Sie sind auf Seite 1von 2

DIgSILENT

PowerFactory

Application Example

Transmission System

Contingency Analysis

1 Description
This example uses Study Case is “02 Contingency Analysis”, which is linked to the “Base
Scenario”. The Study Case time has been set to 18:00 on 31st October.
Pre-defined fault cases are used, which are set up in the Operational library, together with
some Fault Groups.

2 PowerFactory Project Information


Name of Project: Transmission Example
Name of Study Case: 02 Contingency Analysis

Transmission System - Contingency Analysis 1


DIgSILENT GmbH
Heinrich-Hertz-Strasse 9
D-72810 Gomaringen
Tel.: +49 7072 9168 - 0
Fax: +49 7072 9168 - 88
http://www.digsilent.de
e-mail: mail@digsilent.de

Transmission System - Contingency


Analysis

Published by
DIgSILENT GmbH, Germany

Copyright 2016. All rights


reserved. Unauthorised copying
or publishing of this or any part
of this document is prohibited.

Doc. Rev. No. 3,


31 Oktober 2016

Transmission System - Contingency Analysis 2