Sie sind auf Seite 1von 17

Malik MIJ Chunxing Resources Recycling Co

PLOT # 50 PHASE-1A
M3 INDUSTRIAL
Quantity CITY FAISALABAD
As per
Construc-
Item No. Description of Items Unit
tion
drawings
SECTION-5 FLOORINGS / WALL FINISHES
5.2 Ceramic Tile and Porcelain Tile Work
Provided and lay glazed ceramic tileson walls over plaster
and 600mm x 300mm best quality imported tiles or
approved equivalent, color will be selected from samples at
the time of construction, as per Specifications, and as per
AD-02 sample approved by the Engineer. M2 -

Provided and lay glazed ceramic tiles over floor and 800mm
x 800mm best quality imported tiles or approved equivalent,
color will be selected from samples at the time of
construction, as per Specifications, and as per sample
AD-03 approved by the Engineer. M2

TOTAL:Amount
ng Resources Recycling Co. Ltd,
OT # 50 PHASE-1A
TRIAL CITY FAISALABAD
Total Rate As per Claim
Accumulative Total Claim Claim for
Claim till Contract Amount
Quantity till IPC 09 till IPC 09 IPC 09
last IPC Agreement (Rs)

1150.00 1,150.00 1,150.00 1,150.00 3000.00 3,450,000.00

335.00 335.00 335.00 335.00 3000.00 1,005,000.00

-
-
-
- - - 4,455,000
Claim Justification

as per approval of chairman

as per approval of chairman


Malik MIJ Chunxing Resources Recycling Co
PLOT # 50 PHASE-1A
M3 INDUSTRIAL
Quantity CITY FAISALABAD
As per
Construc-
Item No. Description of Items Unit
tion
drawings
SECTION-9 WOOD WORKS
9.1 Carpentry And Joinery Works
Provide and fix 38mm thick commercial ASH WOOD solid
core batten board flush door shutter with 16 SWG M.S.
pressed moulded mild steel sheet frame including 10mm x
38mm D.W. wedging; and 50mm x 19mm x 10mm thick
9.1.1 deodar wood architraves on both sides, 3 Nos. approved
hinges per shutter, 3 Nos. M.S. hold-fasts for door frame on
either side embedded in P.C.C. (1:2:4), including termite
proofing, painted 3 coats enamel paint finished, all rough
and finished hardware complete in all respects as per
drawings and Specifications, excluding door locks and door
Type
closers, as per WD1 (1050mm
sample approved xby2100mm)
the Engineer; all wood
work being well-seasoned knot-free, matching grains and Nos
treated anti-termite:
a)
b) Type WD2 (900mm x 2100mm) Nos
c) Type WD3 (900mm x 2100mm) Nos
d) Type WD4 (750mm x 2100mm) Nos
TOTAL:Amount
ng Resources Recycling Co. Ltd,
OT # 50 PHASE-1A
TRIAL CITY FAISALABAD
Total Rate As per Claim
Accumulative Total Claim Claim for
Claim till Contract Amount
Quantity till IPC 09 till IPC 09 IPC 09
last IPC Agreement (Rs)

7380.00 211,584.60
28.67
5.67 12100.00 68,607.00
1.89 12100.00 22,869.00
7.89 15800.00 124,662.00
- - - 427,723
Claim Justification

Because of good
quality ash wood
doors
Malik MIJ Chunxing Resources Recycling Co. Ltd,
PLOT # 50 PHASE-1A
M3 INDUSTRIAL CITY FAISALABAD
Main Plant Builing
Excess Work Claims
for IPC 09
16-09-2017 to 31-10-2017
A B C=B-A D

Quantity
As per Accumulative Total
Item Total Claim
Description of Items Unit Construc-tion Quantity till Claim till
No. till IPC 09
drawings IPC 09 last IPC

SECTION-17 SPECIAL ITEMS

17.1 Miscellaneous Special Items


17.1.4 Provide and lay selected granular material bedding of footings
comprising 70% crushed stone and 30% sand compacted upto
98% Modification Proctor Dry Density (M.P.D.) complete in all
respect as shown in drawing and as additionally directed by the
Engineer.
a) 98% compaction under Footings / Brick
Foundations & under floor

M3 8680 9,794.40 1,114.40 660.00


SECTION-2 CONCRETE WORKS
2.4 Structural Concrete

Provide and lay structural cement concrete of 3000 psi cylinder


crushing strength at 28 days using O.P.Cement, Chenab sand
and Sargodha crush stone including formwork and its removal,
2.4.1
placing,compacting, finishing and curing complete in all respects
(including screening and washing of stone aggregate) but
excluding the cost of reinforcement as per Specifications

a) Pile Caps/Footings (Loading Bay) M3 3,125 3,332.26 207.26 169.00

c) R.C.C. Bracing Beams M3 55 62.90 7.90 2.00

SECTION-3 MASONRY
Toa walls 450mm Thick in loading way M3 - 39.45 39.45 39.45

3.1.1
AD-40

2.4.1 R.C. C Retainig Wall in loading bay M3 - 71.79 71.79 71.79


AD-41

AD-31 Re-compaction of floor for concrete M2 - 1008 1008 1008

Additional work of labor for vibrating, cleaning, compaction and Lum Sump
etc.

TOTAL:Amount
d,

E=C-D F Z=F X E

Claim for
Rate As per Claim Claim Justification
IPC 09
Contract
Agreement

Amount
(Rs)

454.40 3,200.00 1,454,080


38.26 12,000.00 459,120

5.90 11,800.00 69,620

39.45 8600 339,270

71.79

13,000

933,270.00
1008.00
538.00
542,304.00

1,000,000.00
4,797,664
Malik MIJ Chunxing Resources Recycling C
PLOT # 50 PHASE-1A
M3 INDUSTRIAL CITY FAISALABAD
External Sewerage Syste
for IPC 08
30.6.2017 to 15.9.2017
Quantity
As per Accumulative
Item No. Description of Items Unit Construc- Quantity till IPC
tion 08
drawings

SECTION W-2 WATER SUPPLY PIPE LINES

W1.4
PN16 conforming to DIN STANDARD of 8074 / 8075
and ps 3580 made by "Dadex" or approved equivalent
for water supply lines with specials and fittings
according to SDR-17 including cutting, jointing and
testing as per Manufacturer's Specifications, supported
on walls or run in chases or under floors including pipe - -
hangers, supports, making requisite number of holes
where
required and making good the holes and chases,
complete.

a) 200mm RM - 6.00
b) 75mm RM - 8.60
c) 125mm RM - 744.00
TOTAL:Amount
esources Recycling Co. Ltd,
50 PHASE-1A
AL CITY FAISALABAD
l Sewerage System
IPC 08
7 to 15.9.2017
Rate As per Claim
Total Claim Claim till Claim for
Contract
till IPC 08 IPC 07 IPC 08
Agreement Amount
(Rs)

- - - - -

- - 6.00 3,600.00 -
- - 8.60 2,800.00 -
- - 744.00 2,300.00 -
-
Claim Justification
Complete revised design provided by Chinese
Engineer and installed under their supervision and
approved by PM through CMD#10
Malik MIJ Chunxing Resources Recycling Co. L
PLOT # 50 PHASE-1A
M3 INDUSTRIAL CITY FAISALABAD

Desulfurization Poo
for IPC 09
16-09-2017 to 31-10-2017
Quantity
As per
Accumulative
Construc-
Item No. Description of Items Unit Quantity till
tion
IPC 09
drawings

SECTION-2 CONCRETE WORKS


2.4 Structural Concrete
R.C.C in Walls

2.4.1 M³ 222.00 213.28

TOTAL:Amount
s Recycling Co. Ltd,
SE-1A
FAISALABAD

rization Pool
r IPC 09
to 31-10-2017
Claim
Total Rate As per
Total Claim Claim for
Claim till Contract Amount
till IPC 09 IPC 09 Claim Justification
last IPC Agreement (Rs)

- - - 16000.00 3,412,480.00

- - - 3,412,480
Malik MIJ Chunxing Resources Recycling Co. Ltd,
PLOT # 50 PHASE-1A
M3 INDUSTRIAL CITY FAISALABAD
SUMMARY OF CLAIMS

for IPC 09
16-09-2017 to 31-10-2017
Excess work claim
Sr. till IPC 06
Description
No.
Amount (Rs)

Main Plant Building (A)


1 4,797,664
o Civil Works

2 Admin Building 427,723


o Civil Works

3 Desulferization Pool
3,412,480
o Civil Works

4 Washing Area
o Civil Works 4,455,000
Total Claim Amount: 13,092,867