Sie sind auf Seite 1von 2

PROJECT: FIELD ERECTION OF 15000 BBLs TANK (IK-

2545) F O R M S

Job Safety Analysis Doc. Level IV Doc. Version: 00

Painting Work in Cofined Space


Doc. No.: HSE-FRM-43 W.e.f: 20-3-2012
JSA Date: 05-10-2012 JSA NO:
Assessment Team: Yasin Rind, M.Waqas Farooq, Ahmad Bilal, M. Altaf

PPE's Required: Safety Helmet, Safety Shoes, Gloves, Glasses, and Dust Mask, Blasting
PTW NO.
Hood, Ear Muffs, Coverall

Step

No: Hazard Description &


Description of Task Step Controls Measures Residual Risk Controls
Effect

Conduction of tool box meeting before


Inhalation of paint and lungs Wear dust mask and other PPE's that are mentioned
commencement of job. Display MSDS in working
damage on MSDS.
area.

Wear safety goggles and hand gloves recommended in Conduction of tool box meeting before
Skin and eye irritation
MSDS. commencement of job.
4 Paint work

Fire extinguisher shall be present at the location.


No hot work shall be allowed near painting job.
Conduction of tool box meeting before
Bulk storage shall not be allowed in working area.
commencement of job. Continuous Monitoring of
Fire Hazard MSDS shall be present at site before the start of work.
flammable contents with LEL Meter. Maintain log
Contaminated rags shall be disposed of properly in
sheet for LEL monitoring. Safety signs for sand
designated waste drums.
blasting to be installed.

Prepared By: Reviewed By: Approved By:

Controlled and Confidential @ IKAN Engineering Services (Pvt.) Limited Page 1 Of 2


R M S

Doc. Version: 00

W.e.f: 20-3-2012

Risk Controls

meeting before
Display MSDS in working

meeting before

be present at the location.


meeting before
Continuous Monitoring of
h LEL Meter. Maintain log
g. Safety signs for sand

Controlled and Confidential @ IKAN Engineering Services (Pvt.) Limited Page 2 Of 2

Das könnte Ihnen auch gefallen