Presentation Overview

 Benefits of Modularization for


fast track delivery of projects

 UOP Products and Services for


Modular Refinery Units

 UOP’s Modular Work Process

2 UOP 6600G-2
UOP Offers Complete Solutions

 Complete Technology Package


– Basic Engineering Design
– Key mechanical equipment
– Engineering services
– *Modular construction
– Installation support
– Inspection Services
(Key equipment, Rx, Comp, HX)
– Planning and consulting studies
 Since 1987, UOP has sold more than
270 Modular projects to our licensees
and EPC contractors around the world

3 UOP 6600G-3
What We Understand
of Russian Project Basis
 Limited local resources to
execute and fabricate units
 Remote location
 Timely Delivery
 High Quality
 Technical on-spec
performance
 Cost Effective Execution
scheme
 Meeting local codes (GOST)
 Layout for ease of operation
and maintenance teams
 Safe execution
 Risk management

4 UOP 6600G-4
Why Modular?

Current challenges to Russian Projects


 Long schedules not meeting market demands
 Project timing and budget overruns common
 RDIs overburdened
Opportunities for improvement
 Better management of project design phases
 Improved transfer of technical design to EP contractors
 Early procurement of critical equipment to reduce risk
and improve schedule
 Modular equipment to reduce construction time / site
congestion and complexity

Lower risk and improved NPV


Reduces schedule, fixes cost, eliminates difficult site construction
5 UOP 6600G-5
Why UOP Modular?
Traditional “stick-build” approach Modular Supply by UOP

VS

• Site Congestion • Quality Assurance and Control


• Poor Site Logistics • Reduced Site Congestion
• More Cranes and Crane Time • Easier and Safer Site Logistics
• Longer Schedule • Limited Crane Usage
• Higher Safety Risk • Shorter Schedule
• Higher Execution Risk • Low Safety Risk
• Weather becomes a factor/risk • Low Execution Risk
• Low Labor Requirements
6 UOP 6600G-6
UOP Modular Products
Since 1987, UOP has sold more (3) 1 Under
than 270 Modular projects Execution
Around the world
• CCR™ Regenerator Sections 65
• Recovery Plus™ Systems 37
• Isomerization Units 17
• NGL Separation Units 90
• Offshore Separex™ Systems 15
• Merox ™ Units 55
• Naphtha Block Units 3 15 55
53

65 37 17

90

7 UOP 6600G-7
UOP Modular CCR Regenerator

Specialized Technology

 Continuous Solids Transfer - Special piping


& equipment layout requirements
 Over 500 instruments, including analyzers
and nuclear level instruments
 Operating at temperature over 500°C and
in corrosive conditions requires special
metallurgy
 Large height-to-width ratio of the structure
 Need operation & maintenance friendly
layout at lower decks, where equipment,
piping, and instrument density is high

8 UOP 6600G-8
UOP Modular CCR Regenerator
Experience List
 UOP has sold (65), designed and delivered more
CCR Regenerator Sections than any
other Contractors

– 300 PPH (1 unit) – 2000 PPH (3 units)


– 450 PPH (5 units) – 2500 PPH (1 units)
– 700 PPH (6 units) – 3000 PPH (3 units)
– 1000 PPH (15 units) – 4500 PPH (6 units)
– 1500 PPH (13 units) – 6000 PPH (1 unit)
– 7000 PPH (3 units)
 Only UOP Modular has supplied every type and
capacity of UOP CCR Regenerator Section
 UOP has delivered three Modular CCR units
for Russia to date
– Tanneco – Delivered 2010
– Sibur - Delivered 2011
– Rosneft -Tuapse, Delivered 2013
– ZAO Antipinsky – In progress
– Gazpromneft, Moscow Oil- In progress

9 UOP 6600G-9
Modular-Site Installation, SIBUR CCR

10 UOP 6600G-10
Modular-Site Installation, SIBUR CCR

11 UOP 6600G-11
Modular-Site Installation, SIBUR CCR

12 UOP 6600G-12
Modular-Site Installation, SIBUR CCR

13 UOP 6600G-13
UOP CCR Platforming Reactor Supply

 UOP Modular delivery of the CCR


Platforming stacked reactors enables
fast-track project execution
 Delivery of the reactors together with
the Modular CCR Section optimizes
crane use for cost savings

14 UOP 6600G-14
UOP Modular: Penex / DIH
 UOP is the leading world-wide provider of
isomerization technology. More than 120 Penex
units are in operation.
 A Penex Process Unit designed and built under
UOP supervision is the most effective way to insure
UOP process requirements are satisfied.
 UOP Modular has delivered 10 Penex units, ranging
in combined feed capacity from 1,500 bpsd to 27,000
bpsd (50 – 900 kMTA)

15 UOP 6600G-15
UOP Modular Penex / DIH Process Unit

16 UOP 6600G-16
UOP Modular Penex / DIH Process Unit

17 UOP 6600G-17
Refinery Configurations –
Where Does Merox Fit?
Fuel Gas
Extraction Fuel Gas

Saturate LPG
Gas. Con. Extraction LPG

LSR
Gasoline
Sweetening
Naphtha
Naphtha PlatformingTM Gasoline
ATM HDS
HDS Unit
Crude Kerosene/
Tower Kerosene/
Jet Fuel
Jet Fuel
Sweetening
Diesel
Diesel
HDS
Merox Diesel
Diesel

LPG Alkylation
FCC Extraction Inalk
Cat. Con.
Vacuum
Tower FCC Heavy
Heavy
Gasoline Fuel
FuelOil
Oil
Sweetening

18 UOP Confidential UOP 6600G-18


Refinery Scope of Supply
OSBL (utilities, controls etc) UOP Scope
Sat Gas LPG  ISBL process configuration
Plant MeroxTM
 Basic design for ISBL
Isom process units
Unit
NHT  Supply of non-licensed

Products Tankage
Unit
CCR Plat process units (LPG treating,
Unit
1) CDU

Amine etc.)
Kero
MeroxTM  Supply of modular units
as shown
DHT
Unit

Other Services
 Duty spec and FEED design
for OSBL units by UOP
OSBL
UOP
Modular
Not  Site installation Services
offered
Unit during construction
by UOP

19 UOP 6600G-19
Plot Plan – Modularization of UOP Units

20 UOP 6600G-20
UOP’s Work Process
Detailed Design & Procurement Module Fabrication Shipping Installation

Direct incorporation of UOP’s experience from UOP Detailed Engineering


basic engineering and 200+ operating units
into the detailed engineering design

UOP Basic Engineering

UOP procures all tagged equipment and instruments to


feed Detailed Design activities within the first 6-8 months

21 UOP 6600G-21
UOP’s Work Process
Detailed Design & Procurement Module Fabrication Shipping Installation

22 UOP 6600G-22
UOP’s Work Process
Detailed Design & Procurement Module Fabrication Shipping Installation

 UOP prepares Site Installation


Specifications indicating field
activities necessary for site
installation

 UOP Installation Advisor is


dispatched to jobsite to
provide site installation
consulting services

Modular Execution

23 UOP 6600G-23
UOP Value

• With UOP, your risk is minimized:


– UOP’s goal is aligned with your goal
• UOP’s 100 year history insures our commitment to you
and the project
• UOP provides a single point accountability for the
process critical equipment
– UOP stands with our customers to ensure flawless start-up
• UOP’s worldwide technical support helps our customers
maximize their profit by optimizing on-stream reliability

24 UOP 6600G-24
UOP Experience in Russia

Customer Scope Status


Tanneco, Nizhnekamsk Modular CCR Regenerator Delivered 2010

Sibur, Tobolsk Modular CCR Regenerator Delivered 2010


• Modular CCR Regenerator
Rosneft, Tuapse • Platforming Reactor Delivered 2010
• High Flux Exchangers

• Modular CCR Regenerator


Antipinsky, Tyumen In Progress
• Platforming Reactor

Gazpromneft, Moscow Modular CCR Regenerator In Progress

25 UOP 6600G-25
26 UOP 6600G-26