QC Form To Be Used to
Description Of QC Activity Referance Specification Acceptance Criteria Comments / Remarks
IRPC
SPM
MSS
Verify Compliance
Reference
1 General
As marked according to
2 Remove existing damaged refractory inspection
2.2 Inspection after removed and cleaned by blasting. Visual Inspection - V R Power tool cleaning at area can not blasting
Page 1 381709274.xls
S/C Reference: Subcontractor: Reference:
INSPECTION AND TEST PLAN Rev. 0
SP Mechanical Engineering Co.,Ltd ITP No. SPM-IRPC-02/2014
Description:
Sheet : 1/2
INSPECTION & TEST PLAN FOR REFRACTORY INSTALLATION Project:
Location Where ITP is Applicable: Repair Refractory at DCC Plant
Date: 30-May-2014
Convertor Unit at DCC Plant
Inspection Level
Activity No.
Signature
Signature
Signature
QC Form To Be Used to
Description Of QC Activity Referance Specification Acceptance Criteria Comments / Remarks
IRPC
SPM
MSS
Verify Compliance
Reference
4.1 Coating casing with coal tar Manufacturer Instruction Blasting according to requirements V R
As marked according to
7 Refractory's repair inspection
- Following Materials Spec.
Date
Page 2 381709274.xls