This item shall consist of furnishing and erecting fencing and gates in accordance to the specifications and the
details shown on the drawings or as directed by the E.R.
This work method statement provides information concerning method of application to ensure compliance with
technical specification.
2.0 DESCRIPTION
To describe the method on how the installation of fence and gate are carried out with approval from E.R.
3.0 MATERIALS
a. Chain link fencing
· PVC coated galvanised chain link fence and accessories
· Angle post
· Formwork
· Concrete mix G20
b. High tensile cable fencing
· High tensile cable fence and accessories
· GI post
· Concrete mix G20
c. GI railing
· GI pipe & GI post
· Welding equipment
· Concrete mix G20 & G30
Prior to the beginning of the work or upon the request of the Consultant, the Contractor shall locate the position
of the work by establishing and marking the fence line. The finished fence shall be plumb, taut, true to line and
ground contour, and complete in every detail.
There are five (5) basic steps involved in installing the fence and each of those steps has several different, equally
effective options. There are;
· Deciding how many wires need and then marking how high up and far apart they need to be placed on the ends
and corners.
· Insulating the wires from the end and corner posts.
· Stretching the wire.
· Connecting the wire.
· Installing the in-line strainers, tension spring and then tightening the wire.
For handrail, all workmanship shall be of first class quality in every respect, the greatest accuracy being observed
to ensure that all parts will fit together properly on erection. Erection procedure shall be in accordance with
approved proposal (mock-up). During erection care shall be taken to avoid any shock, dynamic or vibrationary
loading of the members. All holes shall be accurately marked off from templates or corresponding plates, and
drilled, except in plates or under, when they may be punched. Holes should be cleaned or burrs or rough edges
and counter-sunk where required. The surface area must be cleaned before proceed the work.
4.2.3 Bracing
All corner, end, pull, and gate posts shall be braced as shown on the drawings. Pull posts shall be used at sharp
breaks in vertical grade or as directed by the Consultant.
4.3.3 Bracing
All corner, end, pull, and gate posts shall be braced as shown on the drawings. Pull posts shall be used at sharp
breaks in vertical grade or as directed by the Consultant.
(a) Insulating the cable from the ends and corner posts.
Once the 12mm diameter high-tensile cable placements on the end and corner post have been set, insulate the
cable from the posts. Next, fasten the ends of the wire together.
(b) Stretching and fastening the cable.
Compared to other types of fences, this is probably one of the easiest parts of the whole process. The cable must
be stretching and fastening using cable tension.
(c) Installing the in-line strainers, tension spring and then tightening the cable.
The final step in the process is tightening the cable. Once the fence cable has been hooked to the ends it run the
inline strainers can be installed.
4.4 GI RAILING
4.4.1 Clearing GI Railing Lines
The site of the GI railing shall be sufficiently cleared of obstructions, and surface irregularities shall be graded so
that the railing will confirm to the general contour of the ground. The railing line shall be cleared on each side of
the railing centreline. This clearing shall consist of rocks or other obstructions that will interfere with proper
construction of railing.
4.4.3 Bracing
All corner, end, pull, and gate posts shall be braced as shown on the drawings. Pull posts shall be used at sharp
breaks in vertical grade or as directed by the Consultant.
All workers shall educate on good environmental management practices and well-disciplined to
environment.
The garbage bin shall be provided at the working area and Supervisor shall ensure its must be collected
regularly and disposed-off at the approved dumpsite.
Safety team shall ensure that no open burning of construction or domestic wastes is practiced.
All workers shall ensure that all tools and equipment machinery are in good condition to avoid any oil
leakage that could harm to environment.