2308 South Drive Pueblo CO, 81008

Description Quantity Cost Each($)

2X3 Braceing studs 51 1.78


Terminal Posts 5 19.24
Line Posts 15 14.38
Pickets 320 1.32
Large Hangars 15 2.38
Small hangars 45 2.2
80lb bag Sakrete 5 4.1
60lb bag Sakrete 15 2.67
Terminal post caps 5 1.6
Line post caps 15 0.87
5 lb Box of screws 1 24.73
1 lb Box of Screws 1 7.62

Tax (.073%)
Material Total
Labor Total
Total

All Prices are at my discount rate at Lowes of 10%. Contractor discount is 5%. To calculate the labor I took the cost
of materials and doubled it, and discounted it by $304.22. Tax is calculated at Pueblo rate of .073%. The Pickets are
on order and once arrived will recieve a call that they are available. Estimate does not include disposal of old fence.
This would be an additional $300 to cover dump fees and trailer to haul.
h Drive Pueblo CO, 81008
Total($)

90.78
96.2
215.7
422.4
35.7
99
20.5
40.05
8
13.05
24.73
7.62

1073.73
78.38
1152.11
2000
3152.11