Storm
Fixing Fix
Pack
Using a 10mm drill bit, drill through the rear Insert StormFix Blue Frame Fixing sleeve 120 into x4
structural timber rail into wall structure at a maximum the drilled holes. Once the StormFix Blue Fixing
In Partne
rship With
of 450mm centres, to suit the StormFix 120 Fixing. Sleeves have been inserted into the holes, fully screw
The centre hole of the MS steel brackets can be used the StormFix 120 fixings into the sleeves.
if appropriate.
3 4
Storm
Fixing Fix
Pack
The roof unit is positioned onto the base unit. Insert StormFix Blue Frame Fixing sleeve 80 x4
Using a 10mm drill bit, drill through the GRP upstand into the drilled holes.
In Partne
rship With
5 6
Once the StormFix Blue Fixing Sleeves have been GRP Roof downstand to be fixed to GRP base using fir tree
inserted into the holes, fully screw the StormFix 80 fixings as supplied. The upstand must be over flashed in
fixings into the sleeves. 113
lead or mastic sealed.
EMS CERTIFICATE 10/E005
ISO 14001
Fixing Handling
The GRP base is fixed to the structure through the rear fixing rail. Mouldings can usually be carried manually.
The roof unit is positioned onto the base unit. are should be taken not to
C
damage the surface of the GRP.
tarting from the centre of the canopy,
S
the GRP upstand is fixed to the wall using
StormFix 80 fixings at max 450mm centres.