A A A A 896 0.3 268.8 0.25 67.2 38,019
4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 68
Mario Caba F. A A A A A A D A A A A A A D A A A A A 896 0.3 268.8 0.25 67.2 38,019
4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 68
Armando Rivera V. A A A A A A D A A A A A A D A A A A A 896 0.3 268.8 0.25 67.2 38,019
4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 68
Carlos Soza A A A A A A A A A A A A A A A A A A A 896 1 896.0 0.20 179.2 101,384
0

SUPERVISOR DE PROYECTO SUPERVISOR DE PROYECTO


NOMBRE FIRMA
Bonos a pagar
Terreno Noche

30,400 0 19 0
0
17,600 0 11 0
0
27,200 0 17 0
0
27,200 0 17 0
0
27,200 0 17 0
0
0 0 0 0

Das könnte Ihnen auch gefallen